Saputra, Ihkrom Wahyu (2017) Analisa Kebutuhan Daya Sistem Bilga Menggunakan Pompa Torak Type 2pmfl 112/ 125/ 2,5 Pada Kri. Sultan Nuku. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK KRI. Sultan Nuku merupakan kapal perang milik Armatim Surabaya yang sedang berada dalam proses pengedockan kapal. Untuk menunjang kegiatan operasionalnya terutama pada sistem bilga, KRI. Sultan Nuku menggunakan Pompa Torak Type 2PMFL 112/ 125/ 2,5. Pompa torak tersebut digunakan untuk mengeluarkan fluida kotor dari sumur bilga (bilge well) melalui overboard. Pompa torak tersebut telah mengalami penurunan kapasitas dari 40 m 3 /h menjadi 28 m 3 /h, sehingga tidak mampu beroperasi secara maksimal. Beberapa parameter yang digunakan untuk mengetahui kinerja pompa meliputi kapasitas actual, head losses, head total dan daya actual. Dengan mengetahui besarnya daya actual, maka dapat dihitung besarnya prosentase error penurunan performa pompa. Berdasarkan hasil perhitungan performa pompa torak, diketahui bahwa besarnya head losses mayor dan minor yang dihasilkan sebesar 12,346 m, dengan head pompa sebesar 16,704 m. Daya aktual motor pompa torak tersebut adalah , sedangkan berdasarkan spesifikasi adalah . Sehingga dari hasil perhitungan dan analisa tersebut dapat disimpulkan bahwa performa pompa torak telah mengalami penurunan performa sebesar 25,56%. Kata kunci : Daya, KRI. Sultan Nuku, Performa, Pompa Torak. ABSTRACT KRI. Sultan nuku is a war ship belonging to the Indonesian naval base in Surabaya was in the process of docking the ship for reparation. To support their operations especially on a bilge system, KRI. Sultan nuku use the reciprocating pump type 2PMFL 112 / 125 / 2.5 . The reciprocating pump used to cast dirty fluid from bilge wells through overboard. The reciprocating pump has decreased the capasity from 40 m 3 /h to 28 m 3 /h, so that not capable to operating in maximum. Some parameters that used to know the performance of the pump were actual capacity , head losses ,total head and actual power. With knowing the actual power, then the magnitude of the error percentage of decrease in pump performances can be calculated. Based on the result of the calculation of the reciprocating pump performances, it’s known that the magnitude of the mayor and minor head losses by 12,346 m, with the pump head of 16,704 m. The actual power of reciprocating pumps was 1,861 KW, but based on specification was 2,5 KW. So from the results of the calculation and analysis it can be concluded that the performances of the reciprocating pump has decreased performances by 25,56%. Keywords: KRI .Sultan Nuku , Performance , Reciprocating Pump
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Jurusan Teknik Permesinan Kapal > D3 Teknik Permesinan Kapal |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 20 Sep 2018 02:45 |
Last Modified: | 20 Sep 2018 02:45 |
URI: | http://repository.ppns.ac.id/id/eprint/978 |
Actions (login required)
View Item |