ANALISA KETERLAMBATAN PENGERJAAN BLOCK 211 DAN 311 KAPAL PERINTIS 2000 GT DARI SCHEDULE PERENCANAAN DI PT. DUMAS TANJUNG PERAK SHIPYARD

Wuryaningrum, Nanda Dwi (2017) ANALISA KETERLAMBATAN PENGERJAAN BLOCK 211 DAN 311 KAPAL PERINTIS 2000 GT DARI SCHEDULE PERENCANAAN DI PT. DUMAS TANJUNG PERAK SHIPYARD. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Time schedule dalam proyek konstruksi kapal merupakan rencana alokasi waktu untuk menyelesaikan masing-masing item pekerjaan proyek pembangunan kapal secara keseluruhan dalam rentang waktu yang ditetapkan untuk melaksanakan proyek konstruksi kapal tersebut. Dalam proyek konstruksi kapal sangat diperlukan adanya time schedule agar proyek tersebut dapat berjalan dengan lancar sesuai dengan waktu yang direncanakan. Sehingga keterlambatan dalam proyek konstruksi kapal dapat dihindarkan. Proses pembangunan kapal sangat identik dengan pemecahan bagian-bagian badan kapal menjadi beberapa block kapal. Dalam penulisan Tugas Akhir, penulis melakukan analisa untuk membandingkan schedule perencanaan dengan progress pengerjaan block di lapangan PT. Dumas Tanjung Perak Shipyard Surabaya, dengan mengambil sample block kapal, yaitu block 211 dan 311 kapal perintis 2000 GT. Selain itu faktor-faktor yang menyebabkan keterlambatan pengerjaan proyek konstruksi kapal harus dianalisa untuk ditanggulangi. Dalam penulisan Tugas Akhir ini, untuk menganalisa, penulis membuat Critical Path Method (CPM), melakukan perhitungan waktu efektif (te), serta standard deviasi pada block 211 dan 311 kapal perintis 2000 GT tersebut. Kata kunci: time schedule, block, waktu efektis (te), CPM ABSTRACT Time schedule in a project construction of ships is the allocation plan for the time to finish each items of the project construction of ships as a whole within the span of time assigned for carrying out a project the the construction of ships. In a project construction of ships is greatly needed time schedule so that the project would go well in accordance with the time planned. So that project delays in the construction of ships could be avoided. The process construction of ships very identical with the solution of the parts hull ships into several block of a ships. In writing this final project, writer do analysis to compare schedule planning with the implementation of the project block progress in the shipyard of PT. Dumas Tanjung Perak Shipyard Surabaya, by taking sample block of a ships, block 211 and 311 a pioneer ship 2000 GT. In addition the cause of the project delay construction a ship must be were analysed to overcome. In writing this final project, to analyze , writer make critical path method (CPM), performing calculations effective time (te), And standart deviations in block 211 and 311 a pioneer ship 2000 GT. Keyword: time schedule, block, effective time (te), CPM

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D4 Teknik Perancangan dan Kontruksi Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 19 Sep 2018 03:20
Last Modified: 19 Sep 2018 03:20
URI: http://repository.ppns.ac.id/id/eprint/920

Actions (login required)

View Item View Item