Farhan, Muhammad (2017) ESTIMASI KEBUTUHAN PELAT BAJA PADA PROSES REPLATING KMP. NUSA MAKMUR. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK Kapal merupakan alat transportasi armada laut yang umum digunakan. Dalam proses reparasi kapal, perawatan lambung dan cardeck kapal sangatlah penting karena merupakan komponen inti. Terkikisnya pelat akibat pengkaratan dan kebocoran sangat berpengaruh terhadaap keselamatan.oleh karena itu, maka Pelat lambung maupun pelat cardeck yang sudah tidak memenuhi syarat minimum yang telah ditetapkan dan terjadinya lubang pada pelat haruslah dilakukan proses replating atau perbaikan ulang. Dalam proses replating plate, pemakaian pelat yang biasa digunakan di perusahaan galangan reparasi kapal terbilang cukup boros karena menggunakan metode manual yang cenderung banyak menyisakan pelat sisah hasil dari margin yang diberikan. Maka dari itu, dibutuhkan perhitungan dan penataan model pelat (nesting) sebelum pelat tersebut dilakukan proses cutting sebagai bahan untuk mengetimasikan kebutuhan pelat. Dengan dilakukannya estimasi kebutuhan pelat maka dapat membantu kita untuk meminimalisir pelat baja yang tersisah dari pengerjaan replating plate tersebut. Kata kunci : pelat lambung, pelat cardeck, replating, nesting, estimasi. ABSTRACT The ship is a naval fleet of transport commonly used. In the process of ship repair, ship hull and care is extremely important because of the cardeck is a core component. Terkikisnya plate due to leakage and very influential pengkaratan terhadaap salvation. therefore, then stomach Plate or plates cardeck already does not qualify the minimum has been set and the occurrence of holes on the plate must be done process improvement or replating. In the process, the use of plate replating plates used in the company of shipyards and ship repair is quite wasteful because it uses manual methods which tend to be many leaving plates of sisah result of margin are given. Therefore, it takes the Setup calculation and model plate (nesting) before the plate cutting process is conducted as a basis for mengetimasikan needs plates. He did it with the estimated needs of the plate then it can help us to minimise the tersisah steel plate from the plate replating workmanship. Keywords: hull plates, plates of the cardeck, replating, nesting, estimation.
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Jurusan Teknik Bangunan Kapal > D4 Teknik Perancangan dan Kontruksi Kapal |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 19 Sep 2018 02:25 |
Last Modified: | 19 Sep 2018 02:25 |
URI: | http://repository.ppns.ac.id/id/eprint/901 |
Actions (login required)
View Item |