ANALISA PERBANDINGAN KEBUTUHAN JAM ORANG SECARA PERENCANAAN DENGAN PELAKSANAAN DI LAPANGAN UNTUK PEMASANGAN PINTU PADA BLOCK 422 DAN 413

Megawati, Megawati (2014) ANALISA PERBANDINGAN KEBUTUHAN JAM ORANG SECARA PERENCANAAN DENGAN PELAKSANAAN DI LAPANGAN UNTUK PEMASANGAN PINTU PADA BLOCK 422 DAN 413. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Jam orang (JO) adalah jam kerja yang dibutuhkan untuk menyelesaikan suatu pekerjaan sampai pekerjaan tersebut selesai. Consumableadalah material yang sekali pakai dan tidak bisa diperbaiki sepertikawat las dan gas mixing pada pengelasan. Perencanaan kebutuhan jam orang dan consumable sangat penting dilakukan agar tidak terjadi penambahan jam orang dan penggunaan consumable menjadi lebih effisien. Pada Tugas Akhir ini akan membandingkan hasil kebutuhan jam orang dan consumablemelalui perhitungan secara perencanaan dengan pelaksanaan di lapangan untuk pemasangan pintu pada block 422 dan 413 terutama pada tahap markingdan cutting, install door wet serta welding install door wet. Hasil dari analisa perbandingan didapatkan perbedaan jumlah jam orang dan kebutuhan consumableyang digunakan antara perencanaan dengan pelaksanaan di lapangan. Kebutuhan jam orang perencanaan untuk pemasangan pintu pada block422 dan 413 tahapmarkingdan cutting, install door wetset welding install door wetadalah 84 jam orang. Sedangkan pelaksanaan di lapangan untuk pemasangan pintu pada block422 adalah 54 jam orang dan pintu pada block 413 adalah 53 jam orang, terjadi percepatan 1 jam orang. Untuk kebutuhan consumableperencanaan pemasangan pintu pada block422 dan 413 adalah kawat las 2,97 kg dan gas mixing 318,36 liter. Sedangkan pelaksanaan di lapangan untuk pemasangan pintu pada block422 adalah kawat las 5,28 kg dan gas mixing 528,09 liter serta pintu pada block413 adalah kawat las 4,754 kg dan gas mixing 395,28 liter. Sehingga pemasangan pintu pada block413 untuk kawat las 11,06% dan gas mixing 33,59% lebih efisien dibandingkan dengan pemasangan pintu pada block 422. Maka progress pemasangan pintu pada block422 dan 413 berjalan sesuai perencanaan, karena mengalami percepatan jam orang.Sedangkan consumable yang digunakan mengalami penambahan dari perencanaan. Kata Kunci: Jam Orang, Consumable, Block ABSTRACT Man hours (JO) is the hours of work required to complete a job until the job is completed. Consumable means materials that are disposable and can not be fixed, such as welding wire and gas mixing in welding. Planning of man hours and consumable needs is very important in order to avoid the additional of man hours and so the use of consumable becomes more efficient. This final project will compare the results of man hours and consumable needs through calculations in planning with the reality happening in the field for the door installation in block 422 and 413, especially at the stage of marking and cutting, install door wet, and welding install doorwet. From the results of comparative analysis, found differences in the number of man hours and consumable needs used between planning and the realization in field. The needs of man hours in planning for the installation of doors in block 422 and 413 at marking and cutting stage, install door wet set welding install door is 84 man hours.While the realization in field for the installation of door in block 422 is 54 man hours and the door in block 413is 53 man hours, there was an acceleration of 1 man hours. For consumable needs in planning, the installation of door in block 422 and 413 is 2,97 kg of welding wire and 318,36 liters of gas mixing. While the realization in field for the installationof doors in block 422 is 5,28 kg of welding wire and 528,09 liters of gas mixing and doors in block 413 is 4,754 kg of welding wire and 3955,28 liters of gas mixing. So that the installation of the door in block 413 for welding wire and gas mixing is 11,06% and 33,59% consecutively more efficient than the installation of door in block 422. Then, the door installation progress in block 422 and 413 goes according to plan due to the man hours’ acceleration. While the consumable used get some additions from planning. Keywords: Man hours, Consumable, Block

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D4 Teknik Perancangan dan Kontruksi Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 25 Aug 2018 03:37
Last Modified: 25 Aug 2018 03:37
URI: http://repository.ppns.ac.id/id/eprint/90

Actions (login required)

View Item View Item