ANALISA PENGARUH EROSI TERHADAP KELAYAKAN JALUR PIPA DARI INLET SEPARATOR MENUJU SLUG CATCHER DI PGN SAKA

Satriawan, Muhamad Angga Raymon (2016) ANALISA PENGARUH EROSI TERHADAP KELAYAKAN JALUR PIPA DARI INLET SEPARATOR MENUJU SLUG CATCHER DI PGN SAKA. Other thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK    Pengeboran dari sumur whp-a dan whp-b yang berlokasi di Ujung Pangkah  laut Madura dieksploitasi oleh PGN Saka Ltd. Hasil dari pengeboran tersebut berupa  minyak mentah dan gas alam yang masih tercampur dengan kotoran/slug. Adanya  kandungan slug  dari  sumur yang ikut  terbawa  aliran  fluida  pada  jalur  pipa  mengakibatkan gesekan antara partikel slug dengan dinding pipa tidak bisa dihindari,  ditambah adanya perubahan diameter pipa dari 10” menjadi 8” mengakibatkan faktor  berkurangnya ketebalan dinding pipa semakin besar.   Metode analisa  pada tugas  akhir  ini  dilakukan  dengan  cara menghitung nilai  kecepatan  fluida  campuran  menggunakan  perhitungan  manual  dan  hasil  yang  diperoleh dari software, yang kemudian akan dijadikan referensi untuk menghitung  laju erosi tiap tahun pada pipa, valve, elbow dan reducer. Hasil yang didapatkan dari  analisa laju erosi ini yaitu nilai umur pakai tiap material dengan mengacu pada tebal  aktual, tebal minimum dan laju erosi material.    Hasil perhitungan  tersebut  akan  dijadikan bahan  analisa  untuk  menentukan  layak  tidaknya  material untuk tetap  beroperasi dibandingan dengan life time plan construction. Angka yang didapat dari hasil perhitungan kecepatan campuran sebesar  24.962  m/s  untuk  perhitungan  manual,  dan  25.477  m/s  dari  software  pipe  flow  expert. Laju erosi yang didapakan dari perhitungan sebesar 0.3, 1.8, 1.2, 0.15, 0.20,  2.73 mm tiap tahun untuk masing-masing material pipa 10”, pipa 8”, valve, elbow  10”, elbow 8” dan reducer. Angka yang didapatkan dari hasil perhitungan life time  pada material pipa 10”, pipa 8”, valve, elbow 10”, elbow 8” dan reducer masing-masing memiiki nilai life time sebesar 36, 6, 9, 87, 9 dan 5 tahun.        Kata Kunci :   Erosion rate, inlet separator, life time, Minimum wall thickness, Slug catcher.  ABSTRACT Drilling of well head platform whp-a and whp-b are located in the deep sea of  Pangkah Madura exploited by PGN Saka Ltd. Results from the drilling are in the  form of crude oil and natural gas are still mixed with dirt / slug. The content slug of  wells carried on fluid flow in a pipeline lead to friction between particles slug with  the pipe wall can not be avoided, plus the change in pipeline diameter from 10 "to 8"  lead to a reduction factor of the pipe wall thickness increases.  Methods of analysis in this final project is done by calculating the value of the  speed of fluid mixture using manual calculations and the results obtained from the  software, which will then be used as a reference to calculate the rate of erosion each  year on pipes, valves, elbows and reducers. The results obtained from the analysis of  the  erosion rate  is  a  value lifespan  of  each  material  with  reference  to the  actual  thickness, the minimum thickness and the erosion rate material.  The results of these calculations will be used as material analysis to determine  the appropriateness of the material to remain in operation compared with the life time  plan construction. Figures obtained from the calculation speed of a mix of 24,962 m /  s for the manual calculation, and 25,477 m / s of pipe flow software expert. The rate  of erosion didapakan from the calculation of 0.3, 1.8, 1.2, 0.15, 0.20, 2.73 mm per  year for each of the pipe material 10 ", pipes 8", valve, elbow 10 ", elbow 8" and  reducer. Figures obtained from the calculation of the life time of the pipe material 10  ", pipes 8", valve, elbow 10 ", elbow 8" and reducer respectively coined the value of  life time by 36, 6, 9, 87, 9 and 5 years old.            Key Word     :  Erosion rate, inlet separator, life time, Minimum wall thickness, Slug catcher.

Item Type: Thesis (Other)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Permesinan Kapal > D4 Teknik Perpipaan
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 18 Sep 2018 03:30
Last Modified: 18 Sep 2018 03:30
URI: http://repository.ppns.ac.id/id/eprint/840

Actions (login required)

View Item View Item