Permana, Alfian Sandi (2016) OPTIMASI WAKTU DAN BIAYA PERANCANGAN PADA PEMBUATAN PIG LAUNCHER DI PT. TUBAN STEEL WORK. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK PT. Tuban Steel Work (PT. TSW) merupakan sebuah perusahaan yang bergerak dibidang industri manufaktur yang memiliki kemampuan untuk merancang dan membuat pressure vessel, heat exchangers, process piping, steel structure, flare stackdan storage tank. Perusahaan ini beroperasi dengan system job order, yaitu bekerja berdasarkan pesanan klien industri lainnya. Selama ini pengelolaan proses produksi terkadang hanya mengandalkan senioritas dan pengalaman pekerja, dengan begitu pekerjaaan pembuatan Pig Launcher mengalami keterlambatan pengerjaan selama 10 hari. Akibat dari keterlambatan ini perusahaan mengalami kerugian dari segi waktu dan biaya. Analisa optimalisasi dalam hal ini sangatlah penting karena mampu mengembalikan proyek pada rencana semula, sehingga biaya produksi dapat diminimalkan. Variabel yang digunakan dalam pengendalian proyek ini di dasarkan pada proses produksinya yang berkaitan dengan pengelasan. Variabel pertama adalah variasi kampuh single v dengan sudut 60 0 , 65 0 , 70 0 dan kampuh single bevel dengan sudut 45 0 , 50 0 , 55 0 , dan variabel kedua adalah penggunaan proses pengelasan yaitu GTAW + SMAW dan SMAW. Langkah selanjutnya yaitu mengolah data dengan peritungan menggunakan metode CPM (Critcal Path Metode) dan dibandingkan dengan hasil pengolahan software WinQSB. Hasil dari penilitian ini adalah durasi proyek dapat di percepat selama 9 hari dari waktu yang direncanakan. Dengan lintasan kritis pengerjaan Pig Launcher adalah A – C – I – J – K – L – M – N – O. Dengan begitu durasi waktu proyek tidak mengalami keterlambatan dan biaya produksinya dapat di tekan sebesar Rp. 13.014.942 dengan menggunakan kampuh single bevel sudut 45 0 dan proses pengelasan SMAW. Kata kunci : Pig Launcher, Analisa optimalisasi,Variabel, CPM, WinQSB. ABSTRACT PT. Tuban Steel Work (PT. TSW) is a company engaged in the manufacturing industry that has the ability to design and fabricate pressure vessels, heat exchangers, process piping, steel structure, flare stack and storage tanks. PT. Tuban Steel Work (PT. TSW)use job order system(works on the basis of other industrial client orders. The managament of production process in PT Tuban Steel Work (PT. TSW) sometimes depend on seniority and employe’s experiences which caused the production of Pig Launcher delayed until 10 days and suffered losses in terms of time and costs. Optimization analysis in this case is important because it is able to return the project to the original plan and minimize production costs. Variables used in the control of this project is based on the production process related to welding. The first variable is the single v hem variation with angle of 60°, 65°, 70° and hem single bevel with an angle of 45°, 50°, and 55°. The second variable is the application of welding processes are SMAW and GTAW + SMAW. The next step is processing the data with calculations using CPM method (critcal Path Method) and compared with the WinQSB software processing results. Results of this research is the duration of the project can be accelerated for 9 days from the time planned with the Pig Launcher critical path constructions are A - C - I - J - K - L - M - N – O. Therefore the duration of the project is not delayed and the cost of production can be on tap Rp 13.014.942 by using a single bevel hem with angle 45° and SMAW welding process. Key word : Pig Launcher, Optimization analysis,Variable, CPM, WinQSB
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Jurusan Teknik Bangunan Kapal > D4 Teknik Pengelasan |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 17 Sep 2018 02:13 |
Last Modified: | 17 Sep 2018 02:13 |
URI: | http://repository.ppns.ac.id/id/eprint/793 |
Actions (login required)
View Item |