OPTIMASI PENJADWALAN DAN BIAYA PADA PEMBUATAN STERILIZER SINGLE DOOR TYPE DENGAN KAPASITAS 154 M 3

Bayu P, Gilang Ramadhan (2016) OPTIMASI PENJADWALAN DAN BIAYA PADA PEMBUATAN STERILIZER SINGLE DOOR TYPE DENGAN KAPASITAS 154 M 3. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Perusahaan pada umumnya mendapatkan proyek atau job order yang memiliki batas waktu (deadline) yang telah disepakati oleh pihak customer. PT Bromo Steel Indonesia ini banyak mengalami kendala dalam aspek penentuan perencanaan pengerjaan suatu produk. Dalam melaksanakan perencanaan perkerjaan dilakukan berdasarkan pengalaman yang telah dikerjakan dan pengalaman pekerja sehingga estimasi untuk memproduksi kurang maksimal. Dalam penelitian ini untuk pengolahan data menggunakan metode optimasi CPM (Critical Path Method), supaya sterilizer single door type yang dikerjakan berjalan dengan sesuai jadwal ditentukan atau bahkan lebih cepat. Dari penelitian ini diperoleh untuk waktu yang optimal pada pembuatan sterilizer single door type setelah melalui lintasan kritis adalah dengan durasi 55 hari. Biaya total pengelasan menggunakan variasi kampuh 60˚ sebesar Rp. 72.461.360, sedangakan biaya total pengelasan dengan menggunakan variasi 45˚ kampuh sebesar Rp. 34.271.258, sehingga selisih biaya sebesar Rp. 38.190.102. Kata kunci : sterilizer single door type, Critical Path Method, lintas kritis, variasi, over head. ABSTRACT Companies generally get a project or job order that has a time limit (deadline) has been agreed by the customer. PT. Bromo Steel Indonesia have experienced many obstacles in the determination of the planning aspects of the work of a product. In carrying out the planning of the work was done based on the experience that has been done and the experience of workers so as to produce less than the maximum estimate. In this study for data processing using the optimization method CPM (Critical Path Method), so that the sterilizer single door type is done running on schedule determined or even faster. From this research is obtained for the optimal time in the manufacture of single door type sterilizer after passing the critical path is the duration of 55 days. The total costs seam welding using a variation of 60˚ Rp. 72.461.360 million, while the total cost of seam welding by using a variation of 45˚ Rp. 34.271.258, so the difference in cost of Rp. 38.190.102. Keywords: sterilizer single door type, Critical Path Method, critical path, variation, over head.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D4 Teknik Pengelasan
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 17 Sep 2018 02:08
Last Modified: 17 Sep 2018 02:08
URI: http://repository.ppns.ac.id/id/eprint/792

Actions (login required)

View Item View Item