ANALISA KETERLAMBATAN PEMBANGUNAN KAPAL “KMP.BINAUL” DALAM PROSES HULL CONSTRUCTION DI GALANGAN PT.ADILUHUNG SARANASEGARA INDONESIA

Murti, Bima Hari (2016) ANALISA KETERLAMBATAN PEMBANGUNAN KAPAL “KMP.BINAUL” DALAM PROSES HULL CONSTRUCTION DI GALANGAN PT.ADILUHUNG SARANASEGARA INDONESIA. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

Dalam proses pembangunan kapal diperlukan pengelolaan managemen yang baik agar pencapaian keuntungan dapat diperoleh secara maksimal dan progress yang dijalankan dapat selesai tepat waktu. Pengaplikasian WBS (Work Breakdown Structure) pada suatu proyek bertujuan sebagai fungsi pengendalian biaya, jadwal, dan material. Sehingga dapat meminimalisir terjadinya kendala yang menyebabkan galangan mengalami kerugian akibat dari keterlambatan dalam pembangunan kapal terutama dalam proses hull construction. Namun dalam proses pelaksanaan sering terjadi hambatan-hambatan yang tidak diketahui sebelumnya. Untuk itu perlu dilakukannya penelitian untuk mengetahui faktor-faktor penyebab keterlambatan dalam menyelesaikan proyek pembangunan supaya waktu pengerjaan proyek tepat waktu. Tujuan dari penelitian ini adalah untuk menganalisa faktor-faktor yang menyebabkan keterlambatan pembangunan dalam proses hull construction pada kapal Ro Ro Ferry 150 GT (KMP. BINAUL) dan menentukan solusi dari faktor-faktor tersebut. Penelitian ini menggunakan metode wawancara.Sumber wawancara adalah pihak yang memegang jabatan sebagai manager lapangan (pimpinan proyek) dan pekerja proyek (sub kontraktor). Hasil dari analisa diketahui terjadi keterlambatan selama 65 hari. Terdapat banyak faktor yang menyebabkan keterlambatan sehingga progress pembangunan tidak tepat pada waktunya. Faktor-Faktor penyebab keterlambatan tersebut meliputi, tenaga kerja, lingkungan, material, fasilitas, dan peralatan. Kata Kunci : Hull Construction, WBS, Keterlambatan, Faktor Keterlambatan In the process of ship construction management required good management so that the achievement of maximum benefit can be obtained and the progress being run can be completed on time. Application of WBS (Work Breakdown Structure) on a project aimed as a function of cost control, schedule, and material. So as to minimize the obstacles that led to the shipyard suffered losses due to delays in the building of ships especially in the hull construction process. But in the process of implementation of the common obstacles that are not known in advance. For that we need research to determine the factors that cause delays in completing development projects in order timely project timeline. The purpose of this study was to analyze the factors that cause delays in the process of construction of hull construction on Ferry Ro Ro ships of 150 GT ( KMP . BINAUL ) and determine the solution of these factors . This study uses interviews . Sources of the interview is the party holding office as a field manager ( project leader ) and project workers ( subcontractors The results of the analysis are known to occur during the 65-day delay. There are many factors that cause a delay so that the progress of the development is not timely. Factors causing delay include, labor, environment (weather), materials, facilities, and equipment. Key Words: Hull Construction, WBS, Delay, Delay Factor

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D3 Teknik Bangunan Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 15 Sep 2018 04:13
Last Modified: 15 Sep 2018 04:13
URI: http://repository.ppns.ac.id/id/eprint/774

Actions (login required)

View Item View Item