Wulandari, Febri (2016) PERENCANAAN AUTOMATIC TRANSER SWITCH (ATS) PADA DUA TRANSFORMATOR UNTUK BEBAN LP-01 DAN LP-02 DI INDUSTRI TENUN PLASTIK. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK Gangguan pada sistem kelistrikan dapat mengakibatkan ketersediaan atau pemanfaatan energi listrik tidak kontinyu. Sebagai konsekuensi, sistem cadangan suplai listrik perlu dipikirkan sebagai jaminan kontinyuitasnya. Sumber listrik pada industri tenun plastik memanfaatkan dua sistem suplai yang berbeda jalur penyulangnya, Sidokepung (PLN A) dan Tulangan (PLN B) tanpa memasang generator set (genset) sebagai sumber cadangan. Sehingga perencanaan Automatic Transfer Swich (ATS) bisa menjadi jalan alternatif untuk pemindahan kedua suplai tersebut. Metode perencanaan yang digunakan yaitu dengan mempertimbangkan tata letak pemasangan Automatic Transfer Switch (ATS) terhadap beban LP (Lighting Panel). Kemampuan back-up daya beban tersambung juga menjadi pertimbangan dalam perencanaan ATS. Hasil dari pertimbangan tersebut kemudian dilakukan pembuktian dengan simulasi menggunakan software CX-Programmer. Hasil dari studi perencanaan dilakukan simulasi perbandingan sebelum dan setelah direncanakan sistem ATS menggunakan software CX-Programmer dan terbukti tingkat keberhasilan back-up terhadap beban LP-01 dan LP-02 sebesar 100%. LP-01 mengalami kenaikan daya beban 0.079% sedangkan LP-02 mengalami kenaikan daya beban 4.36% setelah direncanakan ATS. Kata kunci : Automatic Transfer Switch (ATS), back-up, CX-Programmer, daya, lighting panel ABSTRACT Disturbances on electrical system can result the availability or use of electrical energy is not continue. As a consequence , the back-up power supply systems should be considered as a guarantee of continuity. The power source in weaving of plastic industry utilizing two suplay systems that have different feeders line, Sidokepung (PLN A) and Tulangan (PLN B) without installing generator set (genset) as a back-up source . So planning Automatic Transfer Swich (ATS) could be an alternative way for the transfer of both the supply. Planning method that used are to consider the layout of the installation of Automatic Transfer Switch (ATS) to LP load (Lighting Panel). The ability of back-up load’s power that will be connected also become a consideration in a planning of ATS. The results of consideration is carried out by simulation using CX-Programmer software. The results of the planning study used simulation of comparison before and after planned the ATS system uses CX - Programmer software and proven that the rate of back- up success for LP-01 and LP - 02 is 100% backed up. LP-01 was increase 0.079% of load’s power, in other side LP-02 was increase 4.36% of load’s power after planned ATS. Keyword : Automatic Transfer Switch (ATS), back-up, CX-Programmer, lighting panel, power
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Jurusan Teknik Permesinan Kapal > D3 Teknik Permesinan Kapal |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 15 Sep 2018 03:17 |
Last Modified: | 15 Sep 2018 03:17 |
URI: | http://repository.ppns.ac.id/id/eprint/762 |
Actions (login required)
View Item |