Analisa Efisiensi Isentropik Turbin Uap dan Efisiensi Termal di PLTU 1 Jawa Timur, Pacitan

Efendi, Muhammat Yusron (2016) Analisa Efisiensi Isentropik Turbin Uap dan Efisiensi Termal di PLTU 1 Jawa Timur, Pacitan. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Pembangkit listrik tenaga uap ( PLTU ) 1 Jawa Timur , Pacitan merupakan salah satu unit yang ditunjuk oleh pemerintah untuk mengelola pembangunan dan pengusahaan sebagai proyek untuk percepatan 10.000 MW. PLTU 1 Jawa Timur, Pacitan memiliki dua buah unit pembangkit yang mana setiap unit ini memiliki kapasitas daya sebesar 315 MW. Pada proses produksi listrik terdapat beberapa equipment ( peralatan ). Salah satu peralatan sangat penting dari pembangkit listrik adalah turbin, mengingat pentingnya peranan dari turbin bagi proses produksi listrik maka perlu dilakukannya analisa terhadap efisiensi isentropik dari turbin dan perlu juga adanya analisa terhadap efisiensi termal dari sistem pembangkit tersebut. Pada tugas akhir ini membahas tentang analisa efisiensi isentropik turbin uap dan efisiensi termal di PLTU 1 Jawa Timur, Pacitan. Dari perhitungan yang dilakukan, didapatkan nilai efisiensi isentropik dari pada HPT sebesar 72 % , untuk IPT sebesar 78,6 % dan untuk LPT sebesar 85 % pada tahun 2014. Kemudian nilai efisiensi isentropik dari HPT sebesar 79 % , untuk IPT sebesar 80,7 % dan untuk LPT sebesar 84 % pada tahun 2015. Kemudian nilai efisiensi isentropik dari HPT sebesar 80,2 % , untuk IPT sebesar 82 % dan untuk LPT sebesar 86 % pada tahun 2016. Untuk meningkatkan efisiensi isentropik turbin dilakukan overhaul. Sementara untuk efisiensi termal pada tahun 2016 sebesar 43,2 %. Kata kunci : Pembangkit Listrik Tenaga Uap ( PLTU ), Turbin, Efisiensi termal, Efisiensi Isentropik Turbin, High Pressure Turbine, Intermediate Pressure Turbine, Low Pressure Turbine ABSTRACT Steam power plant (PLTU) 1 East Java, Pacitan was one unit appointed by the government to manage the construction and operation of a project for the acceleration of 10,000 MW. The power plant 1 East Java, Pacitan has two generating units that where every unit has the power capacity of 315 MW. In the electricity production process there are some equipment (equipment). One very important equipment of the power plant is the turbine, given the important role of the turbines for electricity production process it is necessary to do an analysis of the isentropic efficiency of the turbine and the need to also the analysis of the thermal efficiency of the plant system. In this final project discusses about analysis of isentropic efficiency the steam turbine and the thermal efficiency in The power plant 1 East Java, Pacitan. From the calculation, the value be obtained from the HPT isentropic efficiency by 72%, to IPT at 78,6% and for LPT by 85% in 2014. While the value of HPT isentropic efficiency of 79%, to IPT at 80,7% and for LPT by 84% in 2015. Meanwhile the value from HPT isentropic efficiency of 80,2%, for IPT at 82% and for LPT by 86% by 2016. In order to increase the efficiency the turbine isentropic conducted overhaul. While for the thermal efficiency of 43,2% in 2016. Key Word : Steam Power (power plant), Turbine, Thermal Efficiency, Efficiency Isentropic Turbine, High Pressure Turbine, Intermediate Pressure Turbine Low Pressure Turbine

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Permesinan Kapal > D3 Teknik Permesinan Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 15 Sep 2018 01:46
Last Modified: 15 Sep 2018 01:46
URI: http://repository.ppns.ac.id/id/eprint/739

Actions (login required)

View Item View Item