ARFIA, RULLY FANNY (2016) ANALISA PERFORMA DOUBLE SCREW PUMP32-P1A DI BITUMEN PLANT GRESIK PT. PERTAMINA (PERSERO). Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
Bitumen Plant Gresik PT. Pertamina (Persero) merupakan salah satu industri fabrikasi drum dan suplay point aspal dalam bentuk aspal curah dan aspal in drum. Aspal yang akan di suplaydisimpan pada tanki timbun aspal. Proses penyaluran aspal dari tanki timbun menuju tempat pengisian aspal curah membutuhkan alat / mesin pemindah fluida. Alat / mesin pemindah fluida yang dimaksudkan adalah pompa. Tidak semua jenis pompa bisa memindahkan fluida seperti aspal, maka dari itu dipilihlah double screw pump.Proses filling aspal dalam bentuk aspal curah saat ini sedang mengalami keterlambatan waktu pengisian, ini disebabkan karena penurunan performadari pompa filling curah yaitu pompa 32-P1A. Masalah ini menyebabkan terjadinya penumpukan antrian truk. Metode penelitian yang digunakan pada pembahasan ini merupakan langkah-langkah penelitian secara berurutan yang dimulai dari pengambilan data dilapangan, perhitungan data seperti headdan daya pompa, dan analisa hasil perhitungan dari daya pompa. Dari hasil analisa tersebut, dapat diambil kesimpulan untuk performa pompa 32-P1A. Dari hasil perhitungan didapatkan besar head pompa 43,43 m dan daya pompa 12,97 kW. Hasil perhitungan daya pompa lebih kecil daripada daya pompa di spek yaitu sebesar 59 kW. Dilihat dari perbandingan antara perhitungan daya pompa dan daya pompa spek, maka dapat disimpulkan bahwa pompa 32-P1A mengalami penurunan performa. Kata kunci : Bitumen Plant Gresik, double screw pump,performa, headpompa, daya pompa ABSTRACT Bitumen Plant Gresik PT. Pertamina (Persero) is oneof the industrial drum fabrication and supply point asphalt of bulk asphalt and in drums. The asphalt will be stored in tanks before supply. Distribution process bitumen from the tank to the point of filling bulk asphalt require equipment / fluid transfer machinery. Equipment / fluid transfer machinery intended is a pump. Not all types of pumps to move fluids such as asphalt, therefore the chosen double screw pump.The process of filling bulk asphalt is currently experiencing delays in charging time, is due to a decrease in the performance of a bulk filling pump which pumps 32-P1A. This problem led to queuing trucks. The method used in this discussion is the research steps in sequence starting from field data collection , data calculation such of head and pump power, and analysis of the calculation results . From this analysis , it is concluded for the performance of the pump 32 - P1A . From the calculation results obtained large pump head 43,43 m and power pump 12.97 kW . The calculation result is smaller than the pump power of pump power in the spec that is equal to 59 kW . Judging from the comparison between the calculation of the pump power and pump power spec , it can be concluded that the 32 - P1A pump performance decrease. Keywords: Bitumen Plant Gresik, double screw pump, performance, pump head, pump power
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Jurusan Teknik Permesinan Kapal > D3 Teknik Permesinan Kapal |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 14 Sep 2018 06:24 |
Last Modified: | 14 Sep 2018 06:24 |
URI: | http://repository.ppns.ac.id/id/eprint/731 |
Actions (login required)
View Item |