IMPLEMENTASI METODE RELIABILITY CENTERED MAINTENANCE (RCM II) DAN ANALISA RESIKO DENGAN HIRARC PADA ELECTRIC ARC FURNACE DI PT. H

Ginting, Hery Suranta (2016) IMPLEMENTASI METODE RELIABILITY CENTERED MAINTENANCE (RCM II) DAN ANALISA RESIKO DENGAN HIRARC PADA ELECTRIC ARC FURNACE DI PT. H. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK PT. H merupakan perusahaan yang bergerak pada bidang peleburan baja dan pembuatan wire rod terbesar di Indonesia. Dalam melakukan kegiatan peleburan muat didukung oleh Electric Arc Furnace. Terjadinya gangguan pada Electric Arc Furnace akan berpotensi menghambat proses produksi serta dapat menimbulkan ancaman bagi keselamatan di lingkungan kerja. Tujuan penelitian ini adalah dapat melakukan kegiatan pemeliharaan secara terencana sehingga meningkatkan efektifitas kerja alat serta mengurangi angka kecelakaan yang disebabkan oleh kerusakan alat. Metode yang akan digunakan dalam penelitian ini adalah metode Realibility Centered Maintenance (RCM) II dan analisa resiko menggunakan HIRARC. Kegagalan fungsi komponen ditinjau dari Failure Mode and Effect Analysis (FMEA). Penilaian risiko didapatkan dari perhitungan Risk Priority Number (RPN) dengan mengalikan nilai severity dan occurance. Untuk mengantisipasi kegagalan tersebut maka kegiatan perawatan diberikan dengan memperhatikan RCM II decision diagram. Perhitungan kuantitatif diberikan untuk menentukan interval perawatan yang terjadwal sedangkan HIRARC digunakan untuk mengetahui sumber bahaya yang timbul pada pekerja pada saat melakukan perawatan. Dari hasil penelitian diketahui bahwa pada 14 equipment terdapat 22 bentuk failure mode yang dapat mengakibatkan kegagalan pada Electric Arc Furnace. Dalam RCM II diketahui bahwa terdapat 6 failure mode yang dapat dicegah dengan menggunakan scheduled discard task. Terdapat 7 failure mode yang dapat dicegah dengan menggunakan scheduled restoration task , dan terdapat 8 failure mode yang dapat dicegah dengan menggunakan scheduled on conditional task. Analisa HIRARC menunjukkan terdapat 10 jenis bahaya yang dapat terjadi pada saat melakukan perawatan Electric Arc Furnace Kata Kunci : Resiko, Interval Perawatan, RCM II, HIRARC ABSTRACT PT. H is a company engaged in the field of steel mills and wire rod manufacture the largest in Indonesia. In conducting the smelting load supported by the Electric Arc Furnace. Interference with the Electric Arc Furnace will potentially inhibit the production process and can pose a threat to safety in the workplace. The purpose of this study is that it can perform maintenance activities planned manner thus increasing the effectiveness of the tools and reduce the number of accidents caused by equipment failure The method used in this research is the Realibility Centered Maintenance (RCM) II method and risk analysis using HIRARC. Failure of components in terms of a Failure Mode and Effect Analysis (FMEA). The risk assessment is obtained from the calculation of Risk Priority Number (RPN) by multiplying the value of severity and occurance. The failure to anticipate the activities of the care given with regard RCM II decision diagram. Quantitative calculations are given to determine the scheduled maintenance intervals while HIRARC used to determine the source of possible danger to the worker at the time of treatment. The result showed that at14 equipment there are 22 forms of equipment failure modes that can lead to failure in the Electric Arc Furnace. RCM II in mind that there are six failure modes that can be prevented by using scheduled discard task. There are seven failure modes that can be prevented by using a scheduled restoration task, and there are 8 failure modes that can be prevented by using conditional on a scheduled task. HIRARC analysis shows that there are 10 types of hazards that can occur during the treatment of Electric Arc Furnace Keywords: Risk, Maintenance Intervals, RCM II, HIRARC

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 13 Sep 2018 03:44
Last Modified: 13 Sep 2018 03:44
URI: http://repository.ppns.ac.id/id/eprint/602

Actions (login required)

View Item View Item