Perencanaan Interval Perawatan Mesin CNC Flame Cutting dengan Metode RCM (Reliability Centered Maintenance) di PT. Boma Bisma Indra (Persero) Pasuruan

Wulandari, Dwi Cahya (2016) Perencanaan Interval Perawatan Mesin CNC Flame Cutting dengan Metode RCM (Reliability Centered Maintenance) di PT. Boma Bisma Indra (Persero) Pasuruan. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK PT. Boma Bisma Indra pasuruan adalah salah satu perusahaan BUMN yang bergerak dalam bidang jasa fabrikasi di Indonesia. Beberapa hasil dari produksinya adalah Pressure Vessel, Heat Exchanger, Erected Tank, Machining & Part, Mollen Roll, Brake drum, casting dan lain sebagainya. Dalam setiap pengerjaan selalu melewati tahap persiapan, pada tahap ini selain pengukuran material juga memerlukan beberapa mesin perkakas, salah satu contoh mesinnya adalah CNC flame cutting. Namun dinas maintenance mencatat pada tahun 2014-2015 beberapa kerusakan yang sering mengakibatkan mesin ini berhenti. Untuk menunjang keandalan mesin agar bisa bekerja maksimal untuk order selanjutnya maka mesin harus diberi perawatan yang sesuai dengan cara menggunakan metode RCM (Reliability Centered Maintenance). Metode RCM memiliki banyak keuntungan antaranya dapat menjadi program perawatan yang paling efisien dan memiliki biaya perawatan yang rendah, serta meminimasi peluang kegagalan secara mendadak dan meningkatkan umur serta keandalan peralatan tersebut. Penelitian ini bertujuan untuk mengidentifikasi kegagalan, menentukan perawatan yang sesuai serta menentukan interval perawatan yang optimal. Data yang digunakan yaitu data kegagalan 2014 dan 2015, selama periode ini terdeteksi 11 bentuk kegagalan. Kemudian setelah diidentifikasi dengan RCM II decision worksheet dapat disimpulkan kebijakan perawatan yang sesuai dengan kegagalan komponen masing-masing. Ada 3 macam kebijakan yang diberikan yaitu schedule discard task, schedule on condition task dan schedule restoration task. Hasil selanjutnya dari penelitian ini adalah perhitungan interval perawatan yang optimal. Untuk komponen AC motor servo axis X interval perawatan (TM) sebesar 775.6 jam, servo motor axis Y 447.4 jam, CNC unit sebesar 797.5 jam, kabel sebesar 605.3 jam, selang sebesar 590.7 jam dan THC sebesar 206.5 jam. Kata Kunci : CNC Flame Cutting, Perawatan, RCM (Reliability Centered Maintenance) ABSTRACT PT. Boma Bisma Indra Pasuruan is one of the state-owned company engaged in the fabrication services in Indonesia. Some of the results of its production is Pressure Vessel, Heat Exchangers, Tanks erected, Machining & Parts, Mollen Roll, Brake drum, casting and so forth. In each of workmanship always pass the preparatory stage, at this stage other than the measurement of the material also requires some machine tools, one example of the machine is CNC flame cutting. But the maintenance department noted in 2014-2015 some of the damage that often causes the machine to stop. To support the reliability of the machine in order to work optimally for the next order, the machine must be given appropriate care by means of using RCM (Reliability Centered Maintenance). RCM method has many advantages among which may be the most efficient treatment program and have lower maintenance costs, and minimizing the chances of sudden failure and increase the lifespan and reliability of the equipment. This study aims to identify the failure, determine the appropriate treatment and determine the optimal treatment interval. The data used is data failures in 2014 and 2015, during this period detected 11 forms of failure. Then once identified with RCM II decision worksheet can be concluded that care policies in accordance with their respective component failures. There are 3 kinds of policies that give the discard schedule task, schedule tasks and schedule on condition restoration task. Further results from this study is the calculation of the optimal treatment interval. For components X axis AC servo motor maintenance interval (TM) amounted to 775.6 hours, Y axis servo motors 447.4 hours, CNC units for 797.5 hours, Cable amounted to 605.3 hours, an interval of 590.7 hours and THC amounted to 206.5 hours. Key Word : CNC Flame Cutting, Maintenance, RCM (Reliability Centered Maintenance)

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tddm ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 12 Sep 2018 06:34
Last Modified: 12 Sep 2018 06:34
URI: http://repository.ppns.ac.id/id/eprint/565

Actions (login required)

View Item View Item