ANALISA SISTEM DISTRIBUSI LISTRIK PADA FINISHING PLANT BERDASARKAN DATA RENCANA BEBAN TERPASANG DALAM RANGKA PENAMBAHAN PLANT BARU DI PT. "X"

Nugraha, Agung Surya (2015) ANALISA SISTEM DISTRIBUSI LISTRIK PADA FINISHING PLANT BERDASARKAN DATA RENCANA BEBAN TERPASANG DALAM RANGKA PENAMBAHAN PLANT BARU DI PT. "X". Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Penyaluran daya listrik dari sumber ke beban pasti diperlukan untuk memenuhi kebutuhan operasi beban khususnya dalam dunia industri, beban yang diberikan berbeda-beda jenis dan spesifikasinya. Oleh karena spesifikasi pembebanan yang berbeda-beda, maka diperlukan penyaluran daya yang baik dan handal. Baik dan handalnya suatu sistem distribusi listrik, ditentukan oleh peralatan sistem distribusi yang handal sesuai kebutuhan beban. Dalam Tugas Akhir ini menganalisa sebuah sistem distribusi listrik berdasarkan data pembebanan yang akan dipasang oleh PT. X. Peralatan sistem distribusi yang akan digunakan seperti kabel dan pengaman, disesuaikan dengan kebutuhan pembebanan tiap plant pada bagian LVD finishing plant (low voltage distribution room finishing plant) dan tiap plant pada Sub LVD finishing plant. Dari penelitian yang telah dilakukan, hasil akhir dari tugas akhir ini adalah didapatkannya nilai kapasitas pengaman, kabel penghantar, dan tegangan jatuh yang dihasilkan dari perhitungan sesuai PUIL 2000. Kata Kunci :Sistem Distribusi, Finishing Plant, LVD, Kabel, Pengaman, PUIL 2000 ABSTRACT Distribution of electrical power from source to load certainly need to meet load operation. Especially in the industrial company, loads are different types and specifications. So because the loads have different specification, it necesary good and reliable power distribution. Good and reliable electrical distribution system, is determined by the reliable distribution system equipment as required loads. In this final project will be analyze in an electrical distribution system based on the load list that will be installed by PT. "X". Distribution system equipment that will be used as wiring and protection, adjust to the needs of each plant of loading on the finishing plant LVD (low voltage distribution room finishing plant) and each plant in Sub LVD finishing plant. From the research that has been done, the result of this final project determine the protection equipment, conductor cables, and the voltage drops resulting from calculations are according PUIL 2000. Keyword : Distribution System, Finishing Plant, LVD, Cable, Protection, PUIL 2000

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Kelistrikan Kapal > D3 Teknik Kelistrikan Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 30 Aug 2018 02:40
Last Modified: 30 Aug 2018 02:40
URI: http://repository.ppns.ac.id/id/eprint/256

Actions (login required)

View Item View Item