ANALISA KEKUATAN SLING CRANE PADA PROSES PENGANGKATAN WATER DEAERATOR DI PROJECT BANYU URIP EPC-1 BOJONEGORO

Ahmad Edy, Purwanto (2014) ANALISA KEKUATAN SLING CRANE PADA PROSES PENGANGKATAN WATER DEAERATOR DI PROJECT BANYU URIP EPC-1 BOJONEGORO. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Pada proses pengerjaan proyek migas terdapat beberapa hal yang sangat diperhatikan dan sangat diperhitungakan, hal tersebut adalah keselamatan (Safety), perhitungan yang detail dan rinci, efisiensi dan kualitas pekerjaan. Dari berbagai proses pengerjaan proyek migas, proses rencana pengangkatan (rigging plan) adalah salah satu proses yang sangat di perhatikan dan diperhitungkan. Proses pengangkatan suatu barang (dalam hal ini adalah vessel water deaerator) merupakan bagian penting pada proyek migas Epc-1 Banyu Urip Bojonegoro, karena merupakan pengangkatan vessel dengan dimensi yang besar. Vessel water deaerator tersebut berfungsi untuk menghilangkan oksigen atau gas-gas terlarut lainnya pada feed water sebelum masuk ke dalam boiler, dapat juga berfungsi sebagai tempat penyimpanan air yang menyuplai air ke dalam boiler di Central Processing Facility Epc-1. Pesawat pengangkat (Crane) berfungsi untuk memindahkan beban dilapangan atau ruangan, pesawat pengangkat hanya mengangkat beban dalam jumlah dan besar yang terbatas dan dalam jarak yang terbatas pula, sedangkan tali kawat baja (steel wire rope) adalah tali kawat yang dikonstruksikan dari kumpulan jalinan kawat baja (steel wire), yang terbuat dari baja dengan tegangan bengkok (ultimate strength) σ b = 130-200 kg/mm 2 . Oleh karena itu dibutuhkan rencana pengangkatan, untuk menghindari adanya hal-hal yang tidak diinginkan seperti, putusnya tali kawat baja dan factor-faktor yang lain, juga untuk mempermudah proses proses pengangkatan. Kata Kunci : Rigging Plan, Crane, Steel Wire Rope ABSTRACT In the process of oil projects there are some things that is taken into account, it is safety, and a detailed calculation detail, efficiency and quality of work. Ovarious process of oil and gas projects, the removal plan is one of the very process in the notice and in the account. Process of appointment of an item (in this case water deaerator vessel) is an important part in the project of oil and gas EPC-1 Banyu Urip Bojonegoro, because it is the appointment of a large vessel with dimensions. The deaerator water vessel used to remove oxygen or other gases dissolved in the feed water before it goes into the boiler, can also serve as a water storage area that supplies water to the boiler in central processing facility EPC-1. Plan lifting (crane) function to move the load on the ground or space, air lifter just lifting weights and large quantities are limited distance anyway, while the steel rope braid collection made of steel with crooked voltage 130-200 kg/mm 2 . Therefore required removal plan, to avoid things that are not in want, such as steel wire rope breaking and other factors, as well as to simplify the process of appointment. Keywords : Rigging Plan, Crane, Steel Wire Rope

Item Type: Thesis (Diploma)
Divisions: Jurusan Teknik Permesinan Kapal > D3 Teknik Permesinan Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 21 Aug 2018 05:36
Last Modified: 21 Aug 2018 05:36
URI: http://repository.ppns.ac.id/id/eprint/25

Actions (login required)

View Item View Item