PERANCANGAN TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH BAHAN BERBAHAYA DAN BERACUN (B3) DI PT. X

HERMAN, WIJANARTO (2015) PERANCANGAN TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH BAHAN BERBAHAYA DAN BERACUN (B3) DI PT. X. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK PT. X adalah salah satu perusahaan pestisida dan produk hayati terkemuka di Indonesia yang berkedudukan di Gresik, Jawa Timur. PT.X memiliki banyak produksi sehingga menghasilkan beberapa karakteristik limbah B3 yang seharusnya disimpan pada Tempat Penyimpanan Sementara (TPS) limbah B3. Berdasarkan hasil pengamatan yang telah dilakukan, pada saat ini PT.X masih belum memiliki TPS limbah B3 yang sesuai dengan standar yang ada dan belum memiliki sistem ventilasi, pencahayaan, pemberian simbol dan label serta sistem pengelolaan yang sesuai dengan standar yang berlaku. Tujuan dari penelitian ini adalah untuk melakukan perancangan bangunan TPS limbah B3 di PT. X serta, melakukan tata cara pengemasan, penataan, dan tata cara pelabelan serta simbol B3 bangunan TPS limbah B3 di PT.X. Perencanaan pengelolaan limbah B3 PT.X ini diawali dengan pengambilan data yaitu data jenis limbah, jumlah limbah, perencanaan dimensi palet, drum, karung, bak kontainer dan forklift. Perancangan TPS limbah B3 yang dilengkapi dengan sistem pencahayaan yang sesuai dengan SNI 16-7062-2004 tentang Pengukuran Intensitas Penerangan di Tempat Kerja, ventilasi, instalasi petir, tata letak limbah B3, pemberian simbol dan label, serta perhitungan struktur bangunan TPS limbah B3 menggunakan SAP2000. Berdasarkan penelitian yang dilakukan, didapatkan bahwa dimensi gudang limbah B3 yang direncanakan adalah 15 m x 13 m x 8 m dengan tata letak limbah sesuai dengan kebutuhan. Total luas bukaan (ventilasi alami) yang dibutuhkan adalah 15 m2. Kebutuhan lampu pada TPS ini adalah sebanyak 12 lampu menggunakan lampu pijar 250 Watt untuk TPSnya, 2 lampu 2xTL 40 Watt untuk ruang administrasi. Penangkal petir yang dibutuhkan sebanyak 3 buah, 2 buah untuk penghantar turunan yang memiliki sistem pembumian 5Ω. Untuk perancangan struktur digunakan kuda-kuda balok (WF 250x175x7x11), Gording C (WF 125x125x9x10) dengan beban mati 81,58 kg, beban hidup sebesar 203,95 kg, beban angin tekan pada atap sebesar 575 kg/m, beban angin hisap pada atap sebesar 50 kg/m, beban angin tekan pada dinding sebesar 112,5 kg/m dan beban angin hisap pada dinding sebesar 50 kg/m. Kata kunci : pengelolaan limbah B3, ventilasi, pencahayaan, instalasi penyalur petir, perancangan struktur ABSTRACT PT. X is one of the leading pesticide and biological products in Indonesia which is located in Gresik, East Java. PT.X has a lot of production so that produce some of the characteristics of the hazardous waste should be stored in the Temporary Storage Places hazardous waste. Based on the observations that have been made, at this moment still PT. X do not have the Temporary Storage Places hazardous waste in accordance with existing standards and yet have a ventilation system, lighting, provision of symbols and labels and management systems in accordance with applicable standards. The purpose of this study was to do the designing building in PT. X B3 waste, as well as procedures for packaging, structuring, and the system of labeling as well as a symbol of waste B3 TPS building in PT. X. PT.X B3 waste management planning begins with the collection of data is the data type of waste, the amount of waste, planning dimensions of pallets, drums, sacks, tubs containers and forklifts. Temporary Storage Places hazardous waste is equipped with a lighting system in accordance with SNI 16-7062-2004 on measuring the intensity of light in the workplace , ventilation, installation of lightning, layout , giving symbols and labels, as well as the calculation of building structures Temporary Storage Places hazardous waste using SAP2000. Based on the research conducted, it was found that the dimensions of the planned warehouse B3 waste is 15 mx 13 mx 8 m with the layout of the waste in accordance with needs. The total area of the openings (natural ventilation) required is 15 m2. TPS needs lights on it is as much as 12 lamps using incandescent lamps of 250 Watt for TPSnya, 2 2xTL 40 Watt lamp for administrative space. Lightning rod is needed as much as 3 pieces, 2 pieces for conductor derivative which has the grounding system 5Ω. To design a structure used horses beam (WF 250x175x7x11), Gording C (WF 125x125x9x10) with 81.58 kg dead load, live load of 203.95 kg, wind load tap on the roof of 575 kg / m, wind load suction on the roof is 50 kg / m, wind load tap on the wall of 112.5 kg / m and wind load suction on the wall at 50 kg / m. Keywords: hazardous waste management, ventilation, lighting, lightning dealer installation, structural design.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 29 Aug 2018 02:18
Last Modified: 29 Aug 2018 02:18
URI: http://repository.ppns.ac.id/id/eprint/201

Actions (login required)

View Item View Item