ANALISIS JAM KERJA PADA BLOK 115 DAN BLOK 116 KAPAL FERRY 500 GT SERTA PERHITUNGAN PROSENTASE PENGGUNAAN PERALATAN TERHADAP PENJADWALAN PRODUKSI

Lintang Candra, Pramana (2015) ANALISIS JAM KERJA PADA BLOK 115 DAN BLOK 116 KAPAL FERRY 500 GT SERTA PERHITUNGAN PROSENTASE PENGGUNAAN PERALATAN TERHADAP PENJADWALAN PRODUKSI. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

Peralatan merupakan komponen penting yang dibutuhkan untuk menyelesaikan suatu pekerjaan sampai pekerjaan tersebut selesai. Peralatan merupakan alat yang penting di gunakan untuk pembangunan blok pada tahap fabrikasi, assembly, sub assesmbly dan erection dalam pembangunan blok kapal. Agar peralatan tidak mengalami overload makan sangat penting galangan harus memperhatikan penggunaannya. Dari data-data yang diperoleh dari PT.Dumas Tanjung Perak Shipyard penggunaan peralatan pada tahap pengerjaan blok di fokuskan pada tahap pekerjaan fabrikasi, assembly, sub assembly dan erection untuk melakukan analisis kerja dan perhitungan jam peralatan setiap pekerjaan serta perhitungan besar prosentase masing-masing peralatan dan total jam peralatan selama pembangunan blok. Berdasarkan hasil analisa perhitungan jam peralatan dan perhitungan prosentase dalam pembangunan blok 115 dan blok 116 karena terdapat perbedaan yang sangat signifikan antara perencanaan dan kebutuhan real dilapangan. Adapun pada tahap fabrikasi kebutuhan jam peralatan 280 jam prosentase terhadap jo pekerjaan 173,9% pada tahap assembly kebutuhan jam peralatan 6800 jam prosentase terhadap Jo pekerjaan 260.1%. pada tahap sub assembly kebutuhan jam 9373 jam prosentase terhadap jo pekerjaan 358.6%. berdasarkan jumlah total jam peralatan keseluruhan pada blok 115 sebesar 16455 jam prosentase terhadap job blok sebesar 581.2% . pada blok 116 jumlah total jam peralatan keseluruhan sebesar 11004.9 jam prosentase terhadap job blok sebesar 322.5%. Keyword : Blok, Peralatan, Prosesntase Utilities is an important component which is needed to finishing working, until end. Equipment is needed to build a block in ship from fabrication, assembly, sub assembly, and erection. In order to prevent overload using tools, so its neccessary to pay attention to the use of it. From database which isi obtained on PT. Dumas Tanjung Perak Shipyards, using of equipment in production of block, focused on fabrication, assembly, sub assembly, and erection to do working analysis and calculating working hours at every working. Then, calculating how much presentase in each equipment and ammount working hours during the process of build the block Based on result of calculating analysis working hours and calculating of presentase in build the 115 & 116 block, there are significant differences between planning and real necessity. As for, in fabrication step, neccesity of working hours is 280 hours, and percentage of man hours is 173,9%. In assembly step neccesity of working hours is 6800 hours, and percentage of man hours is 260,1%. In sub assembly step neccesity of working hours is 9373 hours, and percentage of man hours is 358,6%. Based on total of equipment hours at 115 block is 16455 hours, and procentage of necessity block working is 581,2%. In 116 bloc, total of equipment hours is 11004,9 hour, and procentage of block working is 322,5%. Keyword : Block, Equipment, Percentage

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: Jurusan Teknik Bangunan Kapal > D4 Teknik Perancangan dan Kontruksi Kapal
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 27 Aug 2018 04:39
Last Modified: 27 Aug 2018 04:39
URI: http://repository.ppns.ac.id/id/eprint/126

Actions (login required)

View Item View Item