PERMANA, AGA AUDI (2017) PENILAIAN RISIKO DAN PENJADWALAN INSPEKSI PADA PRESSURE VESSEL GAS SEPARATION UNIT DENGAN METODE RISK BASED INSPECTION PADA CPPG. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.
Full text not available from this repository.Abstract
ABSTRAK Central Processing Plant (CPP) Blok G merupakan unit pengolahan gas alam yang prosesnya diawali dengan pemisahan fase pada Gas Separation Unit (GSU). Kebakaran dan ledakan pada unit ini dapat menimbulkan kerugian bagi perusahaan. Penelitian ini mengidentifikasi bahaya dari kegagalan peralatan dan mengetahui kemungkinan serta konsekuensi kegagalan untuk meminimalisir risiko kerugian. Fault Tree Analysis (FTA) digunakan untuk mengetahui akar permasalahan yang bisa mengakibatkan suatu kegagalan terjadi. Aktivitas inspeksi yang tepat dapat meminimalisir risiko terjadinya kebakaran akibat terlepasnya fluida metana yang terkandung didalamnya. Nilai kemungkinan dan konsekuensi kegagalan dihitung dengan metode Risk Based Inspection (RBI) berdasarkan American Petroleum Institute (API) 581. Hasil analisa pada 8 pressure vessel didapatkan nilai risiko adalah pada rentang 1,36E-04ft/th pada D-0104 sampai dengan 1,61E-02ft/th pada V-0101. Remaining life masing-masing pressure vessel dalam keadaan dapat diterima dengan umur pakai lebih dari 15 tahun. Berdasarkan nilai risiko tersebut maka waktu inspeksi yang tepat adalah 5 tahun berikutnya untuk 7 pressure vessel pada tingkat risiko medium dan 10 tahun berikutnya untuk 1 pressure vessel (D-0104) pada tingkat risiko rendah. Kata Kunci : FTA (fault tree analysis), kebakaran, ledakan, RBI, remaining life, tingkat risiko ABSTRACT Central Processing Plant (CPP) Block G is a natural gas processing unit whose process begins from separation phase in the Gas Separation Unit (GSU). Fire and explosion on this unit may cause loss to the company. This research identifies hazards from equipment failures and knows the possibilities and failure consequences to minimize risk of loss.Fault Tree Analysis (FTA) is used to determine the root causes of failure. Appropriate inspection activities can minimize fire risk which caused by methane fluid release in its unit. The probability and failure consequence is calculated with Risk Based Inspection (RBI) method based on American Petroleum Institute (API) 581.The analysis result on 8 pressure vessel obtained the risk value is in the range of 1.36E-04ft / th at D-0104 up to 1.61E-02ft / th at V-0101. Remaining life of each pressure vessel is acceptable more than 15 years for its service life. Based on its risk value, the appropriate inspection time is the next 5 years for 7 pressure vessels at the medium risk level and the next 10 years for 1 pressure vessel (D-0104) at low risk level.. Key Words: FTA (fault tree analysis), fire, explosion, RBI, remaining life, risk level
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | ?? tkdkk ?? |
Depositing User: | Unnamed user with email repository@ppns.ac.id |
Date Deposited: | 21 Sep 2018 06:43 |
Last Modified: | 21 Sep 2018 06:43 |
URI: | http://repository.ppns.ac.id/id/eprint/1145 |
Actions (login required)
View Item |