PERANCANGAN TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH BAHAN BERBAHAYA DAN BERACUN (B3) PADA GALANGAN KAPAL X

Dewantara, Faldi Achmad (2017) PERANCANGAN TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH BAHAN BERBAHAYA DAN BERACUN (B3) PADA GALANGAN KAPAL X. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

ABSTRAK Galangan kapal X adalah salah satu perusahaan di bidang maritim yang salah satunya bergerak di bidang reparasi kapal. Dari kegiatan produksinya sebagian menghasilkan limbah dengan karakteristik B3 yang seharusnya disimpan pada Tempat Penyimpanan Sementara (TPS) limbah B3. Berdasarkan hasil pengamatan yang telah dilakukan Galangan kapal X belum memiliki sarana TPS limbah B3 yang sesuai dengan standart yang ada. Oleh karena itu, perlu dilakukan perancangan TPS limbah B3 dengan kelengkapan pelabelan dan simbol, penerangan, ventilasi, penangkal petir, dan Alat Pemadam Api Ringan (APAR). Perencanaan pengelolaan limbah B3 Galangan Kapal X ini diawali dengan pengambilan data jenis limbah, jumlah limbah, perencanaan dimensi palet, drum, bak container, dan forklift. Pengolahan data yang dilakukan berupa perancangan TPS limbah B3 yang dilengkapi dengan sistem ventilasi, pencahayaan, instalasi penyalur petir, tanggap darurat penanganan tumpahan Limbah B3, instalasi APAR, simbol dan labeling, serta perancangan struktur bangunan TPS limbah B3 menggunakan software SAP 2000. Berdasarkan penelitian yang telah dilakukan, didapatkan hasil bahwa TPS limbah B3 yang direncanakan adalah berukuran 20 m x 18 m x 8,27 m. Total luas ventilasi yang dibutuhkan adalah 25,10 m 2 . Kebutuhan sistem pencahayaan pada TPS ini sebanyak 20 armatur dengan jenis lampu gantung yaitu lampu pijar 400 W untuk penyimpanan limbah B3 beserta jalan dan 10 armatur dengan jenis lampu TL 40W untuk kantor. Kebutuhan APAR yang dibutuhkan adalah minimal 3 buah dengan jenis dry chemical powder. Tanggap darurat tumpahan limbah B3 berupa pembuatan prosedur dan dipilih beton kasar sebagai permukaan lantai .Untuk perancangan instalasi penyalur petir memiliki perkiraan bahaya kurang dari 11 sehingga aman tanpa sistem instalasi penyalur petir . Untuk perancangan struktur digunakan gording (kanal C 100 x 50 x 5x 7,5) dengan penutup atap galvalum, kuda – kuda (200 x 150 x 6 x 9), dan kolom (200 x 150 x 6 x 9), dan menggunakan pondasi telapak. Kata kunci : pengelolaan limbah B3, ventilasi, tanggap darurat tumpahan, pencahayaan, APAR, instalasi penyalur petir, dan perancangan struktur. ABSTRACT Shipyard X is one of maritime company which serve a distinction in ship reparation. From the procces production mostly produces hazardous waste which should be stored in Temporary Storage Area of Hazardous Waste. Based on the observation which has been done, currently Shipyard X do not have the Temporary Storage Area of Hazardous Waste accordance with existing standarts. Therefore, it should be designed a Temporary Storage Area of Hazardous Waste with symbol dan labelling, ventilation system, lighting, installation of lightning, and fire extinguisher. The designing process of Temporary Storage Area of Hazardous Waste was started with a data collection of the hazardous waste varieties, the amount, the dimension of pallete, drum, container, and forklift. The tabulation which is done by the writer is designing Temporary Storage Area of Hazardous Waste which is equipped symbol and labelling, ventilation system, lighting, installation of lightning, emergency handling spills hazardous waste, fire extinguisher, and design of building structures use SAP 2000 software. According to the reseach which has been done by the writer, it is stated that the Temporary Storage Area of Hazardous Waste is 20 m x 18 m x 8,27 m. The total of natural ventilation needed is 25,10 m 2 . Fire Extinguisherneeds are minimum 3 with dry chemical powder. The illumination system of this Temporary Storage Area of Hazardous Waste are 20 armatures with 400W of hanging lamp for hazardous waste storage, warehouse and road, and 10 armatures with TL 40W for office room.Emergency handling spills hazardous waste is making procedure and choosing concrete for floor covering. This building doesn’t need lighting rods because have risk assesment less than 11. For structure planning the writer will use gording (kanal C 100 x 50 x 5 x 7,5) with roof from galvalum, easel (200 x 150 x 6 x 9), and column (200 x 150 x 6 x 9), and use telapak foundation. Keywords : hazardous waste management, ventilation, emergency handling spills, lighting, fire extinguisher, lightning installation, structural design.

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 21 Sep 2018 06:17
Last Modified: 21 Sep 2018 06:17
URI: http://repository.ppns.ac.id/id/eprint/1136

Actions (login required)

View Item View Item