ANALISIS POTENSI BAHAYA DENGAN METODE CHECKLIST DAN WHAT-IF ANALYSIS PADA SAAT COMMISSIONING PLANT N83 DI PT. XYZ

Sudrajat, Adhi (2017) ANALISIS POTENSI BAHAYA DENGAN METODE CHECKLIST DAN WHAT-IF ANALYSIS PADA SAAT COMMISSIONING PLANT N83 DI PT. XYZ. Diploma thesis, POLITEKNIK PERKAPALAN NEGERI SURABAYA.

Full text not available from this repository.

Abstract

Abstrak PT.XYZ merupakan perusahaan gas yang akan memproduksi jenis gas baru yakni gas N83 untuk menggantikan salah satu gas yang ada. Kini perusahaan telah membangun sebuah plant baru. Sebelum operasional, plant akan dilakukan suatu pemeriksaan dan pengujian secara fungsional semua perangkat yang ada pada plant yang juga sering disebut commissioning. Kegiatan ini sangat berpotensi timbul kesalahan atau kegagalan. Setelah mengikuti kegiatan commissioning penelit i mendapatkan banyak hal yang dinilai dapat menimbulkan bahaya dan kerugian bagi perusahaan mengingat belum adanya prosedur commissioning. Metode yang digunakan dalam penelitian ini yaitu metode Checklist untuk mengetahui kesesuaian operasional yang telah dilakukan pada saat commissioning dengan standart. Metode What- If Analysis digunakan untuk menentukan rekomendasi dari checklist yang terjawab tidak, dengan output berupa SOP. Untuk mengetahui jarak aman (nilai paparan / Er terkecil =1,6 kW/m² berdasarkan CPSS, 2000) dampak dari kebocoran pipa pada saat commissioning dilakukan perhitungan analisa jet fire dan flash fire dengan skenario realistic case. Hasil dari penelitian ini yaitu konsekuensi akibat thermal radiation flux CH4 sebesar 1,6 Kw/m² untuk jet fire dengan jarak aman terdekat yakni 4,958 m dengan skenario diameter lubang kebocoran 5 mm pada skenario A. Untuk flash fire jarak aman terdekat yaitu skenario A Radius TRF 155,61 m. maka dari itu dapat direkomendasikan untuk pemberian barrier disekitar storage tank berupa tembok. Kata kunci : commissioning, checklist, what -if, hydrotest, jet fire, flash fire ABSTRACT PT.XYZ is a company of industrial gas and will produce a new type of gas (gas N83) to replace one of the existing gas. Now the company has built a new plant. Prior to the operation, the plant will perform an examination and functional testing for all devices in the plant that called commissioning test. This activity have high potential of errors or failures. After following the commissioning activity the authors get a lot of things that can cause a hazard and damage to company facilit y, due to unavailabilit y of commissioning procedures. The method that used in this study is Checklist method to determine the operational conformity that has been done at the time of commissioning based on standard. The What- If Analysis method is used to determine the recommenda tion from checklist with no answer, and the output is SOP. To determine the safe distance (smallest exposure value = 1.6 kW / m² based on CPSS, 2000) the impact from leakage of pipeline during commissioning was calculated by jet fire and flash fire analysis with realistic case scenario. The result from this research is the consequence of thermal radiation flux CH4 equal to 1,6 Kw / m² for jet fire with the nearest safe distance that is 4,958 m with scenario of leakage diameter of 5 mm in scenario A. For flash fire the nearest safe distance is scenario A Radius TRF 155.61 m. Then it can be recommended to build a barrier around the storage tank using wall. Kata kunci : commissioning, checklist, what -if, hydrotest, jet fire, flash fire

Item Type: Thesis (Diploma)
Subjects: T Technology > T Technology (General)
Divisions: ?? tkdkk ??
Depositing User: Unnamed user with email repository@ppns.ac.id
Date Deposited: 21 Sep 2018 02:46
Last Modified: 21 Sep 2018 02:46
URI: http://repository.ppns.ac.id/id/eprint/1067

Actions (login required)

View Item View Item