Items where Year is Not Specified

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 1114.

AAN, PROBORIANTO ANALISA OPTIMASI WAKTU DAN BIAYA DOCKING REPAIR KAPAL DENGAN METODE CPM (CRITICAL PATH METHOD). [Tugas Akhir]

ACHMAD, SEPTIAN HIDAYAT PENANGANAN PERMASALAHAN JOINT ERECTION BLOCK EB3-EB4 PS PADA KAPAL LCU (LANDING CRAFT UTILITY) DI PT LAMONGAN MARINE INDUSTRY. [Tugas Akhir]

AGUNG, PUJI SANTOSO ANALISA KEKUATAN KONSTRUKSI PUSHER TUGBOAT BLOK 2B PADA KAPAL S129 16 METER. [Tugas Akhir]

AHMAD, IBNU ‘ALWANY DESAIN SISTEM HIDROLIK PADA GATE GRAVING DOCK DI PT. PELINDO MARINE SERVICE SURABAYA. [Tugas Akhir]

AHMAD, RIZKI HARITS MAULANA RECALULATION ANALYSIS OF CHOOSING DIAMETER LPG TRANSFER PIPE FROM THE TANKER TO STORAGE TANK AT PT OPSICO TERMINAL LPG SEMARANG. [Tugas Akhir]

ANDRE, SUSANTO ANALISA PENURUNAN DAYA IHP AKIBAT KERUSAKAN CYLINDER LINER PADA AUXILIARY ENGINE TIPE YANMAR 6N 165L EN DI MV MERATUS KUPANG. [Tugas Akhir]

ARAFAT, JUAN PAYA BADAR ANALISA PERFORMA MAIN ENGINE KAPAL MPI.S-045 SEBELUM DAN SESUDAH OVERHAUL BERDASARKAN NERACA KALOR. [Tugas Akhir]

ARDHI, PUTRA PRATAMA ANALISA PERFORMA LPG PUMP DENGAN INSTALASI PARALEL (P-110, P-120, P-140) PADA SISTEM DISTRIBUSI LPG DI PT.OPSICO TERMINAL LPG SEMARANG. [Tugas Akhir]

ARIF, EFFENDI STUDY KECEPATAN ANGIN TERHADAP MATERIAL ALUMINIUM 5083 PADA PENGELASAN MIG. [Tugas Akhir]

Abdi, Yoga Prasetyawan PERHITUNGAN SISA UMUR PREHEATER TUBE HRSG UNIT 1.1 PLTGU PT. PJB UP GRESIK. [Tugas Akhir]

Abdul, Azis Perencanaan Docking KRI. Bima Suci Dan MV. Meratus Borneo Di Graving Dock Irian Pt. Pal Indonesia (Persero). [Tugas Akhir]

Abdul, Aziz Khumaini Pengereman Dinamik Motor Induksi 3 Fasa. [Tugas Akhir]

Abdul, Hakim Ramadhani Desain WPS Pengelasan Dissimilar Joint Pipa SA 106 Grade B Dengan SA 312 TP 316L Dan Pengaruh Variasi Filler ER-309L, ER-316L, ER-317L Terhadap Kuat Tarik, Struktur Mikro, Nilai Kekerasan Dan Ketahanan Korosi. [Tugas Akhir]

Abdul, Syarif Sukamto Sistem Starting Heater Otomatis Untuk Mengurangi Kelembaban Motor Primary Air Fan Berbasis Mikrokontroller Pada PLTU 1 Jawa Timur. [Tugas Akhir]

Abdullah, - Analisa Teknis dan Ekonomis pada Pipa Non - Proteksi Korosi, Pipa dengan Painting , Pipa dengan Painting dan Wrapping pada Trunkline SP F4 Menuju SPU F PT Pertamina EP Field Asset 5 Sangasanga. [Tugas Akhir]

Abdur, Rozaq Firdaus Salsabil Analisa Pengaruh Surface Cleaning Pada Material SA 213-TP 316L Yang Terkena Sulfur Terhadap Struktur Mikro Dan Laju Korosi. [Tugas Akhir]

Abi, Rafdillah Analisa Unjuk Kerja Motor Diesel 4 Langkah 1 Silinder Berbahan Bakar Campuran Biosolar dengan Pertamax (92) dan Pertamax Turbo (98). [Tugas Akhir]

Abid, Abdillah Noer Perancangan Sistem Informasi Monitoring Lokasi Pekerja pada Keadaan Darurat dan Emergency Response Plan (ERP) Di Perusahaan Industri Asam Fosfat. [Tugas Akhir]

Achmad, Alauddin Amrulloh Rancang Bangun Automatic Speed Detector sebagai Monitoring Laju Container Truck dan Dump Truck pada Akses Jalan di Perusahaan. [Tugas Akhir]

Achmad, Azhar Cholil Evaluasi dan Perancangan Sistem Proteksi Petir Eksternal dan Internal Berdasarkan SNI 03-7015-2004 dan SNI IEC 62305-2009 Di Pabrik Gula Sidoarjo. [Tugas Akhir]

Achmad, Donni Wiratmoko Sistem Tracker Target Otomatis Untuk Pengendali Gerakan Meriam Pada Kapal Perang Menggunakan Optical Flow Algorithm. [Tugas Akhir]

Achmad, Fahmi Hoirunnizan Perancangan Raw Sugar Carrier Platform Sebagai Alat Pengaman Bagi Pekerja Dalam Proses Pengolahan Gula Setengah Jadi. [Tugas Akhir]

Achmad, Hasan Al-Amin Rancang Bangun Prototipe Kontrol dan Monitoring Blower pada Motor Bow Thruster Berbasis Internet di KM. Sabuk Nusantara 80. [Tugas Akhir]

Achmad, Irfan Khoharudin Syah Analisa Pengaruh Kavitasi pada Control Valve terhadap Getaran pada Pipa Blowdown. [Tugas Akhir]

Achmad, Kurnia Saka Sandi Pengaruh F/M Rasio Desain dan td (waktu detensi) Aerasi Terhadap Kemampuan Removal BOD dan TSS pada SWT PT. POMI Paiton. [Tugas Akhir]

Achmad, Najib Pamungkas Rancang Bangun Sistem Rekam Jejak Transaksi E-Money Menggunakan Segmentasi Plat Nomor Berbasis Pengolahan Citra dan IOT. [Tugas Akhir]

Achmad, Okta Aldy Pengaruh Konsentrasi Resin dan Variasi Susunan Layer FRP ( Fiberglass Reinforced Plastic ) Sebagai Pelapis Reducer Terhadap Ketahanan Korosi pada Asam Phospat dan Kekuatan Tarik. [Tugas Akhir]

Achmad, Rifqi Bachtiar Perencanaan Kemudi dan Daya Mesin Penggerak Kemudi pada Kapal Perintis 2000 GT. [Tugas Akhir]

Achmad, Rizal Aji Permana Identifikasi Bahaya pada Proses Maintenance Tangki Treatment T-1014 (Confined Space) pada Perusahaan Minyak dan Gas dengan Metode HIRARC dan BCA. [Tugas Akhir]

Achmad, Rizki Rizaldhi Analisa Penggantian Mesin Windlass Konvensional dengan Mesin Windlass Hidrolik. [Tugas Akhir]

Achmad, Sholikhan Arif Implementasi SCADA Master to Multiple Slave Menggunakan Protokol Modbus RTU. [Tugas Akhir]

Achmad, Usron Asaroni Analisis Struktur Mikro, Kekuatan Tarik dan Nilai Kekerasan pada Studi Kaus Terbakarnya Kapal Coaster. [Tugas Akhir]

Achmat, Ali Prambudi Pengaruh Jenis Katalis Dan Variasi Susunan Layer Frp (Fiberglass Reinforced Plastic) Terhadap Kekuatan Tarik Dan Ketahanan Korosi Pada Fluid Asam Phospat. [Tugas Akhir]

Adam, Samsudin ANALISA PENERAPAN METODE CRASHING PROJECT PADA PROYEK PATROL BOAT. [Tugas Akhir]

Ade, Nana Suwarna Sistem Monitoring SCADA Multiple Slave Devices pada Tangki Gula Tetes dengan menggunakan Komunikasi Protokol Modbus TCP/IP. [Tugas Akhir]

Adelia, Al Sakina Optimasi Setting Parameter Mesin Plasma Cutting Terhadap Kekasaran Permukaan dan Lebar Pemotongan pada Aluminium 5083 Menggunakan Metode Taguchi. [Tugas Akhir]

Aderizky, Priyatna ANALISA PATAH INSERT DRILL SAAT PROSES DRILLING MANTEL ROLL GILINGAN PADA MESIN BUBUT HORIZONTAL. [Tugas Akhir]

Adi, Krisna Bayu ANALISIS KECELAKAAN MENGGUNAKAN METODE EVENTS AND CAUSAL FACTORS ANALYSIS (ECFA) DAN FISHBONE ANALYSIS DI PERUSAHAAN FABRIKASI BESI BETON. [Tugas Akhir]

Adinda, Aqmarina Sabila Penilaian Risiko Automatic Stacking Crane (ASC) dengan Metode Fuzzy FMEA dan FTA Serta Pemilihan Rekomendasi Menggunakan BCA. [Tugas Akhir]

Aditia, Nugraha Studi Replating Kamar Mesin KM. Kalimas. [Tugas Akhir]

Aditiya, Pradana Evaluasi Penjadwalan Maintenance Overhead Crane(20 Ton) dengan Metod Reliability Centered Maintenance dan Analisis Prioritas Perawatan Menggunakan Metode Campbell Dudek Smith. [Tugas Akhir]

Aditya, Aldi Wibowo Optimasi Ketebalan Insulasi Multilayer Pada Offshore Pipeline untuk Mengurangi Tegangan Aksial. [Tugas Akhir]

Aditya, Firmansyah PENGUKURAN KELAYAKAN NILAI TEKNIS DAN ANALISIS BIAYA INVESTASI PADA PERANCANGAN MESIN PENDINGIN MULTI FUNGSI SEBAGAI FISH STORAGE DAN FISH DRYER. [Tugas Akhir]

Aditya, Galih Sasongko Koordinasi Posisi untuk Meningkatkan Peluang menyerang pada Robot Sepak Bola Beroda dengan Metode Fuzzy Logic Controller. [Tugas Akhir]

Aditya, Septiawan Pengaruh Safety Climate (Iklim Keselamatan) Terhadap Safety Behavior (Perilaku Keselamatan) di Perusahaan Pembuatan Besi Beton. [Tugas Akhir]

Aditya, Windhi Setyawan Analisis Type Flux Submerged Arc Welding Pada Material SA 572 Gr 50 Terhadap Sifat Mekanik Dan Komposisi Kimia. [Tugas Akhir]

Afandy, Wicaksono Rancang Bangun Wind Turbine Ventilator Menggunakan Generator Magnet Permanen Sebagai Sumber Energi Alternatif Dengan Sistem Penstabil Tegangan. [Tugas Akhir]

Afifah, Diyah Nur'aini Pemanfaatan Kandungan CaO Limbah Karbit sebagai Bahan Campuran dalam Pembuatan Bata Beton Pejal. [Tugas Akhir]

Afrigh, Fajar Rosyidiin Analisis Risiko dengan Metode Layer Of Protection Analysis pada Reactor Platforming (Study Kasus : Perusahaan Minyak dan Gas). [Tugas Akhir]

Aghnia, Uyun Implementasi Fire Risk Assessment (NFPA 551) dan Simulasi Desain Sistem Proteksi Kebakaran Aktif pada Ruang Panel ECSL. [Tugas Akhir]

Agil, Heri Vebrianto Analisa Kekuatan Ramp Door dengan Penambahan Panjang 2 Meter pada Kapal LCU ADRI. [Tugas Akhir]

Agil, Maruto Prijono ANALISA PENGARUH BULBOUS BOW TERHADAP TAHANAN KAPAL DAN KONSUMSI BAHAN BAKAR PADA KAPAL PERINTIS 2000 GT. [Tugas Akhir]

Agung, Eka Yudi Pratomo Analisis Variasi Arus Pengelasan Submerged Arc Welding Tandem pada Proses Pengerjaan Build Up Beam dengan Material HSLA A572 Gr 50 Terhadap Penetrasi, Kekerasan, dan Struktur Mikro. [Tugas Akhir]

Agung, Husada Setiyo Nugroho Rancang Bangun Jig And Fixture Survival Knife Untuk Proses Taper Grinding Pada Mesin Surface Grinding. [Tugas Akhir]

Agung, Prasetyo Nugroho KAJIAN NUMERIK TATA LETAK VENTILATOR RUANG KAMAR MESIN DI KAPAL COASTER 2000 GT. [Tugas Akhir]

Agung, Samudra Budi ANALISA GETARAN PADA AIR FIN COOLER EQUIPMENT 203-E-003- M4 AKIBAT MISALIGNMENT POROS. [Tugas Akhir]

Agung, Setiyo Budi REDESIGN RESCUE BOAT MENJADI CREW BOAT PADA PT. TRI RATNA DIESEL. [Tugas Akhir]

Agung `, Fathur Razaq Rancang Bangun Sistem Proteksi Kebakaran Otomatis Pada Plant Acetylene (Studi Kasus: Industri Produksi Gas). [Tugas Akhir]

Agusstiawarman, - Human Reliability Assessment Maintenance Penggantian Roll Menggunakan Metode HEART ( Human Error Assesment and Reduction Technique ) dan Pembuatan SOP ( Standart Oprational Procedure ) di Prushaan Baja. [Tugas Akhir]

Ahmad, Atsiiruddin Al Haqqi Pengaruh Variasi Temperatur Preheat Dan Pendinginan Pada Pengelasan Dissimilar Carbon Steel Dengan Cast Iron. [Tugas Akhir]

Ahmad, Bagus Asmara Dana Rancang Bangun Alat Pengujian Tekanan (Burst Test) Pada Produk Plastik Tube Garnier 100ml Dengan Sistem Elektropneumatik. [Tugas Akhir]

Ahmad, Fahruddin Analisa Proses Replating pada Kapal MV. Meratus Borneo Di PT. PAL Indonesia (Persero). [Tugas Akhir]

Ahmad, Fakhruddin Redesain Jalur Pipa Karbon Dioksida (CO2) pada Workshop 1 Fabrikasi Baja PT. Swadaya Graha Gresik. [Tugas Akhir]

Ahmad, Ilham Pengendalian Kedalaman dan Kemiringan Gerak Rolling ROV ( Remotely Operated Vehicle ) Menggunakan Metode Neural Network. [Tugas Akhir]

Ahmad, Jaaddul Haq Simulator Engine Telegraph Unit (ETU) di Kapal Coaster 2000 GT dengan Fitur Record Data Berbasis Mikrokontroler. [Tugas Akhir]

Ahmad, Nadhif Wicaksono Aji Pengaruh Water Hammer Terhadap Pipa dan Check Valve pada Line 1-8”-PKS-CM-1019 Discharge Pump TPL 1-PM-002C (Studi Kasus PT. Pertamina TBBM Tuban). [Tugas Akhir]

Ahmad, Nizar Zulfi Analisa Frost Formation Pada Pipa Reflux Accumulator Menuju Score Column Reflux Pump di Kilang LPG. [Tugas Akhir]

Ahmad, Randi Taufiqussyakir Rancang Bangun Dissolved Air Flotation Terhadap Penurunan Kadar Minyak Dan Lemak Pada Limbah Cair Industri Bir Dan Minuman Ringan. [Tugas Akhir]

Ahmad, Rizal Fawzi Penentuan Harga Pokok Produksi Aircraft Cabin Part (pocket spring) dengan Pendekatan Time Driven Activity Based Costing (Studi Kasus PMA Unit GMF Aeroasia Tbk.). [Tugas Akhir]

Ahmad, Sahlan Musthofa Analisa Kuat Tarik Plat Akibat Perlakuan Fairing Pada Proses Replating Daerah Bilga. [Tugas Akhir]

Ahmad, Syamsul Arifin Analisis Welding Technicque Single layer dan Multi layer Pada Pipa Cu-Ni (Copper-Nickel) dengan Proses pengelasan GTAW Terhadap Struktur mikro dan Sifat Mekanik. [Tugas Akhir]

Ahmad, Wahyu Krishadiatno ANALISIS BAHAYA LISTRIK BERDASARKAN PUIL 2011 DAN PENGUJIAN INFRARED THERMOGRAPHY TEST PADA PANEL DI PPNS (POLITEKNIK PERKAPALAN NEGERI SURABAYA). [Tugas Akhir]

Ahmad, Wildan Hakim Kajian Numerik Pengaruh Geometri Pig Launcher Pada Proses Pig Launching Di Proyek Jakarta Tank Terminal (Phase 2A1). [Tugas Akhir]

Ahmad, Zaini ANALYSIS OF THE EFFECT OF SHAFT MISALIGNMENT ON TRANSFER PUMP VIBRATION ON LPG DISTRIBUTION SYSTEM. [Tugas Akhir]

Ahmi, Arofatur Rizkia Analisis Kekuatan Pondasi Turntable Akibat Adanya Beban Operasional Menggunakan Metode Elemen Hingga. [Tugas Akhir]

Ahyad, Bagas Nur Hidayatulloh Rancang Bangun Exhaust System pada Mobil Minimalis Roda Tiga. [Tugas Akhir]

Ahyanul, Makin Pengaruh Variasi Susunan Wofen Rofing dan Mat Terhadap Ketahanan Korosi serta Kekuatan Tarik pada Aliran Asam Phospat. [Tugas Akhir]

Ainun, Dwi Fridayati Penilaian Postur Pekerja Pengantongan Pupuk dan Perancangan Metode Kerja Menggunakan Metode OCRA Index di Perusahaan Produsen Pupuk. [Tugas Akhir]

Ainun, Hanna Analisis Respon Struktur Konstruksi Shaft Bracket Tipe V Poros Propeller KM. Sabuk Nusantara 72 Dengan Menggunakan Metode Elemen Hingga. [Tugas Akhir]

Ajeng, Pramudita Kuntadirga Pengaruh Perbandingan Performance Antara Penggunaan Bahan Bakar Gas dan Bahan Bakar Minyak Beserta Simulasi Combustor dengan Software ANSYS Pada Turbin Gas Dual Fuel PT. PJB Gresik. [Tugas Akhir]

Aji, Bagus Aprian Nugroho ANALISA PENGARUH BENTUK LAMBUNG AXE BOW TERHADAP TAHANAN TOTAL PADA KAPAL OPV 80 M. [Tugas Akhir]

Aji, Fitrah Insani Rancang Bangun Automated Rubber Tyred Gantry Untuk Pemilihan Dan Pemindahan Peti Kemas Di Pelabuhan Berbasis Android. [Tugas Akhir]

Aji, Machmudi ANALISIS PENGARUH SLOSHING LOAD TERHADAP KEKUATAN KONSTRUKSI CORRUGATED BULKHEAD AKIBAT PENAMBAHAN UPPER STOOL. [Tugas Akhir]

Aji, Maulana Perancangan Insulasi Pada Jalur Pipa Heating Coils Kapal Tanker 17500 LTDW. [Tugas Akhir]

Aji, Putra Pradana Implementasi Lean Manufacturing Guna Mengidentifikasi dan Mengurangi Waste pada Proses Produksi Bolster (Studi Kasus Divisi Pengecoran di PT. Barata Indonesia, Gresik). [Tugas Akhir]

Akhmad, Diki Wahyu Pratama Klasifikasi Kendaraan Bermotor Menggunakan Pengolahan Citra Dengan Metode Linear Discriminant Analysis (LDA) Pada Jasa Parkir Modern. [Tugas Akhir]

Akhmad, Fachrul Roudhomi Analisis Risiko untuk Penentuan Prioritas Perbaikan pada Pulverizer di Perusahaan Pembangkit Listrik Tenaga Uap. [Tugas Akhir]

Akhmad, Khoiruddin Adirama Analisis Pengulangan PWHT akibat Power Failure pada Material SA 106 Gr.B terhadap Struktur Mikro dan Sifat Mekanik. [Tugas Akhir]

Akhmad, Selmy Jayyidi Analisis Risiko Arc Flash Menggunakan Electric Transient Analysis Program (ETAP) pada Bus Tegangan Menengah dan Rendah PLTU. [Tugas Akhir]

Akhzam, Samyvikar Optimasi waktu siklus produksi kemasan produk botol toner 200ml pada proses blow molding dengan menggunakan metode respon surface. [Tugas Akhir]

Albian, Wanda Syauqi Rancang Bangun Pendeteksi Lubang pada Jalan Menggunakan Gray Level C0-Occurent Matrix (GLCM) dan Neural Network (NN). [Tugas Akhir]

Aldi, Ari Wahyudi Analisa Variasi Gap dan Kuat Arus pada Pengelasan Kombinasi SAW dan FCAW Material KI Grade A Terhadap Sifat Mekanik dan Metallography. [Tugas Akhir]

Aldi, Reynaldy Arifin Rancang Bangun Sistem Kontrol Spout Mesin Pengisi Semen Berbasis PLC Sebagai Pengganti Basic Unit Dialog Pabrik Tuban 4 PT Semen Indonesia (Persero) Tbk. [Tugas Akhir]

Aldian, Dwi Pamungkas Rancang Bangun Telemetri Arus Beban Peralatan Elektronik pada Ruang Penumpang Kapal Ferry Berbasis Long Range Wireless Communications (LORA). [Tugas Akhir]

Alfan, Faiz Hidayatullah Desain Armrest dan Fasilitas Footcycling dalam Pengembangan Kursi Roda sebagai Alat Rehabilitasi Penderita Stroke. [Tugas Akhir]

Alfan, Hamsyah Pengaruh Post Heating pada Pengelasan Doubling Plate dengan Pendinginan Langsung Air Laut. [Tugas Akhir]

Alfathan, Hayyan Rifardi DESAIN DUDUKAN SEA RIDER PADA KAPAL PATROLI LEPAS PANTAI 80 M. [Tugas Akhir]

Alfi, Kurnia Setiawan ANALISA PENGARUH KERUSAKAN SEATING VALVE CYLINDER HEAD TERHADAP TURUNNYA DAYA MESIN DIESEL HND TBD234 V8 PADA KAPAL MERATUS BANJAR 1. [Tugas Akhir]

Alfia, Lutfiana Pengenalan Ucapan Sebagai Pengendali Gerakan Kursi Roda Secara Real-Time dengan Metode MFCC dan BP-NN. [Tugas Akhir]

Alfian, Fikri Fanani Rancang Bangun Alat Pemberi Pakan Burung Puyuh Petelur Otomatis Berbasis Arduino. [Tugas Akhir]

Alfian, Hirzan Analisis Kepuasan Pelanggan PT. Samudera Surabaya Logistik Dengan Implementasi Marketing Mix 4P Menggunakan Metode Importance Performance Analysis. [Tugas Akhir]

Alfianuddin, Nazar Prototype Sistem Sorting Packaging Rokok dengan Metode Convolution Neural Network. [Tugas Akhir]

Alfida, Widihapsari Analisis Arc Flash dengan Metode Kurva Batasan Energi dan Arc Blast pada Low Voltage Main Distriburion Panel Perusahaan Fabrikasi Baja. [Tugas Akhir]

Alfin, Faisal Nur Aplikasi Monitoring Data Hasil Routine Test Transformator Berbasis Android di PT. Bambang Djaja Surabaya. [Tugas Akhir]

Alfin, Rahmatulloh Pembuatan Sistem Informasi Manajemen Work Permit Berbasis Aplikasi Website dan Android pada Perusahaan Phythalic Anhydride. [Tugas Akhir]

Alfinia, Laila Syahnas PERENCANAAN SAFETY AND FIRE CONTROL PLAN PADA KM. X SESUAI DENGAN STANDAR SOLAS. [Tugas Akhir]

Alfredo, Bagas Prambudi Penilaian Risiko Postur Kerja Menggunakan Metode RULA REBA Dan Perancangan Fasilitas Kerja Pada Pekerjaan Di Plant Acetylene. [Tugas Akhir]

Algiano, Pradhaneswara Santoso REDESAIN VACUUM BOX UNTUK PENGETESAN LAS PADA DAERAH RADIUS. [Tugas Akhir]

Ali, Sofyan Desain Expansion Loop Pada Line Suction Pump 33-LP-0001/0002/0003/0004/0008/0009 Proyek Jakarta Tank Terminal Phase 2A. [Tugas Akhir]

Aliefvia, Fikri Brilliani Penilaian Risiko pada Steam Reforming Unit dengan Menggunakan Metode Energy Trace Barrier Analysis dan Fault Tree Analysis Methods. [Tugas Akhir]

Alif, Mas Sakti Pandu Auliya Analisis Back Weld Dan Multiple Repair Pada Pengelasan A- 573 Grade 70 Terhadap Sifat Mekanik Dan Struktur Mikro. [Tugas Akhir]

Alif, Siti Fatimah Analisa Pengaruh Penggunaan Skeg Terhadap Tahanan dan Stabilitas Kapal pada Tugboat Aquiles 05. [Tugas Akhir]

Alifah, Reni Dewanti Analisa Pengaruh Kepribadian dan Faktor Personal terhadap Perilaku Keselamatan di Perusahaan Galangan Kapal. [Tugas Akhir]

Alimadudin, Imam Rosyadi Analisis Pengaruh Pengasutan Motor Induksi Terhadap Tegangan dan Arus Pada Jaringan Kelistrikan Laboratorium Reparasi Listrik, Elektronika Daya dan Mesin Listrik di PPNS Menggunakan Etap. [Tugas Akhir]

Alistia, Nur Ramadhani ANALISA PERBANDINGAN BERAT WASTE PADA BLOCK SECTION 04 KAPAL CARGO ROPAX 300 APABILA PROSES CUTTING DILAKUKAN DENGAN METODE MANUAL DIBANDING DENGAN NC BERBASIS NESTING. [Tugas Akhir]

Alvianto, Timbang Allo Analisis Pengaruh Multiple Repair pada Pengelasan Material Yang Telah Mengalami Cold Working terhadap Kekerasan, Struktur Mikro dan Impact. [Tugas Akhir]

Alvine, Fadhila Syahputra Analisa Tegangan pada Konstruksi Crane Foundation dan Koreksi Nilai Safety Factor yang Telah diijinkan oleh BKI pada Kapal Kontainer 100 Teus. [Tugas Akhir]

Amalia, Sabrina Perancangan Concrete Weight Pada Instalasi Pipa Bawah Laut. [Tugas Akhir]

Amanda, Putri Agus Triyanti Desain Noise Barrier pada Mesin Compressor Menggunakan Metode ISO 9613-2 (Studi Kasus di Industri Galangan Kapal). [Tugas Akhir]

Amar, Sastra Adi Analisis Multiple Repair pada Pengelasan Material SA 240 TP 904L terhadap Struktur Mikro, Kekerasan, dan Laju Korosi. [Tugas Akhir]

Amelia, Laksmi Desain Proses Produksi Survival Knife dengan Metode Operation Process Chart di Perusahaan Manufaktur. [Tugas Akhir]

Amilia, Septiyani Analisa Dinamik pada Sistem Perpipaan Akibat Getaran Pompa. [Tugas Akhir]

Amir, Mahmud Rancang Bangun Sistem Monitoring Kondisi Return Air Filter Air Conditioner Berbasis Mikrokontroler pada Kereta K1. [Tugas Akhir]

Amirul i, Ardhian Al Faruq ANALISA UNJUK KERJA TWO STROKE MARINE DIESEL ENGINE BERBAHAN BAKAR CAMPURAN BIODIESEL MINYAK JAGUNG DAN SOLAR (HSD). [Tugas Akhir]

Andana, Denis Kumara Perancangan Ventilasi Mekanik sebagai Sistem Pengkondisian Udara Mengacu pada Peraturan Meteri No. 5 Th. 2018 untuk Mengurangi Paparan Panas (Studi Kasus : Ruang Bagging Pabrik Pupuk). [Tugas Akhir]

Andi, Ari Wibowo Pengaruh Welding Sequence Dan Temper Bead Welding Pada Material SM 490 Terhadap Distorsi Sifat Mekanik Dan Metalografi pada Proses Pembuatan Bogie Kereta Api LRT Palembang. [Tugas Akhir]

Andik, Aris Setiawan Optimasi Parameter 3D Printing Terhadap Keakuratan Dimensi Dan Kekasaran Permukaan Produk Menggunakan Metode Taguchi Grey Relational Analysis. [Tugas Akhir]

Andika, Billy Ganesya Pengaruh Variasi Kelembaban,Temperatur,Ketebalan Cat pada Material A 53 Grade B Terhadap Laju Korosi di PT PJB UBJOM Pacitan Studi Kasus PLTU 1 Jawa timur. [Tugas Akhir]

Andiqin, Valetthyo Penentuan Lintasan Kritis dan Penilaian Risiko Berdasarkan Standar AS/NZS 4360:2004 pada Pembangunan 2 Unit Kapal Catamaran Multipurpose Offshore Vessel. [Tugas Akhir]

Andre, Faizal Analisa Koordinasi Rele Proteksi Transformator Kontrol 20KV Plan Tuban 3 Di PT. Semen Indonesia (Persero) Tbk. [Tugas Akhir]

Andrianto, Setiawan Analisa Pengaruh Efek Sloshing Fluida Mogas Akibat Gempa Terhadap Dinding Storage Tank (TK0302) Studi Kasus PT Jakarta Tank Terminal Phase 2A Project. [Tugas Akhir]

Angga, Dwi Prasetya Analisis Faktor - Faktor Yang Mempengaruhi Perubahan Laba Pada Perusahaan Sektor Transportasi Laut. [Tugas Akhir]

Angga, Prasojo DESAIN INTERIOR RUANG PENUMPANG KAPAL PERINTIS 1200 DENGAN TEMA SCANDINAVIAN UNTUK MENINGKATKAN KENYAMANAN. [Tugas Akhir]

Angga, Setiawan Pratama Deteksi Label Menggunakan Pengolahan Citra Dengan Metode Principal Component Analysis (PCA) Pada Rejector Botol Kemasan. [Tugas Akhir]

Angga, Yudha Satria Analisa Model Getaran Diesel Generator Pada Kapal Tunda. [Tugas Akhir]

Anindya, Irsadyah Rayi Pramesi Analisis Pengaruh Faktor Psikososial dan Faktor Individu terhadap Sick Building Syndrome (SBS) pada Pekerja di Gedung Service Building Perusahaan Pembangkit Listrik. [Tugas Akhir]

Anis, Mirawati Identifikasi Bahaya pada Section Marking Cutting dan Shotblasting Process di Perusahaan Manufaktur dengan Metode HIRARC. [Tugas Akhir]

Anis, Rosyida Pemanfaatan Limbah Pasir Foundry sebagai Material Agregat Halus dalam Pembuatan Bata Beton (Paving Block) (Studi Kasus: Pabrik Peleburan Baja di Gresik). [Tugas Akhir]

Anisa, Puri Rahayu Studi Perhitungan Sistem Pengkondisian Udara (HVAC) pada B Deck Kapal Tanker 157 Meter di PT. PAL Indonesia (Persero). [Tugas Akhir]

Anisah, Hajar Analisis Risiko Kebakaran Dengan Metode ETA (Event tree analysis) serta Implementasi Pre Fire Planning Tangki Timbun Premium (T-51). [Tugas Akhir]

Anisya, Kusumaningrum Perencanaan Jadwal Induk Produksi Pada Produk Nas Shoes Dengan Menggunakan Metode Perencanaan Agregat Di Perusahaan Furniture. [Tugas Akhir]

Anjan, Victor Perdana Perancangan Ulang Instalasi Pengolahan Air Limbah (IPAL) RSUD Dr. R. Koesma Tuban. [Tugas Akhir]

Anjar, Nala Puspita Identifikasi Bahaya Listrik Menggunakan Failure Mode and Effect Analisys Fault Tree Analisys pada Panel di Industri Persewaan Alat Berat. [Tugas Akhir]

Anna, Ngesthi Santoso Analisis Pengaruh Faktor Internal dan Eksternal Terhadap Burnout Pekerja di Pabrik Plastik. [Tugas Akhir]

Annisa, Aulia Putri Evaluasi Penjadwalan Proyek Sebagai Optimalisasi Biaya dan Waktu dengan Precedence Diagram Method (Studi Kasus Proyek Conveyor CO-7). [Tugas Akhir]

Annisa, Hafshari Sistem Informasi Monitoring Pelaksanaan Inspeksi Harian Berbasis Web Responsif pada Peralatan Angkat (Studi Kasus: Perusahaan Galangan Kapal). [Tugas Akhir]

Antin, Surya Rosalina Analisis Pengaruh Lingkungan Kerja, Beban Kerja dan Faktor Individu Terhadap Stres Kerja Pada Pekerja Bagian Assembl (Studi Kasus di Divisi Kapal Niaga Pada Perusahaan Galangan Kapal). [Tugas Akhir]

Anugerah, Irianti Pembuatan Sistem Informasi Reminder Program K3 Berbasis Website pada Perusahaan Produksi Gula. [Tugas Akhir]

Aprilia, Ratna Analisa Produktivitas Crane pada Proses Bongkar Muat Petikemas di PT Terminal Teluk Lamong. [Tugas Akhir]

Aprilita, Sari Identifikasi Potensi Bahaya Menggunakan Metode Hazard and Operability Study (HAZOP) dan Risk Mapping Pada Unit Hydrogen Plant di Perusahaan Refinery Used Oil. [Tugas Akhir]

Ardenza, Dicha Iswara Desain Expansion Loop pada Line AFC/AEI/-LND/C-18.0217/004 Untuk Proses Molecular Sieve Adsorber Di Perusahaan Gas. [Tugas Akhir]

Ardiend, Prawiro Sakti Perbandingan Penggunaan Daya Motor Penggulung Pemotongan Sisa Plat Baja Menggunakan Variable Speed Drive dan Triac Di Pabrik Produksi Pipa Baja Surabaya. [Tugas Akhir]

Ardino, Putra Perbawa Identifikasi Bahaya pada Hot Working di Confined Space dengan Metode HIRARC dan FTA Serta Pemilihan Solusi dengan Metode BCA di Industri Kapal. [Tugas Akhir]

Ardita, Atmaja Analisis Flow Rate Gas Back Purging Ar pada Pengelasan Stainless Steel dengan Proses GTAW terhadap Struktur Mikro dan Laju Korosi dengan Media Decalcium. [Tugas Akhir]

Ari, Afrizal Mustofa Rancang Bangun Sistem Kontrol Penanganan Kebakaran Otomatis Dilengkapi Dengan Informasi Lokasi Kebakaran Menggunakan GPS dan Protokol MQTT. [Tugas Akhir]

Ariandi, Destyandra Hermanu EVALUASI SALURAN HISAP DEBU UNTUK SISTEM DUST COLLECTOR (STUDI KASUS DI TRANSFER TOWER 0 (TT 0) PT. PJB UBJOM PLTU PACITAN). [Tugas Akhir]

Arief, Fathoni Monitoring Kecepatan, Sarat, dan Aliran Bahan Bakar Berbasis Mikrokontroler. [Tugas Akhir]

Ariel, Dwi Putra Kusuma Perencanaan Perawatan Ship Unloader dengan Metode Markov Chain Guna Mencegah Kecelakaan Kerja dan Menekan Biaya Perawatan pada PLTU. [Tugas Akhir]

Arif, Fahmy Pengaruh Beban Kerja terhadap Kinerja pada Pekerja Maintenance RTG di Perusahaan Bongkar Muat Barang Surabaya. [Tugas Akhir]

Arif, Purnomo Aji Analisis Penyebab Kerusakan Spiral Wires Pada Electrostatic Precipitator di PLTU. [Tugas Akhir]

Arif, Purnomo Aji Analisis Penyebab Kerusakan Spiral Wires Pada Electrostatic Precipitator di PLTU. [Tugas Akhir]

Arif, Syaifudin ANALISA PENGELASAN KOMBINASI GMAW-SAW ANTARA SAMBUNGAN SHELL-BALLFRONT TERHADAP SIFAT MEKANIK DAN METALLOGRAPHY. [Tugas Akhir]

Arinda, Lona Asmawati Analisis Kecelakaan dengan Metode Event and Causal Factor Analysis (ECFA) dan Fault Tree Analysis (FTA) serta Pemilihan Rekomendasi Menggunakan Benefit Cost Analysis (BCA) di Perusahaan Galangan Kapal. [Tugas Akhir]

Arini, Nur Fitriyani Identifikasi Kegagalan Komponen pada Unit Boiler dengan Menggunakan Metode FMECA dan FTA (Studi Kasus : Perusahaan Pupuk). [Tugas Akhir]

Aripta, Hendra Waskito Perencanaan Jalur Pipa HDPE Fire Hydrant System dan Anggaran Biaya Kegiatannya pada Seluruh Area Hydrant Lama Luar Gedung PPNS. [Tugas Akhir]

Aristi, Hanifah Fauziyah Rancang Bangun Dua Sistem untuk Vakum dan Kompresi dalam satu Alat yang digunakan untuk Vaccum infusion pada proses laminasi kapal fiber. [Tugas Akhir]

Arizanul, Faisal Lukmana Analisis Kekuatan Struktur dan Estimasi Fatigue Life Pada Konstruksi Double Girder Overhead Crane Berkapasitas SWL 20 Ton. [Tugas Akhir]

Arlieza, Nadya Pradini Komposting Sampah Sisa Makanan dan Daun dengan Metode Rotary Drum Composter (Studi Kasus: Politeknik Perkapalan Negeri Surabaya). [Tugas Akhir]

Armada, Abdul Hamid Analisis Perbaikan Deformasi pada Pelat Lambung Kapal terhadap sifat Mekanik dan Struktur Mikro. [Tugas Akhir]

Arry, Agus Wahyudi Syahputra Rancang Bangun Sistem SCADA Berbasis Android Pada Tangki Gula Tetes Dengan Sistem Redundant Menggunakan Komunikasi Modbus TCP/IP. [Tugas Akhir]

Arsa, Almera Adzani STUDI PEMANFAATAN REJECT WATER SWRO DAN FLARE GAS UNTUK PRODUKSI GARAM. [Tugas Akhir]

Arum, Mujayanah ANALISIS KESELAMATAN KAPAL NELAYAN DENGAN METODE ENVIRONMENTAL STRESS BERBASIS DATA AUTOMATIC IDENTIFICATION SYSTEM. [Tugas Akhir]

Arum, Taranisa ANALYSIS OF VARIATIONS IN SANDBLASTING PRESSURE TO ROUGHNESS. [Tugas Akhir]

Arwinda, Praditasari Rancang Bangun Unit Clearator Pengolahan Fish Pond Menjadi Air Bersih. [Tugas Akhir]

Arya, Trinanda Kusuma Analisis Variasi Arus Pengelasan dan Solvent A-TIG(Activated-Tungsten Inert Gas) Material SA 240 Tipe 304 Terhadap Radiography, Hardness dan Metallography. [Tugas Akhir]

Aryaningsih, Aryaningsih ESTIMASI KEBUTUHAN MATERIAL DAN ELEKTRODA PADA REPARASI PERGANTIAN SIDEBOARD KAPAL TONGKANG 365 FEET. [Tugas Akhir]

As'ad, Syamsul Arifin Rancang Bangun Panel Kontrol dan Monitoring Overcurrent Motor Pompa Hidrolik pada Mesin Injection Molding 62 MDP-05 Berbasis Mikrokontroler. [Tugas Akhir]

Asa, Kakilangi Redesain Lambung Axe Bow pada Passenger Boat. [Tugas Akhir]

Asadina, Kusma Cahyaninggalih Pengaruh pH dan Temperatur terhadap Recovery Amonium Hidroksida (NH4OH) dari Limbah Regenerasi Condensate Polisher. [Tugas Akhir]

Asfiem, Rahmat Haqin Pengaruh Laju Aliran dan Suhu terhadap Laju Korosi Erosi Crude Palm Oil pada Elbow Material Carbon Steel A53 Grade B. [Tugas Akhir]

Asri, Dwi Widiastuti Perencanaan Kegiatan Perawatan menggunakan Metode RCM II pada Kompresor Make-Up Gas Unit (Studi Kasus: Perusahaan Pengolahan Minyak Pelumas). [Tugas Akhir]

Astri Fandani, Mariyana Evaluasi Dan Analisa Kinerja Proyek Dengan Metode Earned Value Pada Proyek Pembangunan Kapal Ferry 2000 Gt (Studi Kasus: Pt. Adiluhung Saranasegara Indonesia). [Tugas Akhir]

Aswin, Irwanto Rancang Bangun Auto Boost Converter Pada Panel Surya Menggunakan Metode Fuzzy Logic. [Tugas Akhir]

Aufal, Nanda Oktova Analisa Teknis Penambahan Double Bottom KMP. Dewana Dharma. [Tugas Akhir]

Aura, Muhammad Rais Analisa Bahayadan Risiko Aktivitas Pengelasan dengan Operating and Support Hazard Analisys (OSHA) dan Event Tree Analisys (ETA) (Studi Kasus : Perusahaan Jasa Konstruksi Gresik). [Tugas Akhir]

Avista, Nuraini ANALISIS STABILITAS KM. X AKIBAT PENAMBAHAN DOUBLE BOTTOM. [Tugas Akhir]

Awahida, Widi Yon Arvindi Azizah Efek Kombinasi Beban Crossing Highway-Railway Pada Pipeline. [Tugas Akhir]

Awallia, Wahyu Syahputri Analisa Pengaruh Variasi Interval Waktu Antar Lapisan Coating Terhadap Daya Rekat Cat. [Tugas Akhir]

Awallia, Wahyu Syahputri Analisa Pengaruh Variasi Interval Waktu Antar Lapisan Coating Terhadap Daya Rekat Cat. [Tugas Akhir]

Aynur, Roychan Analisa Unjuk Kerja Combustor Unit 3.2 Pada PLTGU PT. PJB Gresik Berbasis CFD. [Tugas Akhir]

Ayu, Ratnasari Analisa Pengaruh Konfigurasi Support Terhadap Tegangan dan Vibrasi Line Product Shortening & CBS Plant. [Tugas Akhir]

Ayu, Rossa Agustin Nursavy Analisa Laju Korosi Material Carbon Steel SS400 Pada Roof Top Tangki T-14 Dengan Variasi Ketebalan Coating dan Temperatur. [Tugas Akhir]

Ayu, Safitri Analisis Perbandingan Alternatif Pemenuhan Kapasitas Cooling Water Chiller dengan Penggantian Pompa dan Penambahan Jalur Pipa Baru pada Proses Produksi Sabun. [Tugas Akhir]

Ayu, Sekarmanik ANALISIS STABILITAS KAPAL FISHKING 6 METER BERDASARKAN IMO DI PT. TRI RATNA DIESEL INDONESIA. [Tugas Akhir]

Ayu Dhea Mustofa, Diska Analisa Pengambilan Keputusan Proses Pengadaan Steering Gear Dalam Proyek Pembangunan Kapal Perintis 2000 GT. [Tugas Akhir]

Ayunda, Citra Maiyasa Evaluasi dan Perancangan Sistem Proteksi Petir di PG. Ngadirejo Kediri. [Tugas Akhir]

Aziz, Rafif Nabhan Perencanaan Jalur Pipa Fire Fighting Menggunakan Fluida Air dan Busa di Gedung CPC Perusahaan Minyak Nabati. [Tugas Akhir]

Aziz, Rofii Desain Preheater Udara Yang Memanfaatkan Panas Air Blowdown Continue Boiler Di PT. Perkebunan Nusantara X PG Ngadiredjo. [Tugas Akhir]

BANGGA, AGUNG PRIYAMBADA ANALISA LAJU KOROSI PADA KAPAL BAJA (KM. DOLPHIN III). [Tugas Akhir]

BAROT, MIFTAHUDDIN SALAM ANALISA PENGARUH PENYUMBATAN TUBE TERHADAP KINERJA HEAT EXCHANGER 30-E-2501 JENIS SHELL AND TUBE. [Tugas Akhir]

Bagas, Aji Saputra Rancang Bangun Monitoring Proteksi Motor Pompa Uap Akibat Unbalance Tegangan Berbasis Iot Di PLTGU. [Tugas Akhir]

Bagas, Harits Wibowo Studi Laju Erosi dan Pengendapan Akibat Fluida Campuran antara Udara dan Fly Ash terhadap Elbow. [Tugas Akhir]

Bagas, Prathama Argantoro Putro Analisis Perbandingan Kombinasi Elektroda dengan Pengaplikasian Buttering Layer E309L pada Material Carbon Steel dengan stainless steel untuk Pembuatan Welding Procedure Spesification (wps). [Tugas Akhir]

Bagas, Rama Putra Arjanto Analisis Penggunaan Jenis Backing Gas pada Pengelasan GTAW Pipa Stainless Steel 316L Full Layer terhadap Struktur Mikro, Kekerasan, Ferrite Content dan Laju Korosi. [Tugas Akhir]

Bagas, Ramadhan Sutrisno Analisa Nilai Kekasaran dan Kebulatan Permukaan Lubang Hasil Pembubutan Baja ST 41 dengan Metode Taguchi GRA (Grey Relational Analysis). [Tugas Akhir]

Bagas, Saras Ardianarsya Inventarisasi Emisi dan Pemodelan Dispersi Emisi PM ( Particulate Matter ) 2,5 PT. Semen Indonesia (Persero) Tbk. [Tugas Akhir]

Bagasqara, Eka Putra Rancang Bangun Multi Automated Guided Vehicle (Agv) Pengangkut Kardus Menggunakan Komunikasi Wireless. [Tugas Akhir]

Bagus, Estusaputra Pengaruh Busy Director dan Experienced Director terhadap Profitabilitas Perusahaan. [Tugas Akhir]

Bagus, Fatahhillah Perancangan Mobile Crane Kapasitas 2 Ton Sebagai Sarana Penunjang Galangan Reparasi. [Tugas Akhir]

Bahtiyar, Aziz Analisa Kebutuhan Airbag untuk Peluncuran Kapal Ponton di PT. Kukar Mandiri Shipyard. [Tugas Akhir]

Balqis, Innayatul Isnaini Perancangan Sistem Informasi Monitoring Dan Inspeksi Tangki Evaporator (Bejana Uap) Berbasis Web (Studi Kasus: Pabrik Pengolahan Tebu). [Tugas Akhir]

Balqis, Ramadhani Pemanfaatan Limbah Slag Aluminium sebagai Bahan Substitusi Semen dalam Pembuatan Beton Normal (Studi Kasus : Kawasan Home Industry Kecamatan Sumobito). [Tugas Akhir]

Bantar, Melvina Rossa Perencanaan Kegiatan Perawatan Menggunakan Metode RCM II dan Life Cycle Cost (LCC) Pada Mud Pump di Industri Gula. [Tugas Akhir]

Bariklana, M. Akmal Analisa Efeitivitas RTG Dengan Metode Overall Equipment Effectiveness Dan Failure Mode Effect Analysis. [Tugas Akhir]

Basuki, Tri Laksono Penerapan Metode CPM dan Crashing untuk Pengendalian Proyek: Studi Kasus Proyek Pembangunan Pipa Transmisi Gas. [Tugas Akhir]

Bayu, Aji Ardiansyah Rancang Bangun Sistem Pengering Ampas Tebu Berbasis Arduino Uno Pada Konveyor 2 Stasiun Boiler. [Tugas Akhir]

Bayu, Alfahmiliddin Analisis Prediksi Umur Dock Block Di Fasilitas Galangan Kapal PT. Adiluhung Saranasegara Indonesia. [Tugas Akhir]

Bayu, Priyolaksono PERANCANGAN KONSTRUKSI DI DAERAH BOW THRUSTER PADA KAPAL PATROLI POLISI 73. [Tugas Akhir]

Bayu, Raditya Aziz Perancangan Letak Posisi Eye Plate untuk Pengangkatan Block Wheelhouse pada Proses Erection Kapal Perang 83.85 Meter. [Tugas Akhir]

Bayu, Tri Susisno PENGARUH PENAMBAHAN KONTRUKSI UNTUK MENGURANGI GETARAN PADA KAMAR MESIN KM SABUK NUSANTARA 71. [Tugas Akhir]

Bella, Setia Murni ANALISA PERENCANAAN DOCKING MV. X MENGGUNAKAN AIRBAG. [Tugas Akhir]

Benta, Awan Tristiawan Rancang Bangun Mesin Wire Bending 2D Berbasis Arduino Untuk Produksi Hanger Kawat Pakaian. [Tugas Akhir]

Beta, Dena Qowima Analisis Olah Gerak (Seakeeping) Kapal Penumpang Untuk Mengetahui Tingkat Operabilitas Dan Seaworthness. [Tugas Akhir]

Bety, Nor'aini Perancangan Ulang Bag Filter Di Unit Arc Furnace Di Industri Pengecoran Baja. [Tugas Akhir]

Bety, Noraini Perancangan Ulang Bag Filter Di Unit Arc Furnace Di Industri Pengecoran Baja. [Tugas Akhir]

Bhinta, Ramadha Analisis Tekno Ekonomi Penggunaan Material Carbon Steel SA 106 Grade B dan FRP (Fiberglass Reinforced Plastic) pada jalur Water Injection Pipeline 10" 3000 M CPA - Mudi Pad C JOB PPEJ Tuban. [Tugas Akhir]

Bianda, Devi Puspita Analisa Risk Based Maintenance Sistem Minyak Pelumas KT. Bima 315 Dengan Metode Reliability Centered Maintenance II Berdasarkan Klasifikasi Konsekuensi Standar Norsok Z-008 Edition 3 2011. [Tugas Akhir]

Bima, Ibnu Utowo Rancang Bangun Panel Kontrol Motor Penggerak Dan Monitoring Sudut Buka Damper Force Draft Fan Boiler Takuma (Studi Kasus PG. Pesantren Baru). [Tugas Akhir]

Bima, Yoga Prasetya Pengaruh Musculoskeletal Disorder dan Kelelahan Kerja Terhadap Stress Kerja Pada Karyawan Production Drawing di Perusahaan Konsultan Desain Kapal. [Tugas Akhir]

Bimarum, Laksamana Agung Analisa Potensi Kebocoran Akibat Pengaruh Erosi dan Water Hammer Terhadap Line 04/SW-BES/04-003 Sea Water Cooling System. [Tugas Akhir]

Bramastra, Banuboro Desain Jalur Pipeline Freshwater dari Pumproom Menuju ke Jetty (Studi Kasus PT. Siam Maspion Terminal). [Tugas Akhir]

Bunga, Dhea thalia Pririenfandu Optimalisasi Penggunaan Obstacle pada Jalur Keluar dengan Simulasi Evakuasi Berbasis Multi-Agent. [Tugas Akhir]

Cahyaning, Wulan Dhadhari Penilaian Postur Pekerja Produksi Herbisida dan Penentuan Waktu Istirahat Menggunakan Metode OCRA Index. [Tugas Akhir]

Candra, Jaya Sistem Monitoring dan Kontrol Breaker pada Emergency Station PLTU Pacitan Berbasis Internet of Things (IoT). [Tugas Akhir]

Chollid, Fadillah Rancang Bangun Sistem Monitoring Suhu Uap Dan Kontrol Valve Pada Separator Boiler Berbasis Arduino (Studi Kasus PG.Pesantren Baru-Kediri). [Tugas Akhir]

Christien, Adeliasavitri Analisa Kerusakan Bollard Pada Kapal TB.Bhayangkara. [Tugas Akhir]

Christien, Adeliasavitri Analisa Kerusakan Bollard Pada Kapal TB.Bhayangkara. [Tugas Akhir]

Citra, Dwi Kusumawardani Identifikasi Bahaya Pembuatan Kapal Fiberglass Menggunakan Metode Job Safety Analysi (JSA) dan Penentuan Solusi Alternatif Menggunakan Benefit Cost Analysis (BCA) (Studi Kasus : Perusahaan Galangan Kapal). [Tugas Akhir]

Citra, Firdausi Nuzula Pendekatan Metode Partial Least Square dalam Analisa Faktor yang Memengaruhi Kinerja dari Tinjauan Stres Kerja, Konflik Kerja, dan Kepuasan Kerja. [Tugas Akhir]

DANAR, BAYU FIRNANDA ANALISA PENGGUNAAN WATERJET PADA SISTEM PROPULSI KAPAL CATAMARAN 18 M DI PT. ORELA SHIPYARD. [Tugas Akhir]

DEAN, MUSA P S ANALISA MODEL ESTIMASI (REGRESI LINIER SEDERHANA) UNTUK KEBUTUHAN CAT LAMBUNG KAPAL. [Tugas Akhir]

DESSY, NURWAHYUNI STUDI UNJUK KERJA HEAT RECOVERY STEAM GENERATOR UNIT-201 (STUDI KASUS PADA UNIT POWER GENERATOR DI PT. TRANS PACIFIC PETROCHEMICAL INDOTAMA). [Tugas Akhir]

DHIMAS, AGUNG NUGROHO ANALISA KETERLAMBATAN PEMBANGUNAN KAPAL LANDING CRAFT UTILITY 1500 DWT PADA PROSES HULL CONTRUCTION DI PT. DAYA RADAR UTAMA UNIT LAMONGAN. [Tugas Akhir]

DZULFANI, AKMAL AZIZI ANALISA PENGARUH TEKANAN RATA-RATA KOMPRESI SEBELUM DAN SESUDAH OVERHAUL PADA MESIN CATERPILLAR 3512. [Tugas Akhir]

Daisykarenas, Siwi Pengukuran Tingkat Ketidaksesuaian Ketebalan Dinding Galon (Jugs) Melalui Pendekatan Statistical Process Control (SPC). [Tugas Akhir]

Dana, Hartono Purwarupa Sistem Penjejak Matahari Dilengkapi Reflektor Menggunakan Kendali PID (Studi Kasus : Penerapan untuk Konsumen Listrik dengan Kebutuhan Daya 900VA Non-Subsidi. [Tugas Akhir]

Danang, Ardianto Analisa dan Desain Ulang Penempatan Support Pipa Ammonia Line Suction Pump P-0301 A/B/C Pabrik 1A PT. Pupuk Kaltim. [Tugas Akhir]

Danang, Arif Setiawan Analisis Pengaruh Backing Plate Dengan Variasi Arus Pada Material Pengelasan Aluminium 5083 Terhadap Kuat Tarik, Nilai Kekerasan Dan Struktur Mikro. [Tugas Akhir]

Daniel, Cheriyawan Tua Ompusunggu Analisis Kelayakan Horizontal Directional Drilling (HDD) Melewati TAXI WAY 2 Pada Project PT. WIJAYA KARYA. [Tugas Akhir]

Daniel, Dwi Pemiadinugroho DESAIN SPEED BOAT 15 METER BERBAHAN DASAR HIGH DENSITY POLYETHILENE (HDPE) SEBAGAI SARANA PATROLI TNI AL. [Tugas Akhir]

Daniel, Febri Kurniawan Perancangan Alat Monitoring Komponen Kritis Mesin Tunnel Kiln Berbasis Mikrokontroller. [Tugas Akhir]

Danis, Bagus Setiawan Sistem Prediksi Arah Tendangan Lawan Pada Robot Penjaga Gawang Sepak Bola Beroda Menggunakan Trigonometry Technique dan Metode Multilayer Perceptron. [Tugas Akhir]

Danny, Arief Wiratama Hartono Analisa Variabel-Variabel yang Mempengaruhi Kinerja dan Loyalitas Karyawan Perusahaan Galangan Reparasi Kapal PT. Najatim Dockyard. [Tugas Akhir]

Dara, Puspitasari Penggunaan Lidah Buaya dan Biji Kelor sebagai Biokoagulan di Industri Minyak. [Tugas Akhir]

Darwis, Ardiantoro Ilham Rancang Bangun Auto Buck - Boost Converter Pada Prototype Pembangkit Listrik Pico Hidro Dengan Metode PID. [Tugas Akhir]

Daryansyah, Rusydi Analisa Tegangan Dan Kelelahan Akibat Pengaruh Vortex Induced Vibration (VIV) Yang Terjadi Pada Lokasi Crossing 18” LP Production Pipeline PS3MP01 to PS3C. [Tugas Akhir]

David, Fandi Rianto Rancang Bangun Konveyor Pendeteksi Berat Semen PPC Pada Packer Tuban 2 PT. Semen Indonesia. [Tugas Akhir]

David, Ramadhan Sistem Pemantauan dan Pengendalian Prototipe Greenhouse Menggunakan Metode ANFIS Berbasis Internet of Things. [Tugas Akhir]

Dea, Riadi Putri Panjaitan Analisis Sociotechnical System dan Personal Characteristic pada Kecelakaan Kerja Menggunakan Structural Equation Modeling (SEM) di Industri Pengolahan Minyak Sawit. [Tugas Akhir]

Dean, Wily Nuari Perancangan Sistem Ventilasi di Area Foundry Untuk Mengurangi Paparan Partikulat Dalam Proses Sand Casting Pada Perusahaan Manufaktur. [Tugas Akhir]

Dear, Orty Arnanda Analisis Variasi Jumlah Layer Pada Proses Overlay Material SA-516 Gr70 Proses Pengelasan SMAW Terhadap Metallography , Chemical Test , Hardnest dan Laju Korosi. [Tugas Akhir]

Debri, Hasbi Fathoni Rancang Bangun Sistem Smart CCTV untuk Efektivitas Energi Berbasis YOLO CNN dan Android<i/> di Laboratorium Otomasi PPNS. [Tugas Akhir]

Deby, Surya Maharani Identifikasi Penyebab Gangguan Motor AC dengan Kopling Eddy Current pada Cane Feeding Carrier di Pabrik Gula. [Tugas Akhir]

Dedy, Mochamad Lubif Rancang Bangun Smart Softstater untuk Pengasutan Motor Induksi Tiga Phasa. [Tugas Akhir]

Defvi, Ambarwati Rancang Bangun Panel Kontrol Otomatis Fire Sprinkler System (Kapal Perintis 2000 GT). [Tugas Akhir]

Dekrit, Frahmadia Ahmad Rancang Bangun Sistem Kontrol Kecepatan Motor Mesin Crusher Berbasis Mikrokontroler dan Inverter (di PT. Mitramulia Makmur). [Tugas Akhir]

Della, Mahdalina Pengaruh Penambahan Laju Udara Terhadap Activated Sludge Di Sanitary Wastewater Treatment Plant (SWTP) PT. Paiton Operation and Maintenance Indonesia (POMI). [Tugas Akhir]

Delvi, Kusuma Fibia Rindika Identifikasi Bahaya Menggunakan ETBA dan Penentuan Probabilitas dengan FTA pada Unit Ammonia Proses I Pabrik I Perusahaan Pupuk. [Tugas Akhir]

Dendy, Dwi Prasetyo Klasifikasi Cacat Pada Kemasan Botol Dengan Menggunakan Metode Ekstraksi Gray Level Co-Occurrance Matrix (GLCM) Dan Support Vector Machine (SVM). [Tugas Akhir]

Dendy, Dwi Prasetyo Klasifikasi Cacat Pada Kemasan Botol Dengan Menggunakan Metode Ekstraksi Gray Level Co-Occurrance Matrix (GLCM) Dan Support Vector Machine (SVM). [Tugas Akhir]

Denia, Intan Purnama Sari Perencanaan Sistem Pendingin dan Pengkondisian Udara pada Kapal Tugboat. [Tugas Akhir]

Derryan, Naufal Hagi Penyusunan Rencana Manajemen Keselamatan Lalu Lintas (Studi Kasus: Proyek Tol - Pandaan - Malang). [Tugas Akhir]

Desi, Ayu Rahmawati Analisis Kecelakaan Pada Pekerjaan Maintenance Menggunakan Human Factor Analysis and Clasification System dan Why di Perusahaan Pengerollan Baja. [Tugas Akhir]

Desrid, Iskandar Pratama Perancangan Ruang Pengering Ikan Memanfaatkan Panas Kondensor Fish Storage. [Tugas Akhir]

Desy, Ocktaviana Putri ANALISIS PENAMBAHAN PUSH FENDER PADA HALUAN KAPAL TB. GLORIA 15. [Tugas Akhir]

Devi Asmawati, Tety Pengendalian Progres Waktu Dan Biaya Dengan Metode Earned Value Pada Proyek Pembangunan Kapal Tunda 2x1000 Hp. [Tugas Akhir]

Devianti, Kusuma Hardinata Analisis Nilai Efektivitas pada Mesin Gas Cutting Koike Sanso Kogyo Type IK 2000 CE HI-82 dengan Metode Overall Equipment Effectiveness (OEE) pada Perusahaan Manufaktur Transportasi. [Tugas Akhir]

Dewi, Ekawati Analisis Kerusakan dan Perbaikan Motor Direct Current di Mesin Cane Elevator Stasiun Gilingan di Pabrik Gula. [Tugas Akhir]

Dewi, Kusuma Indira Perancangan Sistem Informasi Inspeksi Apar Berbasis Android dan Web Serta Analisa Perbandingan Keuntungan dengan Metode Bca (Studi Kasus : Perusahaan Jasa Perawatan Tower Dan Genset). [Tugas Akhir]

Dewi, Suci Nawangwulan Pengaruh Kelelahan Kerja dan Stres Kerja Terhadap Kinerja Surveyor dan Inspektor di Perusahaan Jasa Sertifikasi. [Tugas Akhir]

Dewi, Susanti Analisa Penilaian Human Error Probability Dalam Proses Grinding di Perusahaan Fabrikasi Boiler Menggunakan Metode SLIM-AHP. [Tugas Akhir]

Dewi, Wardah ANALISA PERBANDINGAN BERAT KONSTRUKSI ALUMINIUM PADA RUANG AKOMODASI KAPAL HYDROGRAPHIC SURVEY GEOLOGIC & GEOPHYSICAL BERDASARKAN RULE NK DAN BK. [Tugas Akhir]

Dhanang, Bagus Kuncoro Perbandingan Inhibitor NaNO3 dengan K2CrO4 pada Material Stainless Steel 316L terhadap Laju Korosi Fluida Sulfuric Acid PT. Petrokimia Gresik. [Tugas Akhir]

Dharu, Fadillansyah Putra Optimasi Parameter Proses Injection Molding Terhadap Produk Pot Cream 10 gram Menggunakan Metode Response Surface. [Tugas Akhir]

Dhiaulhaq, Ages Fitra Madya Analisa Penilaian Risiko Kebakaran dan Perancangan Proteksi Kebakaran di Bagasse House (Studi Kasus Industri Gula). [Tugas Akhir]

Dhinar, Ryan Viguna Modifikasi Panel Kontrol Motor Flame Scanner dan Air Cooling System di PLTU. [Tugas Akhir]

Dhitya, Agil Harnowo Pengaruh Beban Gerakan Sloshing Pada Dinding Tangki Ruang Muat Kapal Tanker 17500 DWT. [Tugas Akhir]

Dia, Sagita Putri Analisis Risiko pada Pekerjaan Rutin dan Non Rutin Menggunakan Metode HIRADC dan FTA pada Unit Sidafur Perusahaan Penghasil Pestisida. [Tugas Akhir]

Dian, Kurnia Sandi Analisis Perbandingan Filler CuP 279, CuP 284 dan Ag 134 pada Proses Torch Brazing Copper to Brass Terhadap Sifat Mekanis, Struktur Mikro, dan Estimasi Biaya. [Tugas Akhir]

Dica, Dewanti Perbandingan Analisa Ekonomi Pembangunan Kapal FRP ( Fiberglass Reinforced Plastics ) Berbahan Serat Gelas WR-CSM dengan Multiaxial di PT. Samudra Sinar Abadi Shipyard. [Tugas Akhir]

Dicko, Chavelnicov Abdidinnillah Rahadiono DESAIN INTERIOR DEK 6 KM. CIREMAI DENGAN KONSEP INTERIOR MODERN UNTUK MENINGKATAKAN KENYAMANAN PENGGUNA. [Tugas Akhir]

Dicky, Danutirta Sucipto Studi Perbandingan Bollard Pull Test Menggunakan Metode Guilermo Gefael dan P Zahalka Terhadap Hasil Bollar Pull Test KT. Sei Deli. [Tugas Akhir]

Difanda, Pandu Putra Suryono Optimasi Penjadwalan Docking KN Prajapati dengan Metode CPM dan Non Linear Programming (Studi Kasus di Galangan Kapal). [Tugas Akhir]

Dika, Kurniawan Analisis Pengelasan Besi Cor Kelabu Fc20 mn dengan Variasi Preheat Terhadap Lebar Haz, Penetrant, Metallography dan Hardness pada Mantel Gilingan PG.Asem Bagus. [Tugas Akhir]

Diki, Hadi Pratama Desain dan Analisis Bejana Tekan Untuk Drum Kondensat. [Tugas Akhir]

Dikky, Ardiansyah Analisa Variasi Buffer Layer Pada Pengelasan Hardfacing Overlay Terhadap Struktur Makro, Mikro, Dan Nilai Kekerasan. [Tugas Akhir]

Diky, Abdullah Perancangan Ulang Proteksi Kebakaran Berdasarkan NFPA 1 dan Pengaturan Penyimpanan Ampas Tebu di Gudang Pabrik Gula. [Tugas Akhir]

Dimas, Desmonda Pragama Pengaruh Media Pendingin Dan Komposisi Zat Pengaktif Karbon Terhadap Struktur Mikro, Case Depth, Dan Nilai Kekerasan Pada Proses Pack Carburizing Material SA-516 Gr.70. [Tugas Akhir]

Dimas, Dwi Kurniawan Identifikaai Bahaya pada Biological Sulphur Recovery Unit dengan ETBA dan FTA (Studi Kasus : Perusahaan Minyak dan Gas). [Tugas Akhir]

Dimas, Prahanega Putra Analisa Perbandingan Lifetime Bearing Secara Teori Dan Aktual Pada Pompa Sentrifugal GA-502 Di Produksi Urea 1B PT. Petrokimia Gresik. [Tugas Akhir]

Dina, Fitriastuti Analisis Penambahan Panjang Floating Dock 3000 TLC untuk Meningkatkan Kapasitas TLC di PT. Adiluhung Sarana Segara Indonesia. [Tugas Akhir]

Dinda, Aksari Desain dan Analisa Press Tool Front Plate 3TP038 menggunakan Software CAD/CAE pada Perusahaan Manufaktur Loudspeaker. [Tugas Akhir]

Dinda, Ayu Dwi Cahyaning Putri Analisis Penambahan Sistem Pembuangan Pada Kapal Pembersih Sampah Di Perkotaan. [Tugas Akhir]

Dinda, Sang Dyah Palupi Analisis Teknis dan Ekonomis Penggantian Sistem Pelumasan Minyak Menjadi Pelumasan Air pada Reparasi Stern Tube TB. Bomas Gold. [Tugas Akhir]

Dinni, Bangkit Nurrizki Klasifikasi Pengukuran Level Gas Pada Proses Pembuatan MSG dengan Menggunakan Neural Network. [Tugas Akhir]

Dio, Rizky Ardhya Abiyoga Pemesanan Parkir Online dengan Menggunakan Sistem Scada dan Realtime Database dengan Mqtt. [Tugas Akhir]

Dipta, Aditya Syahputra ANALISA KEKUATAN KONSTRUKSI DOUBLE BOTTOM H-381, KAPAL KONTAINER 100 TEUS DENGAN VARIASI TAMBAHAN PROFIL U DAN PROFIL H. [Tugas Akhir]

Dita, Pratiwi Hammamdani Monitoring Penggunaan Daya Semu Secara Real-Time pada Gedung Perkantoran. [Tugas Akhir]

Dita, Widya Susanti Analisis Bahaya Listrik Pada Panel MDP Dan Transformator 1600kVA Serta Perencanaan Job Safety Planning Berdasarkan NFPA 70E 2018. [Tugas Akhir]

Dodik, Wahyu Nugroho Prototype Pengendalian Suhu dan Kadar Gas SO2 pada Sulphur Burner Berbasis Mikrokokontroler dengan Menggunakan Metode Fuzzy Logic di Unit Pemurnian Pabrik Gula Ngadiredjo. [Tugas Akhir]

Dody, Istivan Analisis Gangguan Proteksi pada Motor Dryer di Unit Phonska II Menggunakan SEPAM M40 (Studi Kasus PT. Petrokimia Gresik). [Tugas Akhir]

Dona, Febriananta Rancang Bangun Jig Pencekam Besi Round Bar , Pipa, Square Bar dan Siku pada Band Sawing Machine. [Tugas Akhir]

Drinin Kawasugi, Regiyan Optimalisasi Maintenance Head Truck untuk Meningkatkan Avalaibility dan Reliability di PT Terminal Petikemas Surabaya. [Tugas Akhir]

Dwi, Ari Setiawan Prototipe Panel Monitoring Dan Controlling Sistem Berbasis Web Pada Rumah Pompa. [Tugas Akhir]

Dwi, Ariyanto Pengaruh Temperbead Welding (TBW) untuk menggantikan PWHT Pada Material SA 335 P22 Terhadap Sifat Mekanik dan Struktur Mikro. [Tugas Akhir]

Dwi, Dianita Martiningrum Idetifikasi Bahaya Kebocoran dan Mapping Dispersi Amonia di Lingkungan Kerja Perusahaan Pupuk dan Bahan Kimia. [Tugas Akhir]

Dwi, Sanusi Perancangan Ulang Fasilitas Penyimpanan dan Penanganan Bahan Kimia Pada Departemen Logistik & Pembelian Perusahaan Industri Perhiasan Emas. [Tugas Akhir]

Dwi Cahyo, Ryandito Analisis Pengendalian Persediaan Suku Cadang Head Truck Dengan Metode Economic Order Quantity (Studi Kasus PT.Terminal Petikemas Surabaya). [Tugas Akhir]

Dwiki, Yanuar Ramadhan Perancangan dan Pembuatan Kursi Pengukuran Anthropometri Menggunakan Metode Quality Function Deployment di Institusi Pendidikan. [Tugas Akhir]

Dwiky, Bagus Saputra Prototype Sistem Kontrol Dan Monitoring Supply Water Pada Steam Drum Boiler Untuk Generator Menggunakan Metode Fuzzy Logic Di Perusahaan Pupuk. [Tugas Akhir]

Dyah, Mardiana Rancang Bangun Pengendalian Sistem Ballast Kapal Menggunakan Metode Exterme Learning Machine. [Tugas Akhir]

Dyan, Afrizal Noer ESTIMASI KEBUTUHAN MATERIAL DAN JAM ORANG DALAM PEMBANGUNAN BLOK 2B KAPAL TUGBOAT 16 METER. [Tugas Akhir]

Dynar, Riski Amalia Perancangan Ulang Instalasi Pengolahan Air Limbah (IPAL) Dipo Lokomotif pada Kegiatan Perawatan Kereta Api. [Tugas Akhir]

Dzikri, Insan Kamil Evaluasi Kegagalan Pressure Control Valve (PCV) Pada Line 8-GZ-654-5205-F9E-100A. [Tugas Akhir]

Efrilda, Furnariandika Pembuatan Sistem Informasi Reminder Sertifikasi Peralatan Dan Instrumen K3 Berbasis Website Pada Perusahaan Pembangkit. [Tugas Akhir]

Ega, Sepfriansyah Avianto Studi Numerik Pergerakan Pig Melalui Equal Tee pada Operasi Pigging. [Tugas Akhir]

Egata, Dwi Veptiyan Delignifikasi Selulosa Daun Nanas (Ananas cosmosus) Dan Jerami (Oryza sativa) Sebagai Adsorben Logam Berat Cu. [Tugas Akhir]

Egi, Sepfriansyah Avianto Optimasi Proteksi Korosi Pipeline pada Metode Kombinasi SACP- ICCP Melalui Penyebaran Tegangan Elektrokimia dan Aspek Cost Rate. [Tugas Akhir]

Eka, Aprilia Damayanti Analisis Laju Korosi dan Lifetime Pipa Underground Baja Karbon A53 dengan Wrapping Protection. [Tugas Akhir]

Eka, Ayu Ariesta Analisis Penyebab Kecelakaan Kerja Dengan Menggunakan Metode FTA Dan Human Factors Analysis And Classification System (HFACS). [Tugas Akhir]

Eka, Nia Ayulestari Analisis Pengaruh Praktik Keselamatan dan Kesehatan Kerja terhadap Kinerja Pekerja Kontraktor Pembangkit Listrik Tenaga Uap dengan Menggunakan Metode Partial Least Square (PLS). [Tugas Akhir]

Eka, Wahyu Aditya Implementasi Sistem Pengenalan Wajah Sebagai Media Akses Restricted Room di Perusahaan Dengan Metode Histogram Equalization dan Fisherface. [Tugas Akhir]

Eko, Budi Prasetyo Analisis Media Pendinginan PWHT pada Pengelasan Alumunium 6061 dengan Proses GTAW terhadap Pembuatan Kurva DAC dan Nilai Kekerasan. [Tugas Akhir]

Eko, Cahyono INSPEKSI KERETAKAN PADA POROS ROLL GILINGAN DENGAN METODE MAGNETIC PARTICLE TEST DAN ULTRASONIC TEST DI PT. BARATA INDONESIA. [Tugas Akhir]

Eko, Heru Prasetyo Rancang Bangun Automatic Thread Burning pada Proses Produksi di Perusahaan Alas Kaki Berbasis Mikrokontroler Arduino. [Tugas Akhir]

Eko, Nur Rizki Widiyanto PERENCANAAN MESIN PENARIK TALI UNTUK LAUNCHING KAPAL 25 TON DI PERUSAHAAN KAPAL FIBERGLASS (Studi Kasus di PT. Samudera Sinar Abadi). [Tugas Akhir]

Eko, Nur Rizki Widiyanto Perencanaan Mesin Penarik Tali Untuk Launching Kapal 25 Ton Di Perusahaan Kapal Fiberglass. [Tugas Akhir]

Eko, Saifudin Rancang Bangun PWM Konverter Buck Boost Pada Panel Surya. [Tugas Akhir]

Eksan, Wijaya Penilaian dan Perencanaan Total Productive Maintenance (TPM) dan Root Cause Failure Analysis (RCFA) pada Coal Conveyor System (Studi Kasus Perusahaan Pembangkit Listrik Tenaga Uap). [Tugas Akhir]

Elen, Rosita Reschedule Pembangunan Kapal Kelas I Kenavigasian (KN. BACAN) di Orela Shipyard dengan Metode PERT dan Linier Programing. [Tugas Akhir]

Elha, Novaldy Adam Sifat Flexural dari Balok High-Strength Concrete : Analisis Metode Elemen Hingga dan Pengujian Eksperimen. [Tugas Akhir]

Elok, Ilhamagda Kusti Hajaningsih Perencanaan Gudang Penyimpanan Bahan Kimia pada GD01 Perusahaan Manufaktur Alutsista. [Tugas Akhir]

Elsa, Febriana Devi Analisa Pengaruh Sociotechnical Variable, Safe Work Behaviour dan Faktor Individu terhadap Kecelakaan di Perusahaan Terminal Peti Kemas. [Tugas Akhir]

Elvira, Carisma Devi Identifikasi Bahaya Terhadap Pembongkaran dan Pemasangan Reactor Vessel pada Perusahaan Penghasil Bahan Pestisida. [Tugas Akhir]

Emerald, Edo Pradana Asmono Studi LOPA (Layer Of Protection Analysis) Pada Evaporation Process Perusahaan Bioethanol. [Tugas Akhir]

Emy, Suciati Analisis Risiko Ledakan dan Kebakaran pada Primary Reformer sebagai Unit Penyedia Gas Sintesa di Perusahaan Penghasil Pupuk. [Tugas Akhir]

Endah, Dwi Safitri Rancang Bangun Buffer NMEA 0183 Sebagai Perangkat Pendukung GPS Navigator GP-39. [Tugas Akhir]

Endang, Sugiarti Optimasi Waktu Dan Biaya Proyek Supply Fabrication Esp Platform Dan Stairway Tanjung Jati B Unit 5 (Mhps) Dengan Metode Cpm (Critical Path Method)<i/>. [Tugas Akhir]

Erce, Pradika Mauliana Sortir Asphalt Drum Pada PT. Pertamina – BPG dengan Ekstraksi Fitur Menggunakan Gray Level Co-occurrence Matrix (GLCM). [Tugas Akhir]

Erdhisa, Tysani Nurliana Analisa Risiko Operasional pada Departemen Logistik dengan Metode Analytical Hierarchy Process PT. Petrokimia Gresik. [Tugas Akhir]

Erdiana, Zukhrotun Nufus Optimalisasi Abort Time untuk Mencegah False Alarm pada Fire Suppression System Menggunakan Pendekatan Linear Programmin (Studi Kasus : Control Building). [Tugas Akhir]

Erdyansyah, Adinata Perbandingan PWHT Variasi Holding Time dengan Temper Bead Welding Pada Material SM490A Hasil Pengelasan GMAW Terhadap Sifat Mekanik dan Struktur Mikro. [Tugas Akhir]

Erham, Kurnia Implementasi Sistem Standalone Scada pada Storage Process Menggunakan Protokol Komunikasi Profibus Dan Fasilitas Colour Tresholding. [Tugas Akhir]

Erik, Alfitra Candra DESAIN STERN DOOR DENGAN MENGGUNAKAN SISTEM HIDROLIK PADA KAPAL PATROLI 80 M. [Tugas Akhir]

Erlangga, Pandu Bramastya Analisa Perbandingan Jam Orang dan Material Pada Proses Pembangunan Kapal Penumpang Dinas Perhubungan Kabupaten Jayapura dan Dinas Perhubungan Kabupaten Pesisir Barat. [Tugas Akhir]

Erlina, Kusumawati Analisis Kekuatan terhadap Rencana Struktur Penyangga Helideck pada Perusahaan Galangan Kapal di Batam. [Tugas Akhir]

Erma, Khoirun Nisa’ ANALISIS PERUBAHAN STABILITAS KAPAL AKIBAT PENAMBAHAN CRANE KONTAINER PADA KM X. [Tugas Akhir]

Ervita, Rahma Budiyarti Analisa Pengaruh Unsur Terhadap High Manganese Steel Menggunakan Metode Regresi Linier Berganda. [Tugas Akhir]

Eunike, Endah Wulandari Efisiensi Biaya dan Waktu Penjadwalan Proyek melalui Pendekatan Critical Path Method (Studi Kasus Pembuatan dan Pemasangan 1 Unit Standart Gilingan IV). [Tugas Akhir]

Eva, Nur Mudzalifah Analisa Kepuasan Pelanggan Pada Pekerjaan Reparasi Kapal Dengan Metode Importance Performance Analysis Dan Quality Function Deployment Di PT. Najatim. [Tugas Akhir]

Eva, Nur Mudzalifah Analisa Kepuasan Pelanggan Pada Pekerjaan Reparasi Kapal Dengan Metode Importance Performance Analysis Dan Quality Function Deployment Di PT. Najatim. [Tugas Akhir] (Unpublished)

Evie, Aisyah Arum ANALISA PROJECT SCHEDULE DAN LABOR COST ESTIMATE AKIBAT MISALIGNMENT HOPPER PADA BLOK KAPAL TANKER. [Tugas Akhir]

Evy, Nilasari ANALISA PENCEGAHAN DEFORMASI AKIBAT PROSES PENGELASAN. [Tugas Akhir]

FAHRULLAH, NUZULUL AMIR REPOWERING MESIN INDUK PADA KAPAL PERANG DI PT. PAL INDONESIA. [Tugas Akhir]

FEBRI, ARDI KUSUMA DESAIN SISTEM BALLAST PADA KAPAL KONTAINER 100 TEUS. [Tugas Akhir]

FIRMAN, NUROHMANDE SARDI DESAIN SISTEM PEMINDAHAN AIR PADA TABUNG SHIP LIFT 10T. [Tugas Akhir]

FU’AD, AJI DHARMA ANALISA PENGARUH GELCOAT TERHADAP REMBASAN AIR PADA MATERIAL FIBERGLASS. [Tugas Akhir]

Fachrina, Zieyan Wardhani Analisa Pengaruh Pemodelan Type Groundbed Terhadap Efisiensi Desain Impressed Current Cathodic Protection. [Tugas Akhir]

Fadhil, Setiawan Analisa Pengaruh Penambahan Inhibitor Kalsium Karbonat dan Ektrak Daun Teh (Camellia Sinensis) pada Fluida Tryethylene Glycol terhadap Laju Korosi Material Nozzle A106 Grade B. [Tugas Akhir]

Fadil, Widiyanto PERANCANGAN SISTEM PENGKONDISIAN UDARA POWER HOUSE MENGGUNAKAN METODE PERHITUNGAN BEBAN PENDINGINAN CLTD (COOLING LOAD TEMPERATURE DIFFERENCE) DI PT. OPSICO SEMARANG. [Tugas Akhir]

Fadila, Faiza Tsani Sistem Perawatan Adaptif Budidaya Bonsai Beringin Dengan Teknologi Internet of Thing (IoT) dan Image Processing. [Tugas Akhir]

Fadlur, Rahman Kajian Eksperimen Pengaruh Perubahan Sudut Stagger Terhadap Kinerja Turbin Air Tipe Savonius Dengan Myring n = 1. [Tugas Akhir]

Fahmi, Idris Arif Analisis Perubahan Fungsi Tongkang 150 Ft Menjadi Floating Dock di PT. Adiluhung Saranasegara Indonesia. [Tugas Akhir]

Fahmi, Nur Muhammad Analisis Pengendalian Risiko Kegagalan Pada Turbine dan Compressor Ammonia Unit dengan Metode Failure Mode Effect Analysis (FMEA) dan Fault Tree Analysis (FTA). [Tugas Akhir]

Fahrizal, Surya Sukmana Rancang Bangun ATS dan AMF Berbasis Mikrokontroler Menggunakan Protokol Komunikasi Modbus Remote Terminal Unit (RTU). [Tugas Akhir]

Fairuuz, Budi Sasmito Identifikasi Bahaya pada Distribusi Natural Gas Unit BRF dengan Metode HAZOP Analysis dan Penentuan Solusi Alternatif Menggunakan BCA di Perusahaan Peleburan Baja. [Tugas Akhir]

Fairuza, Awalu Rahmat Analisis Pengelasan Repair Menggunakan Filler Metal ER 309L Dan ER 309MoL Pada Sambungan Las Material SA-335 Gr P11 Yang Telah Mengalami Proses Repair Terhadap Sifat Mekanik Dan Struktur Mikro. [Tugas Akhir]

Faisal, Hadi Prototype Sistem Distribusi Tenaga Listrik Menggunakan Redundant System. [Tugas Akhir]

Faisal, Renaldi STUDY PENGARUH WELDING SEQUENCE TERHADAP TERJADINYA CACAT PADA PENGELASAN GMAW UNTUK MATERIAL Al 5083. [Tugas Akhir]

Faisal, Rohman Basthomi Implementasi Sistem Presensi RFID dengan Validasi Deteksi Wajah Menggunakan Metode Viola-Jones dan Local Binary Pattern Histogram Berbasis Mini PC. [Tugas Akhir]

Faizal, Akhmadan STUDI PERFORMANSI MESIN PENDINGIN MULTI FUNGSI SEBAGAI FISH STORAGE DAN FISH DRYER. [Tugas Akhir]

Fajar, Anugrah Prototype Monitoring Penyusutan Bahan Bakar Genset Berbasis Internet of Things. [Tugas Akhir]

Fajar, Dewantoro Sistem Estimasi Output Daya Pada Photovoltaic (PV) Berdasarkan Kondisi Cuaca Dengan Metode Neural Network. [Tugas Akhir]

Fajar, Roro Egi Pangesti ANALISA PERBANDINGAN BERAT KONSTRUKSI LAMBUNG KAPAL PATROLI 15.5 METER BERBAHAN DASAR HIGHT DENSITY POLYETHILENE (HDPE) DAN FIBERGLASS REINFORCED PLASTIC (FRP). [Tugas Akhir]

Fakhri, Hermadigi Diyantama Analisa Perhitungan Optimum Thickness , MAWP, Tegangan, dan Lifetime pada Gas Dryer dengan Material SA 516M Gr. 70 pada Proyek SPBG (Stasiun Pengisian Bahan Bakar Gas). [Tugas Akhir]

Fandi, Achmad Rancang Bangun Prototipe Pembangkit Listrik Tenaga Surya dengan Fasilitas Smart Auto Switch (SAS) Berbasis Fuzzy Logic dan Artificial Neural Network. [Tugas Akhir]

Fani, Luqman Azis Aanalisa Perbandingan Kebutuhan Material Kapal Frp Pada Kapal Class Dan Kapal Non Class Di Cv. Javaneses Boat Indonesia. [Tugas Akhir]

Fanza, Fachryan Erdiansyah Teknik Identifikasi Menggunakan Metode Hirarc dan Ahp pada Pekerjaan&nbsp; Shortlength di Industri Manufaktur Bar Mill. [Tugas Akhir]

Faradilla, Astika Niftiani Analisis Penilaian Risiko pada Jalur Pipa pada Main Steam Line Menuju Demister (Studi Kasus: Pembangkit Listrik Tenaga Panas Bumi). [Tugas Akhir]

Fardhanyansah, Wibowo Pengaruh Kelembaban, Kekasaran dan Suhu Terhadap Kualitas Bonding Rubber to Metal. [Tugas Akhir]

Farid, Wahyudin Rancang Bangun Automatic Switch Pada Hybrid Power Plant Picohydro Dan Photovoltaic Berbasis Mikrokontroler. [Tugas Akhir]

Farid, Widiansyah Perancangan Ruang Pendingin Ikan Pada Mesin Pendingin Multi Fungsi Sebagai Fish Storage Dan Fish Dryer. [Tugas Akhir]

Farida, Nurlaily Perhitungan Risiko Postur Kerja Pada Proses Pengelasan Dan Gerinda Tahap Finishing Produk Side Frame. [Tugas Akhir]

Farihal, Muafi Perbandingan Laju Korosi Material Pipa CuNi dengan Steel galvanis pada Sea Water Cooling System kapal Patrol 152. [Tugas Akhir]

Farihatul, Jannah Perancangan dan Pembuatan Sistem Pengereman Pada Mobil Minimalis Roda Tiga. [Tugas Akhir]

Fariz, Akbar Analisis Perhitungan Manual dan Simulasi Tegangan pada Overhead Crane Double Girder dengan Safety Working Load 10 Ton. [Tugas Akhir]

Fariz, Basyiruddin Pemanfaatan Saccharomyces cerevisiae dari Limbah Hasil Samping Fermentasi Bir sebagai Biosorben untuk Mengurangi Kadar Cu. [Tugas Akhir]

Fattah, Jati Pangestu Redesain Shell And Tube Heat Exchanger Menggunakan Software Htri Xchanger Suite 6.0, Pv Elite 2015 Dan Analisa Tegangan Menggunakan Metode Elemen Hingga. [Tugas Akhir]

Fauridzal, Syarifudin Fahmi Analisis Variasi Flow Rate Shielding Gas Pada Pengelasan ATIG Aluminium 6061 Terhadap Kekerasan, Struktur Makro dan Mikro. [Tugas Akhir]

Fauzan, Ariq Santoso Desain Filter Harmonik Sebagai Upaya Peningkatan Kualitas Daya Listrik Pada Industri Baterai Otomotif. [Tugas Akhir]

Fauzy, Mahayu Firdaus Putra Rancang Bangun Sistem Monitoring Arus Eksitasi pada Brush Generator Berbasis Mikrokontroler dan SMS Gateway di PT. PJB UP Gresik. [Tugas Akhir]

Faza, Ulinnuha Penerapan Six Sigma Untuk Pengendalian Kualitas Produksi Di Industri Packaging. [Tugas Akhir]

Febdiean, Rendra Harianto Analisis Pengaruh Frekuensi Rendah Terhadap Motor Konveyor di Unit Phonska 4 PT. Petrokimia Gresik. [Tugas Akhir]

Febi, Oktafiharto Komparasi Efektivitas Karbon Aktif Pabrikan, Karbon Aktif Tempurung Kelapa dan Karbon Aktif Kayu Mahoni terhadap Penurunan Nilai BOD, TSS dan Turbidity. [Tugas Akhir]

Febriyan, Dwi Hartarto Rancang Bangun Monitoring Dan Kontrol Pertumbuhan Tanaman Pada Sistem Hidroponik DFT Menggunakan Metode Fuzzy Logic. [Tugas Akhir]

Febriyanti, Prastika Rahmadhani Analisa Kecelakaan Pada Pekerjaan Loading Unloading Menggunakan Metode Fishbone Diagram dan Systematic Cause Analysis Technicue. [Tugas Akhir]

Feiby, Safiti Parera Identifikasi Bahaya dan Perancangan Gudang Minyak Pelumas di Dipo Lokomotif. [Tugas Akhir]

Ferry, Arya Nugraha Rancang Bangun Sistem Kontrol Dan Monitoring Drop Pressure Supply Udara Pada Mesin Printing 16 K8000 Berbasis Mikrokontroler (Studi Kasus Di PT Mitra Mulia Makmur). [Tugas Akhir]

Feru, Insan Putrama Ramadhan Rancang Bangun Auto Adjustment Buck Boost Converter Menggunakan Metode PID. [Tugas Akhir]

Fikri, Imam Rahman Rancang Bangun Sistem Pengendali Lengan Robot Berbasis Neurosky Mindwave Headset menggunakan Metode Neural Network(NN). [Tugas Akhir]

Firda, Maulidania Analisis Pengaruh Tekanan Panas dan Faktor Individu Terhadap Heat Strain pada Pekerja Ladle Refining Furnace di Perusahaan Peleburan Baja. [Tugas Akhir]

Firda, Puspitasari Pengaruh Kebocoran Arus Akibat Sentuh Rebar Chamber Pada Pipa Yang Diproteksi Katodik Terhadap Kebutuhan Arus ICCP. [Tugas Akhir]

Firda, Tisna Izdihar Analisis Kecelakaan Sambaran Petir Menggunakan Metode Fault Tree Analysis Untuk Perancangan Sistem Proteksi Petir Eksternal Dan Internal Pada Perusahaan Fabrikasi Boiler. [Tugas Akhir]

Firman, Bagas Prakoso Analisis Re-Spot Welding Sebagai Metode Repair Hasil Pengelasan Resistance Spot Welding Pada Material Stainless Steel SUS 304 Terhadap Tegangan Geser Dan Metallography Di PT.INKA. [Tugas Akhir]

First, Garuda Aridandy Al Achyar Perancangan Ballast Water Treatment System pada kapal tanker. [Tugas Akhir]

Firza, Putra Aryatama Pengawasan Jumlah Barang Elektronik Berdasarkan Klasifikasi Video Processing Dengan Metode YOLO- Convolutional Neural Network. [Tugas Akhir]

Fita, Tri Lestari Perhitungan Corrosion Rate dan Analisis Risiko Kebocoran Storage Tank Asam Sulfat di WasteWater Treatment Plant PLTU. [Tugas Akhir]

Fitri, Puspa Aryanti Analisis Kekuatan Kontruksi Sideboard Pada Stanchion Dengan Profil H-Beam Sebagai Pengganti Profil L. [Tugas Akhir]

Fitri, Wahyuningtyas Analisis Faktor - Faktor Yang Mempengaruhi Kinerja Karyawan Dengan Menggunakan Kepuasaan Kerja Sebagai Variabel Intervening (Studi Kasus Pada Pt.Tambangan Raya Permai). [Tugas Akhir]

Fitroh, Sumarno Kurniawan Rancang Bangun Mesin Pencuci Galon PET Otomatis. [Tugas Akhir]

Fredy, Iswayudi Analisa Pengaruh Fouling Growth Rate Terhadap Unjuk Kerja Heat Exchanger Shell And Tube E302B Area 300 Di Industri Oli Pasuruan. [Tugas Akhir]

Fredy, Iswayudi Analisa Pengaruh Fouling Growth Rate Terhadap Unjuk Kerja Heat Exchanger Shell And Tube E302B Area 300 Di Industri Oli Pasuruan. [Tugas Akhir]

Fredyo, Dwi Sanjaya Analisis Penggunaan Filler Metal TGX 308L Dan TGF 316L Sebagai Pengganti Filler Metal ER 308L Dengan Pengelasan GTAW Terhadap Sifat Mekanik Dan Struktur Mikro. [Tugas Akhir]

Frick, Ihya Alif Fanani STUDI KELAYAKAN ALAT TANGKAP SAMPAH DI JALUR NELAYAN SEDATI. [Tugas Akhir]

Friska, Heninda Rahmadini Analisa Kinerja Loading Rate Inbag dengan Meminimalkan Waste Menggunakan Metode FMEA dan RCA di PT. Petrokimia Gresik. [Tugas Akhir]

Friska, Hielvitiana Kurniasyari Analisis Kecelakaan Pada Pekerjaan Ketinggian Menggunakan Metode ECFA, Fishbone dan Pareto Analysis di Perusahaan Rokok. [Tugas Akhir]

Fuad, Firmansyah HIRARC, FTA, dan BCA pada Proses Erection Tower Crane di Perusahaan Konstruksi Proyek Pembangunan Apartemen dan Mall. [Tugas Akhir]

GALUH, MULYADIANSAH STUDI PERHITUNGAN PEMBANGKIT LISTRIK DENGAN MEMANFAATKAN ENERGI HASIL PEMBAKARAN OFF GAS. [Tugas Akhir]

Gading, Samudro Wicaksono Analisis Penggunaan Spot MIG Welding Sebagai Alternatif Pengganti RSW Terhadap Kekuatan Geser dan Struktur Metalografy. [Tugas Akhir]

Galih, Inggrit Winarto Pengaruh Laju Korosi Erosi Terhadap Lifetime Material Carbon Steel A53, Stainless Steel 304, dan Stainless Steel 316 pada Aliran Weighed Juice Return Pipe di PT. Industri Gula Glenmore Banyuwangi. [Tugas Akhir]

Galih, Permana Santoso Putro Perancangan Dan Pembuatan Sistem Monitoring Automatic Material Conveying Berbasis Mikrokontroler (Studi Kasus Di PT Mitra Mulia Makmur). [Tugas Akhir]

Galih, Pranayudha Analisis Arc Flash Berdasarkan NFPA 70E Serta Monitoring Real Time Berbasis WEB Pada Panel Listrik di Laboratorium PPNS. [Tugas Akhir]

Galih, Rakasiwi Analisis Kecelakaan Kerja Dengan Metode Why Because Analysis Dan Tier Analysis Di Perusahaan Karoseri. [Tugas Akhir]

Gamal, Armando Analisis Bahaya Cold Storage menggunakan Metode Failure Mode and Effect Analysis dan Bowtie Analysis. [Tugas Akhir]

Gandhika, Nugraha Bekti Analisa Risiko Produksi Budidaya Udang Vannaamei dengan Metode Z-Score dan Value at Risk pada UD. Berkah Rabbul Izzati. [Tugas Akhir]

Gatra, Rendra Diki Permana Pengaruh Pembagian Anoda Terhadap Laju Korosi Dan Lifetime Material API 5l X65m Psl Pada Pipa Underground. [Tugas Akhir]

Gede, Suantara Darma EVALUASI NUMERIK KINERJA CONDENSER PLTU UNIT 8 DI PT. POMI PAITON. [Tugas Akhir]

Ghaniy, Firmansyah Desain Enclosure Turbine Generator Menggunakan Modular Panel pada Stasiun Listrik Industri Gula. [Tugas Akhir]

Gilang, Ilham Ramadhan Rancang Bangun Sistem Backup Unit Cooling Water Pump Sebagai Pendingin Torch TIG Welding menggunakan PLC dan HMI. [Tugas Akhir]

Gilang, Prilian Arinata Optimasi Deteksi Bola dan Gawang pada Robot Sepak Bola Beroda Menggunakan Region-Based Segmentation dan Robust Algorithm. [Tugas Akhir]

Gita, Arsy Jayanti Analisis Teknis dan Ekonomis Sistem Proteksi Katodik Anoda Tumbal dan Proteksi Katodik Arus Paksa pada Underground Gas Pipeline di Perusahaan Eksplorasi dan Pengolahan Gas Bumi. [Tugas Akhir]

Gita, Asrudin Firmansyah Identifikasi Bahaya Sistem Peluncuran dan Pengangkatan Sekoci Jenis Gravity Davit dengan Metode FMEA dan FTA. [Tugas Akhir]

Gladiol, Queen Danatama Analisis Risiko Keluhan Muskuloskeletal di Bagian Packing Perusahaan Semen. [Tugas Akhir]

Grismartanto, Putra Nugraha Analisis Heater Surface Temperature dan Welding Time pada Pengelasan Pipa Hdpe Pe 100 dengan Butt Fusion Dilihat dari Kuat Tarik dan Weld Bead. [Tugas Akhir]

HIMA, HERDI PRABOWO PERENCANAAN PENEMPATAN FIX BOLLARD PADA GRAVING DOCK PT. TAMBANGAN RAYA PERMAI. [Tugas Akhir]

Habibah, Farhani Desain Penambahan Jalur Perpipaan Tie-in Point Akibat Penambahan Deliquidizer. [Tugas Akhir]

Hadyan, Putra Pratama Analisa Efisiensi Isentropik Turbin Uap Pada Pembangkit Listrik Tenaga Uap (PLTU) Di Power House PT Perkebunan Nusantara X PG Ngadirejo Kediri. [Tugas Akhir]

Hafid, Mardiansyah Penyempurnaan Rancangan Sistem Kemudi Pada Kapal ROPAX 300 GT Dengan Electrohydraulic Servo Actuators. [Tugas Akhir]

Hafidh, Agung Santoso Perancangan dan Pembuatan Kincir Air Type Overshot Sebagai Pembangkit Listrik Tenaga Mikrohidro. [Tugas Akhir]

Hafiidha, Intan Meilani Identifikasi Bahaya pada Unit Chiller di Industri Pengolahan Minyak Sawit Menggunakan Metode HAZOP dan CCA. [Tugas Akhir]

Haliza, Rachmadita Adelina Analisa Produktivitas pada Inspeksi Kapal di PT. Mitraartha Gema Pratiwi. [Tugas Akhir]

Hananto, Aji Prabowo Rancang Bangun Sistem Monitoring Suhu dan Tekanan Exhaust Gas Mesin Penggerak Kapal pada KRI DR. Sohearso Berbasis Mikrokontroler. [Tugas Akhir]

Hanif, Dzaky Rindaputra Perancangan Alat Bantu Handling dan Assembling untuk Reparasi Vertical Corebox di PT AT Indonesia. [Tugas Akhir]

Hanif, Ramadhan Estimasi dan Prediksi Sudut Tendangan Lawan pada Robot Penjaga Gawang Sepak Bola Beroda dengan menggunakan Metode Neural Network. [Tugas Akhir]

Hanifah Fauziyyah, Aristi Rancang Bangun Dua Sistem Untuk Vakum Dan Kompresi Dalam Satu Alat Yang Digunakan Untuk Vacuum Infusion Pada Proses Laminasi Kapal Fiber. [Tugas Akhir]

Hanik, Indah Khafidyana Identifikasi Bahaya pada Compressor 103J dengan Menggunakan Metode FMECA dan ETA (Studi Kasus : Perusahaan Pupuk dan Bahan Kimia). [Tugas Akhir]

Happy, Syamsiar Rohmatul Ummah Manajemen Risiko Pekerjaan Pembersihan Conus Silo Gandum dengan Metode HIRADC (Studi Kasus: Perusahaan Penghasil Tepung). [Tugas Akhir]

Haris, Abdullah Mughni Analisa Waktu Dan Biaya Pengerjaan Sistem Ballast Pada Kapal Rumah Sakit Dengan Metode Critical Path Method (CPM). [Tugas Akhir]

Haris, Yoga Pangestu Desain dan Pemodelan Storage Tank Kapasitas 40.000 kL Menggunakan Software Integraph Tank. [Tugas Akhir]

Hasna, Shintia Putri Evaluasi serta Perancangan Aplikasi Emergency Response Plan (ERP) dan Sistem Proteksi Kebakaran Aktif pada Perusahaan Fabrikasi Boiler Berbasis Android. [Tugas Akhir]

Havis, Amirrudin Implementasi Metode Linear Discriminant Analysis (LDA) Dan Naïve Bayes Probability (NBP) Pada Prototype Sistem Pendeteksi Kecacatan Kemasan Botol Minuman. [Tugas Akhir]

Hawwin, Musyafah Pengaruh Kebakaran Kapal Bermuatan Solar Dengan Waktu Pembakaran Berbeda Ditinjau Dari Sifat Mekanik, Struktur Mikro Dan Kekerasan. [Tugas Akhir]

Helmi, Alfian Andrianto Identifikasi Bahaya pada HP-Separator dengan Metode FMECA dan FTA (Studi Kasus: Perusahaan Minyak dan Gas). [Tugas Akhir]

Helmy, Setyawan ANALISA PERHITUNGAN BERAT KONSTRUKSI PADA KAPAL ALUMINIUM PATROL BOAT 12.2 METER. [Tugas Akhir]

Hendita, Sukma Darmawan Analisa Laju Korosi Pada Stud Flange Terhadap Fluida H2SO4 Pada Material Stainless Steel 304 Yang Telah Dilakukan Proses Weld Overlay Di Utilits PT. Petrokimia Gresik. [Tugas Akhir]

Heni, Eva Ariyanti Analisis Pengaruh Safety Culture terhadap Safety Behavior Pekerja di Perusahaan Kemasan. [Tugas Akhir]

Herfian, Handrioka Fenomena Underpricing dan Kinerja Saham Perusahaan IPO Sektor Infrastruktur, Utilitas, dan Transportasi di Bursa Efek Indonesia Periode 2010-2018. [Tugas Akhir]

Herlian, Bagus Septian Sistem Pengenalan Plat Nomer dengan Menggunakan Metode Optical Character Recognition untuk Meningkatkan Keamanan. [Tugas Akhir]

Herman, Maulana HS. Perhitungan Kekuatan Dek Floating Dock Akibat dari Penambahan Panjang Floating Dock di PT. Adi Luhung Sarana Segara Indonesia. [Tugas Akhir]

Heryanto, C. Silitonga Analisa Pengaruh Penggunaan Liquid Starter Pada Motor Blower 3800 KW Di Unit Sulphuric Acid Di PT. Petro Jordan Abadi Gresik. [Tugas Akhir]

Himawan, Shofie Al Akrim Analisa Kebutuhan Cairan Penetrant Metode Brushing Terhadap Posisi Pengujian dan Sensitivitas Artificial Defect. [Tugas Akhir]

Himawan, Shofie Al Akrim Analisa Kebutuhan Cairan Penetrant Metode Brushing Terhadap Posisi Pengujian dan Sensitivitas Artificial Defect. [Tugas Akhir]

Hisyam, Syafiq Almughni Ahmad Rancang Bangun Pengendalian Lampu Ruang pada Kereta Eksekutif K1 2017 Berbasis Mosfet (Studi Kasus di PT.INKA). [Tugas Akhir]

Husni, Dhiyanul Haq Desain Sistem Perpipaan Di Area Pasang Surut Air Laut Untuk Mencegah Terjadinya Potensi Buckling. [Tugas Akhir]

Husnina, Nur Marjani Redesign Stasiun Kerja Dengan Pertimbangan Faktor Ergonomi Pada Workshop Plat Sambung (Studi Kasus Perusahaan Manufaktur Pembuat Beton). [Tugas Akhir]

IMRON, CAHYA RAMADHAN MODIFIKASI PERANCANGAN LINE GREASING PADA BEARING TAIL PULLEY COAL FEEDER. [Tugas Akhir]

INDRA, FERDIANSYAH BIMANTARA ANALISA KEBUTUHAN JAM ORANG PEMBANGUNAN KAPAL PERINTIS 2000 GT DALAM HULL BLOCK CONSTRUCTION. [Tugas Akhir]

IRVAN, BUDIANTORO ANALISA PREDIKSI KECEPATAN KAPAL KORVET MALAHAYATI SETELAH REPOWERING. [Tugas Akhir]

Ian, Denis Heru Bachtiar Pengaruh Variasi Preheating Dan Elektroda Pada Pengelasan Dissimilar A36 Dengan Hardox 400 Terhadap Nilai Kekerasan, Uji Bending Dan Struktur Mikro. [Tugas Akhir]

Ibnu, Abdil Aziz Pengaruh Hibrid Resin Dengan Variasi Susunan Mat Dan Woven Roving Terhadap Ketahanan Korosi Pada Fluida Asam Phospat Dan Kekuatan Tarik. [Tugas Akhir]

Ibnu, Fitra Mubarakh Analisa Suplai Udara pada Kamar Mesin Landing Craft Utility (LCU). [Tugas Akhir]

Ifadatul, Muyassaroh Analisis Faulty Behavior Risk Dengan Metode Fuzzy Analytical Hierarchy Proses (FAHP) Di Perusahaan Manufaktur. [Tugas Akhir]

Ifnabilla, Rachma Dewi Analisis Pengaruh Pasang Surut Air Laut Terhadap Operasional Pengedokan Kapal Perang TNI – Angkatan Laut di Fasharkan Surabaya. [Tugas Akhir]

Ihda 'asyara Ghifary, asyara Ghifary Pengaruh Jumlah Support pada Crossing Pipeline yang Mengalami Settlement. [Tugas Akhir]

Ihsanudin, - Perancangan Buried Pipeline Fuel Hydrant System dari DPPU ke Terminal Kargo Bandara International di Jakarta. [Tugas Akhir]

Ikanita, Kusuma Wardhani Perbandingan Konstruksi Melintang Dan Konstruksi Memanjang Terhadap Berat Kapal Cepat Rudal (KCR) 60 M. [Tugas Akhir]

Ikka, Widyasari Evaluasi Teknis dan Pemodelan Pola Sebaran NO2 Pada Cerobong PT. PJB UP Gresik. [Tugas Akhir]

Ilham, Khoirur Rizqi STUDI KELAYAKAN KOMPRESOR INGRESOLD RAND 7100 SETELAH DILAKUKAN PERBAIKAN. [Tugas Akhir]

Ilham, Ramadhitya Pribadi Pemetaan Korosi pada Unit Pemurnian Defekasi di PT. Industri Gula Glenmore, Banyuwangi. [Tugas Akhir]

Ilham, Waskito Studi Perencanaan Instalasi Listrik di Kapal Pesiar. [Tugas Akhir]

Ilham, Wicaksono Analisis Perbandingan Nilai Kekerasan, Struktur Mikro dan Estimasi Biaya Antara Proses Pengelasan SMAW, GMAW dan FCAW Pada Metode Build Up Misdrilled Hole. [Tugas Akhir]

Ilmi Riski Wahyuni, Nur Pengaruh Pelatihan, Kompetensi dan Lingkungan Kerja terhadap Kinerja Karyawan PT Pelindo Marine Service. [Tugas Akhir]

Imam, Cahyo Septiawan Analisis Gangguan Sistem Starting Motor Listrik Pada Stasiun Low Grade Fugal ( Studi Kasus Pada Industri Gula). [Tugas Akhir]

Imam, Rojali ANALISA KEMAMPUAN THRUST DAN KECEPATAN KAPAL BERDASARKAN VARIASI DIAMETER PROPELLER MENGGUNAKAN METODE CFD PADA KAPAL PERINTIS 1200 GT. [Tugas Akhir]

Imam, Waskito Jati Pengaruh Karateristik Individu dan Sikap Kerja terhadap Kelelahan dan Stres Kerja ATC di Bandara. [Tugas Akhir]

Imroatus, Solihah Analisis Bahaya Listrik Berdasarkan SNI PUIL 2011 dan Infrared Thermography Test pada Panel Distribusi di Area Produksi 1 Perusahaan Manufakturing Kemasan Plastik. [Tugas Akhir]

Indra, Ariyanto Nur Pamungkas Rancang Bangun Hydrogen Sulphide Alert System Sebagai Alat Proteksi Paparan Konsentrasi Gas Hidrogen Sulfida pada Perusahaan di Bidang Minyak dan Gas. [Tugas Akhir]

Indra, Budianto Analisa Perbandingan Jam Orang dan Kebutuhan Material Lining Ceiling Antara Perencanaan dengan Realisasi Pada Kapal Perintis 2000 GT. [Tugas Akhir]

Indy, Satya Hanggara Pendeteksian Sampah Perairan Secara Otomatis dengan Menggunakan Metode Convulution Neural Network (CNN). [Tugas Akhir]

Inggit, Novita Putri Redesign Tata Letak Fasilitas Produksi Gear Sebagai Upaya Pengendalian Over Transportation. [Tugas Akhir]

Inneke, Rizma Amalia Penilaian Risiko Kebakaran Serta Evaluasi Sistem Proteksi Kebakaran Aktif (Studi Kasus: Fabrications and Shipbuilding Service Company Bagian DKP). [Tugas Akhir]

Intan, Maharani Analisis Driver Behavior pada Pengendara Internal Truck Vihicle dengan Menggunakan Driver Behavior Questionnaire. [Tugas Akhir]

Intan, Rahmahwati Pengaruh Defleksi Span Bridge terhadap Tegangan Pipeline CY2 pada Overhead River Crossing. [Tugas Akhir]

Iqbal, Fajar Alfarizi PERHITUNGAN KEBUTUHAN PELAT, JAM ORANG DAN BIAYA PROSES REPLATING LAMBUNG KAPAL PENUMPANG. [Tugas Akhir]

Ira, Anggraeni Penentuan Critical Waste pada Produksi Camshaft menuju Lean Manufacturing Process. [Tugas Akhir]

Irawan, Buana Putra Identifikasi Bahaya Menggunakan Metode ETBA dan FTA pada Proses Distilation. [Tugas Akhir]

Irfan, Farisyandi ANALISA STABILITAS AKIBAT PENAMBAHAN RAMPDOOR PADA KMP. TONGKOL. [Tugas Akhir]

Irfan, Kristiawan Rancang Bangun Sistem Monitoring dan Pengendalian Ambient Temperature dan Kelembaban Udara Ruang Transformator Berbasis IoT di CUCB PT.POMI. [Tugas Akhir]

Irfan, Kristiawan Rancang Bangun Sistem Monitoring dan Pengendalian Ambient Temperature dan Kelembaban Udara Ruang Transformator Berbasis IoT di CUCB PT.POMI. [Tugas Akhir]

Irfan, Marzuqi Implementasi Path Planning Algorithm Pada Kinematika Gerak Robot Sepak Bola Beroda. [Tugas Akhir]

Irfan, Rudi Mahendra Analisis Aplikasi Solution Treatment pada Hasil Pengelasan Multiple Repair Stainless Steel SA 240 TP 316 Terhadap Sifat Mekanik, Struktur Mikro dan Laju Korosi. [Tugas Akhir]

Irgiyoga, Aditya Mahendra Evaluasi Pemakaian Jenis Pintu Kedap Pada Ruang Akomodasi Kapal Tanker. [Tugas Akhir]

Irsyadu, Maulana Perancangan Sistem Penutupan Valve Tangki Bahan Bakar Otomatis Berbasis PLC di Kapal S127. [Tugas Akhir]

Ismi, Syariffi Nadiar Putri Analisis Perhitungan OEE dan Six Big Losses terhadap Coal Boiler Perusahaan Penghasil Minyak Goreng. [Tugas Akhir]

Isnaeni, Nurjanah Identifikasi Bahaya Hydrogen Plant dan Proses Filling Hydrogen ke Generator pada Pembangkit Listrik Tenaga Uap dengan Metode HAZOP dan ETA. [Tugas Akhir]

Isro’in, Badriyah KAJIAN PERBANDINGAN EKONOMIS PEMBANGUNAN KAPAL PATROLI 15M BERBAHAN DASAR HIGH DENSITY POLYETHILENE (HDPE) DAN FIBERGLASS REINFORCED PLASTIC (FRP). [Tugas Akhir]

Istina, Nisa' Adzini Bioremediasi Limbah Sludge Minyak Bumi dengan Bakteri Pseudomonas aeruginosa dan Serbuk Gergaji sebagai Bulking Agent. [Tugas Akhir]

Isyfi, Qulubana ANALISA PERUBAHAN BERAT DAN NILAI KG AKIBAT PERUBAHAN MATERIAL KONSTRUKSI BAGUNAN ATAS KAPAL PENELITIAN HYDROGRAPHIC SURVEY GEOLOGIC & GEOPHYSICAL. [Tugas Akhir]

Itsna, Arsyiyatul Fahma Rancang Bangun Sistem Kontrol Tekanan Udara pada Kompresor Berbasis Mikrokontroler di PT. Mitra Mulia Makmur. [Tugas Akhir]

Ivan, Tio Fandana ANALISIS KEKUATAN KONSTRUKSI CORRUGATED BULKHEAD DENGAN LOWER STOOL PADA KAPAL TANKER 17500 DWT MENGGUNAKAN METODE ELEMEN HINGGA. [Tugas Akhir]

Iwan, Febrianto ANALISA TEKNIS JADWAL PEMBANGUNAN HULL CONSTRUCTION KAPAL CARGO RO-PAX 500 GT DI PT. ADILUHUNG SARANA SEGARA INDONESIA MENGGUNAKAN METODE PERT. [Tugas Akhir]

Iwan, Kurnia Putra ANALISA MODEL GETARAN MAIN ENGINE PADA KAPAL. [Tugas Akhir]

Izzuddien, Hadidullah Perancangan Dan Pembuatan Desain Gating System Pada Produk Pulley Dengan Proses Pengecoran Logam Sand Casting. [Tugas Akhir]

Jaddung, Maulana Marwaditama Pengaruh Media Pendingin Spot Welding Terhadap Tegangan Geser, Metallography Dan Laju Korosi Pada Material Ferritic Stainless Steel DIN 1.4003. [Tugas Akhir]

Jadug, Priambodo DESAIN ULANG POMPA FLUSHING PADA SISTEM FUEL OIL DI PT. PAL INDONESIA (PERSERO). [Tugas Akhir]

Jala, Artha Akbar Kelana ANALISA UNJUK KERJA PROPELLER TYPE MAU PADA KAPAL PERINTIS 2000 GT DENGAN VARIASI SUDUT SKEW DAN SUDUT RAKE MENGGUNAKAN METODE CFD. [Tugas Akhir]

Jami'atul, Hikmah Studi Pengurangan Gas CO2 dan Potensi Pembentukan Biomassa dari Emisi PLTU Batubara dengan menggunakan Mikroalga Botryococcus braunii. [Tugas Akhir]

Jenny, Rosha Susanti Analisa Kebutuhan dan Perancangan Sistem Informasi Manajemen Alat Pelindung Diri (APD) pada Perusahaan Pelayaran. [Tugas Akhir]

Jepri, Yanto Tuloli Analisa Perbandingan Biaya Pada Pembangunan Lambung Kapal Ambulance Berdasarkan Perencanaan Dan Realita. [Tugas Akhir]

Jhonatan, T Siagian Design Kapal Penyeberangan Pada Daerah Danau Toba Dari Monohull Menjadi Twinhull. [Tugas Akhir]

Jihan, Octa Mediza Identifikasi Bahaya Pekerjaan Loading-Unloading Atau Lifting Pada saat Bad Weather Di Perusahaan Industri Jasa. [Tugas Akhir]

Joko, Aji Saputro Rancang Bangun Sistem Distribusi Waktu Dinamis Dan Deteksi Pelanggaran Pada Traffic Light Menggunakan Pengolahan Citra Dan Metode Fuzzy Logic. [Tugas Akhir]

Joko, Wartono Analisa Pengaruh Metode Repair dan Multiple Repair Material Sa-283 Gr.C terhadap Struktur Mikro, Nilai Ketangguhan, dan Nilai Kekerasan. [Tugas Akhir]

Jordan, Syah Gustav Pengendalian Persediaan Alat Pelindung Diri Dengan Metode EOQ Yang Berbasis Web. [Tugas Akhir]

Juannanda, Kresna Akbar Pengaruh Lingkungan Kerja dan Karakteristik Individu Terhadap Produktivitas Kerja pada Departemen Steel Making di Industri Peleburan Baja. [Tugas Akhir]

Julio, Oscar Rasmanjaya Analisa Risiko Menggunakan FMEA dan Bow-tie pada Rubber Tired Gantry di Perusahaan Jasa Petikemas. [Tugas Akhir]

Juma'iyah, - Modifikasi Desain Frame Bogie Kereta Bangladesh Type WJC Akibat Beban Aksial dengan Material S355J2 N. [Tugas Akhir]

Jumali, - Pembuatan HIRARC dan Sistem Informasi Manajemen Work Permit Berbasis Web dan Android (Studi Kasus di Politeknik Perkapalan Negeri Surabaya). [Tugas Akhir]

Jupri, Riyanto Analisa Tegangan Pada Critical Line Pipa Penyalur Paraxylene Line No 24”-P-248031-A2A2-HC75. [Tugas Akhir]

KHOLIFATUL, HANIF GUMILANG ANALISA PERBANDINGAN UNJUK KERJA HEAT EXCHANGER E-302 A AREA 300 DI PT ALP INDUSTRI SEBELUM DAN SESUDAH PROSES CLEANING. [Tugas Akhir]

KORNELIUS, GIAN FEBRYTAMA ANALISA DAYA MAIN ENGINE MaK 6M20C PADA KAPAL KN. BIMASAKTI UTAMA SETELAH BEROPERASI 10 TAHUN. [Tugas Akhir]

Kartika Dimas, Guntur Evaluasi Kinerja Bongkar Muat di Terminal Peti Kemas Domestik Menggunakan Metode Importance Performance Analysis dan Quality Function Deployment. (Studi Kasus : PT. Berlian Jasa Terminal Indonesia). [Tugas Akhir]

Karunia, Eka Safitri Analisis Pengaruh Goal Orientation dan Organizational Learning Culture terhadap Career Satisfaction dan Organizational Commitment Berdasarkan Perspektif Gender. [Tugas Akhir]

Karyatiningsih, Ulfa Analisis dan Perancangan Sistem Informasi Manajemen Persediaan Barang pada Perusahaan Galangan Kapal (Studi Kasus di PT. Najatim Dockyard). [Tugas Akhir]

Kerin, Nova Dianti Analisa Risiko pada Pekerjaan Hot Working di Confined Space Menggunakan Metode HIRARC dan FTA di Industri Kapal. [Tugas Akhir]

Kevin, Satria Nugraha Desain Tangki External Floating Roof Penyimpanan Condensate Berdasarkan Api 650 Dan Diverifikasi Dengan Metode Elemen Hingga. [Tugas Akhir]

Kevin, Widiaksanu Putra Analisa Perubahan Kemudi Meletak Menjadi Kemudi Menggantung Pada Kapal LCU ADRI - L1 1500 Ton Ditinjau Dari Segi Konstruksi Buritan Kapal. [Tugas Akhir]

Keycko, Perdana Zalfa' Salsabila Analisis perbandingan pengelasan Double Side Arc Welding dengan Backweld untuk proses las GTAW pada material SA 240 tipe 304 terhadap laju korosi intergranular, struktur mikro dan kualitas hasil pengelasan. [Tugas Akhir]

Kezia, Grace Monica Identifikasi Bahaya pada Boiler dangan Menggunakan Metode FMEA dan Analisa Safety Barrier dengan Pendekatan Human Reliability Assesment (HRA). [Tugas Akhir]

Khafid, Azzarkhiyah Rancang Bangun Sistem Monitoring Dan Control Extrusion Process Pada Glycine Max Menggunakan Metode Fuzzy Logic. [Tugas Akhir]

Khairil, Wijanarko Analisis Faktor-Faktor yang Mempengaruhi Nilai Perusahaan pada Sektor Transportasi Laut. [Tugas Akhir]

Khairina, - REALTIME NOTIFICATION DAN SISTEM KEAMANAN PADA KENDARAAN BERMOTOR DENGAN KEAMANAN GANDA BERBASIS INTERNET OF THINGS. [Tugas Akhir]

Khairuddin, Khairuddin KAJIAN NUMERIK BACK FLOW CAMPURAN BATUBARA– AIR PERPIPAAN BA-300 PADA PYRITES HOPPER SYSTEM DI PLTU UNIT 8 PT. POMI PAITON. [Tugas Akhir]

Khairunnisa, Ghina Salsabila Identifikasi Bahaya Pekerjaan Perbaikan AeratorMenggunakan Metode HIRADC dan RCA (5-Why and Fishbone) (Studi Kasus:Perusahaan Lubricant Refinery). [Tugas Akhir]

Kharisma, Wahyu Lestari Pengurangan Waste pada Proses Produksi Gear Spindle dengan Pendekatan Lean Manufacturing di Industri Manufaktur Otomotif. [Tugas Akhir]

Kharismawan, Dwi Febrianto Pembuatan dan Pengujian paket Modular untuk Speed test Kapal pada tahap sea trial. [Tugas Akhir]

Khariza, Amalia Identifikasi Bahaya Kebakaran pada Mesin Hammer Mill di Perusahaan Pakan Ternak dengan Pendekatan Human Reliability Assessment (HRA) dan Keandalan Komponen. [Tugas Akhir]

Khoirul, Abror Analisis Risiko Pada Boiler Pabrik Pengolahan Tembakau Dengan Menggunakan Metode FMEA Dan Bow Tie Analysis. [Tugas Akhir]

Khoirul, Anam Analisa Kekuatan Material Straight Union (Studi Kasus Kebocoran Hydraulic Steering Gear System Kapal Coaster H-368 KM. Sabuk Nusantara 69). [Tugas Akhir]

Khoirun, Nasikhin Pemetaan Posisi Robot Sepak Bola Beroda Menggunakan Metode Gyrodometry Untuk Memprediksi Sudut Tendangan Bola Terhadap Gawang Lawan Dengan Perhitungan Trigonometri. [Tugas Akhir]

Khoirun, Nisa' Pengaruh Kebisingan, Iklim Kerja Dan Faktor Individu Pekerja Industri Pengecoran Logam Terhadap Kelelahan Kerja. [Tugas Akhir]

Kholiqul, Misbah Rancang Bangun Mesin Stapler Siku Kayu Fleksibel Dua Sisi Dengan Sistem Elektropneumatik Pada Perusahaan Manufaktur Mebel. [Tugas Akhir]

Khusnul, Mariatunnikmah Perancangan Rute Evakuasi Kebocoran Gas Hidrogen dan Gas N83 Menggunakan Algoritma Floyd-Warshall di Perusahaan Gas Industri. [Tugas Akhir]

Kinawih, Ainul Kamalia Perancangan Ulang Tata Letak Lantai Produksi PT BBI Pasuruan Dengan Metode Systematic Layout Planning. [Tugas Akhir]

Kresna, Zaenal Fanani PENGARUH TEKANAN INJEKTOR DAN TEMPERATUR BAHAN BAKAR MINYAK JELANTAH TERHADAP UNJUK KERJA MOTOR DIESEL 4 LANGKAH 1 SILINDER. [Tugas Akhir]

Kresna, Zaenal Fanani Pengaruh Tekanan Injektor dan Temperatur Bahan Bakar Minyak Jelantah Terhadap Unjuk Kerja Motor Diesel 4 Langkah 1 Silinder. [Tugas Akhir]

Kresno, Dani Kurniawan Analisa Pengaruh Mixtured Gas Pada Pengelasan GMAW Material SUS 304 Dengan SUS 201 Terhadap Sifat Mekanik, Struktur Makro Dan Mikro. [Tugas Akhir]

Kurniapril, Nur Ristanto Evaluasi Proyek Pembuatan dan Pemasangan Tangki pada PT. Boma Bisma Indra. [Tugas Akhir]

Kusuma, Ardhi Rahmawan Pemilihan Sistem Pengendali Buoyancy Force Pada Pipeline Dengan Pertimbangan Faktor Construction Methods. [Tugas Akhir]

LAZUARDI, PRANA ANANDA PERBANDINGAN EFISIENSI KEBUTUHAN DAN BIAYA PEMAKAIAN ANTARA ZINC ANODE DAN ALUMINIUM ANODE PADA SISTEM PROTEKSI KATODIK DI KAPAL. [Tugas Akhir]

Laela, Syaharotus Sabanah Analisis Kecelakaan HMC (Harbour Mobile Crane) dengan Metode HFACS (Human Factor Analysis and Classification System) (Studi Kasus : Perusahaan Bongkar Muat). [Tugas Akhir]

Lailatul, Afifah REDESIGN LAMBUNG KAPAL FERRY 500 GT DENGAN MEMBUAT VARIASI NILAI LCB. [Tugas Akhir]

Lailaturahmi., F Analisis Perbandingan Tahanan Pada Variasi Bulbous Bow Yang Diterapkan Pada Kapal Oil Tanker MT.Petro Ocean XVII. [Tugas Akhir]

Laili, Wahyuni Dinarsyah Analisa Teknis dan Ekonomis Redesain Ballast Piping Sistem on Floating Dock. [Tugas Akhir]

Laily, Izmia Rahmadini Analisis Kegagalan Main Blower Menggunakan Fault Tree Analisys (FTA) dan Evaluasi Proteksi petir Eksternal pada Area Blower House Perusahaan Pupuk. [Tugas Akhir]

Laksamana, Prihandika Pamungkas Pengaruh Sudut Bending Serrated Finned Tube Terhadap Karakteristik Perpindahan Panas pada Economizer Boiler Proyek Gresik Gas Cogeneration Plant (GGCP) PT Petrokimia Gresik. [Tugas Akhir]

Lambang, Bimantara Analisis Laju Pertumbuhan Biofouling Terhadap Pelapisan Lambung Kapal Kayu dengan Menggunakan Material Fiberglass Reinforced Plastic. [Tugas Akhir]

Lanang, Ilham Kelana Analisis Stabilitas Sinyal Antenna Furuno Inmarsat Mini C Mobile Earth Station Felcom 16 Pada Kapal Kargo. [Tugas Akhir]

Larisa, Rahma Diva Perancangan Aplikasi Pelaporan Unsafe Action dan Unsafe Condition Berbasis Android di Proyek Konstruksi. [Tugas Akhir]

Latof, Syeikhur Rabbani Analisa Risiko Penumpukan Barang Di Pelabuhan Selama Proses Pengiriman Muatan Jenis Wirerod Dengan Metode House Of Risk (HOR). [Tugas Akhir]

Laviati, Noor Hamida Perancangan Sistem Informasi Pendukung Pelaksanaan Checklist K3 pada Equipment Granulator (studi kasus : Perusahaan Produksi Pupuk). [Tugas Akhir]

Leonardo, Kharen Analisis Kecelakaan Kerja dengan Metode Event And Causal Factors Analysis (ECFA) dan Control Change Cause Analysis (3CA) Pada Perusahaan Produksi Karung. [Tugas Akhir]

Lilik, Khoiriyah Analisis Teknis dan Ekonomis Pemilihan Material Panel untuk Lining , Ceiling , dan Deck Covering Pada Kapal Landing Craft Utility (LCU) 1500 DWT. [Tugas Akhir]

Lina, Nur Fauziah Analisis Keandalan dan Ketersediaan Komponen Lokomotif Diesel Elektrik dengan Pendekatan RCM II (Studi Kasus di Dipo Lokomotif Sidotopo). [Tugas Akhir]

Lita, Finnysia Aprida Pemanfaatan Kandungan CaO Limbah karbit dan Kandungan Silika Abu Sekam Padi Sebagai Bahan Pembuatan Bata Beton Pejal. [Tugas Akhir]

Lud, Lailah Lu'lu'atul Luthfiyah Perancangan dan Pembuatan Sistem Handling Mobil Roda Tiga. [Tugas Akhir]

Luqman, Aji Ellathif Analisa Kemampuan Metode Magnetic Particle Inspection untuk Mendeteksi Subsurface Defect. [Tugas Akhir]

Luqman, Aji Ellathif Analisa Kemampuan Metode Magnetic Particle Inspection untuk Mendeteksi Subsurface Defect. [Tugas Akhir]

Lusi, Indah Mahardika Analisa Numerik Karakteristik Kinerja Heat Exchanger Tipe Shell And Helically Coiled Tube. [Tugas Akhir]

Lutfi, Imam Pambudi Rancang Bangun Sistem Monitoring Dan Automatic Changeover Terhadap Perubahan Temperature Motor Crusher Berbasis Internet Of Things (IoT). [Tugas Akhir]

Lutfi, Patimatul Fajri Analisis Kegagalan dan Penentuan Penjadwalan Perawatan Pencegahan pada Mesin Block Mill dengan Simulasi Monte Carlo di Perusahaan Peleburan Baja. [Tugas Akhir]

Lutfi, Prasetyo Utomo Analisa Kualitas Pelayanan Bongkar Muat Kapal PT. Dermaga Harapan Jaya Menggunakan Metode Servqual Dan Importance Performance Analysis (IPA). [Tugas Akhir]

Lutvi, Ade Septian Perhitungan Kapasitas Produksi dalam Penyusunan Master Production Schedule pada Divisi Manufacturing Mould Shop. [Tugas Akhir]

M, Hanif Zein Srg Analisa Perbandingan Hambatan Kapal Memakai dan Tidak Memakai Bulbous Bow Pada Kapal Perintis 1200 GT. [Tugas Akhir]

M., Auliya' Rakhman Analisa Penggunaan Elektroda E71T1-C1A2-CS1-H5 dan E71T1-C1A0-CS1-H8 Terhadap Tensile Test dan Impact Test. [Tugas Akhir]

M., Azhari Oktavianto Perancangan Konveyor KSP815 Pada Mesin Printing Berbasis PLC. [Tugas Akhir]

M., FAISHOL YUSUF AMIEN DESAIN ULANG KAPASITAS POMPA FIRE UNTUK MEMENUHI KEBUTUHAN FOAM MONITOR GUN FIRE FIGHTING SYSTEM PADA KAPAL LPD DI PT. PAL INDONESIA. [Tugas Akhir]

M., Jundy Auzan Fanony Perancangan Progressive Dies Pelat untuk Draft Mark Kapal. [Tugas Akhir]

M. Faiz, Fazlur Rahman Perancangan Jok Ergonomis Dalam Fabrikasi Mobil Minimalis Roda Tiga. [Tugas Akhir]

M. Haidar, Ali Yafie Kajian Numerik Infiltrasi Flue Gas pada Komponen Lance Tube Soot Blower Tipe PS-SL. [Tugas Akhir]

M. Iqbal, Nasrulloh Kajian Eksperimen Pengaruh Penambahan Silinder Sirkular Terhadap Kinerja Turbin Air Savonius Sumbu Vertikal (Studi Kasus Perubahan Jarak Kedua Silinder Sirkular Terhadap Tegak Lurus Arah Aliran). [Tugas Akhir]

M. Isanaini, Hidayatulloh Perancangan Rute Evakuasi Kebocoran Gas Sulfur Dioksida dengan Model Makroskopik di Industri Asam Fosfat. [Tugas Akhir]

M. Zarkasi, Manshur ANALISA KEKUATAN ANCHOR RACK DAN PENGARUHNYA TERHADAP KONSTRUKSI HALUAN KAPAL AKIBAT PENAMBAHAN OUTFITTING PADA KAPAL TONGKANG KGM 27. [Tugas Akhir]

M.arif, Sujana Sar Perancangan Dimensi Dan Tata Ruang Pada Ambulance Boat Rute P.Ra'as - Sumenep Madura Sesuai Aspek Ergonomi. [Tugas Akhir]

MOH., NURILFATUR APRILIANZAH PERHITUNGAN LAJU KOROSI UNTUK MENGESTIMASI JADWAL PENGGANTIAN PELAT PADA KAPAL KMP. JOKOTOLE. [Tugas Akhir]

MOHAMMAD, YANUAR HARIADI PERHITUNGAN KONTRUKSI DAN ESTIMASI MATERIAL PADA PROSES PENAMBAHAN SEA CHEST TB. RITA 108. [Tugas Akhir]

MOZA, HESTIANA ANALISA PENGARUH LAJU ALIRAN MASSA TERHADAP EFEKTIVITAS HEAT EXCHANGER E-301 B PEMISAH AIR PADA OLI BEKAS AREA 300 DI PT. ALP PETRO INDUSTRY. [Tugas Akhir]

MUHAMMAD, HASAN BASRI MODIFIKASI RANCANGAN INLET LINE EFFECT MED (MULTI EFFECT DESALINATION) UNTUK MENCEGAH PENYUMBATAN PADA NOZZLE EFFECT. [Tugas Akhir]

Ma'ruf, Firmansyah Pengearuh Kelembaban Flux Sebelum Pengelasan Pada Material Low Carbon Steel Ditinjau Dari Pengeujian Radiografi Test, Uji Kekerasan Dan Struktur Mikro Dengan Proses Pengelasan SAW. [Tugas Akhir]

Mahdi, Brahmanta Aji Rancang Bangun Sistem SCADA Web Multiplatform pada PLC untuk Temperature Controller dan Recorder. [Tugas Akhir]

Maizar, Rahmi Analisis Pengaruh Faktor Individu dan Lingkungan Kerja Terhadap Gangguan Photokeratitis pada Pengelasan FCAW (Studi Kasus: Perusahan Konstruksi di Manufaktur dan Fasilitas Minyak dan Gas Bumi). [Tugas Akhir]

Mar'atus, Sholihah Penggunaan IPAL Mini Dalam Menyisihkan Kandungan BOD, COD dan TSS Pada Limbah Cair Domestik (Studi Kasus: Asrama Mahasiswi Gebang Kidul, Surabaya). [Tugas Akhir]

Mardita, Ayuningtyas Analisis Safety Behavior pada Pekerja Kontraktor di PLTU dengan Metode Structural Equation Modelling (SEM). [Tugas Akhir]

Mariya, Kusuma Dewi Analisis Kegagalan Supply UPS (Uninterruptible Power Supply) Pada Unit Phonska III PT Petrokimia Gresik. [Tugas Akhir]

Marizta, Perdani Putri Desain By Pass Line dan Pig Launcher pada Gas Trunkline BS Kambitin II- BS III Tanjung, Proyek Adaro Wilayah Field Tanjung Kalimantan Selatan. [Tugas Akhir]

Marrinta, Nur Ekarina Perencanaan Traffic Safety dengan Standart ILO Code Of Practice On Safety And Health In Port dan OSHA Traffic Safety In Marine Terminal Pada Terminal Berlian Perusahaan Bongkar Muat Kapal. [Tugas Akhir]

Martiin, Ramadan Nur Amanu ANALISA PERBANDINGAN BIAYA PRODUKSI ANTARA PERENCANAAN DENGAN REALISASI DALAM PRODUKSI SPEED BOAT 6 M. [Tugas Akhir]

Mas, Bagas Eka Setyawan Estimasi Perhitungan Kebutuhan Materi, Biaya Replating Dan Kebutuhan Jam Orang Dalam Proses Reparasi Di PT Najatim (Studi Kasus KM. Cengkeh 02). [Tugas Akhir]

Masfiyah, Masfiyah ANALISA TEKNIS DAN EKONOMIS PERBANDINGAN PENGGUNAAN PROFIL U DENGAN PROFIL L PADA DOUBLE BOTTOM KAPAL KONTAINER 100 TEUS. [Tugas Akhir]

Masrifatul, Alifa Inspeksi Cacat Las dan Prosedur Repair Pada Stringer Proyek ESP Platform and Stairway Tanjung Jati Unit dengan menggunakan metode Liquid Penetrant Test. [Tugas Akhir]

Maulana, Hussin Achmad M Analisa Kekuatan Mekanik Bagian Lambung Kapal Ambulan Fiberglass Reinforced Plastic (FRP). [Tugas Akhir]

Maulana, Hussin Achmad M Analisa Kekuatan Mekanik Bagian Lambung Kapal Ambulan Fiberglass Reinforced Plastic (FRP). [Tugas Akhir]

Maulana, Isman Perancangan dan Pembuatan Sistem Kemudi Pada Lifeguard Boat. [Tugas Akhir]

Maulana, Riza Ardiansyah Perubahan Parameter Pengelasan pada Fabrikasi Atap Gerbong Kereta Eksekutif terhadap Total Distortion, Effective Stress dan Heat Distribution. [Tugas Akhir]

Maulana, Yoga Pradana Analisis Desain Kapal Pembersih Sungai Ditinjau dari Segi Praktis dan Ekonomis. [Tugas Akhir]

Maulida, Nur Hidayah Yusuf Perancangan Enclosure pada Mesin Vibrating Table dengan Variasi Bahan Peredam di Perusahaan Manufaktur Produksi Beton. [Tugas Akhir]

Maya, Dewi Puji Lestari Perancangan dan Pembuatan Prototype Sistem Inspeksi Alat Pelindung Diri Otomatis. [Tugas Akhir]

Maya, Hari Purnamasari SISTEM PENGATURAN KECEPATAN MOTOR PADA PROSES SORTIR MIE INSTAN MENGGUNAKAN ALGORITMA DECISION TREE C4.5 DENGAN VARIABEL JARAK DAN BERAT. [Tugas Akhir]

Maydita, Hesty Triwulandari Analisa Risiko Kebocoran pada Hydrogen Storage (Studi Kasus: Pembangkit Listrik Tenaga Uap). [Tugas Akhir]

Mega, Sidhi Nugrayanti Pengaruh Pemberian Dosis Trichloroisocyanuric Acid (TCCA) pada Bak Desinfeksi Terhadap Penurunan Kandungan Escherichia Coli di RSUD Dr. R. KOESMA TUBAN. [Tugas Akhir]

Meldina, Munawaroh STUDI PERBANDINGAN PERSENTASE CAT 2 KOMPONEN TERHADAP ADHESIVITAS DAN VOLUME SOLID. [Tugas Akhir]

Melindawati, Muchtar Perancangan Toilet DU – 3E Bagi Masyarakat Indonesia. [Tugas Akhir]

Merdiana, Nurul Khusaini Puteri Studi Perencanaan Turbin Angin Vertikal Savonius Sebagai Cadangan Supply DC Power Navigasi Kapal Perintis 2000 GT. [Tugas Akhir]

Merga, Baresi Laras Desain Ulang Sistem Perpipaan Distribusi Fluida Massecuite dari Reheater menuju Feed Mixer. [Tugas Akhir]

Merril, Leilani Pratiwi Evaluasi Biaya dan Waktu Penjadwalan Menggunakan Pendekatan Earned Value Method (Studi Kasus Proyek Flue Trestle and Frame ). [Tugas Akhir]

Miftachul, Jannah Umza Rifa'i Pengaruh Proses Reforming pada Sambungan Resistance Spot Welding Material SUS 201 dan SUS 304 Terhadap Struktur Mikro, Laju Korosi dan Nilai Kekerasan. [Tugas Akhir]

Miftah, Ahsanul Anhar Optimasi Parameter Proses Blow Moulding Terhadap Ketebalan Dan Dimensi Snap Pada Botol Dengan Metode Taguchi Grey Relational Analysis. [Tugas Akhir]

Miftah, Alif Azmi Pengaruh Diameter Orifice Terhadap Laju Erosi Pada Sistem Gas Metering PT. TIP. [Tugas Akhir]

Mila, Ariefiani Analisis Probabilitas Human Error pada Pekerjaan Grinding dengan Metode Fuzzy HEART. [Tugas Akhir]

Minhajul, Mubarok Rancang Bangun Sistem Proteksi Kebakaran pada Coal Bin Menggunakan Automatic Dilution System. [Tugas Akhir]

Mirza, Ardiansyah Analisa lebar weld bead pada pipa carbon material SA333 Gr 6 dengan proses GTAW SMAW terhadap kekerasan, struktur mikro, dan radiography. [Tugas Akhir]

Mirza, Safitri Agatha Putri Pengaruh Business Lifecycle terhadap Strategi Restrukturisasi pada Perusahaan yang Mengalami Financial Distress. [Tugas Akhir]

Misi, Indah Surya Mentari Analisis Lebar Gap Dan Kuat Arus Pengelasan Pipa Stainless Steel SA 312 TP 316L Terhadap Sifat Mekanik, Struktur Mikro Dan Radiografi. [Tugas Akhir]

Moch, Andika Haris Saputra Implementasi Sistem Scada Multiple Slave Pada Proses Imlet, Supply dan Fabrication Menggunakan Protokol Kominikasi Modbus RTU. [Tugas Akhir]

Moch, Ilham Renanda Analisa Penyebab Kerusakan Mechanical Seal Pompa Sentrifugal GA 204B Pada PT. Petrokimia Gresik Plan Urea 1B. [Tugas Akhir]

Moch, Nofan Sugiasturi Optimasi Penjadwalan Proyek Menggunakan Metode Time Cost Trade Off (Studi Kasus Rol Gilingan PG. Krebet Baru I di PT. Barata Indonesia, Gresik). [Tugas Akhir]

Moch, Rizky Nifa Wahyudianto Pengaruh Erosi Akibat Slug Particle Terhadap Lifetime Jalur Pipa Distribusi Gas Hydrocarbon PAU Metering Station – PT Panca Amara Utama. [Tugas Akhir]

Moch., Bachrudin Al Bashir Rancang Bangun Uji Turning Circle Manuver Kapal Dengan Metode Fuzzy Logic. [Tugas Akhir]

Moch., Deva Annur Habibulloh Perencanaan Sistem Monitoring dan Kontrol Beban Double Girder Overhead Crane berbasis Mikrokontroller (Studi Kasus di PT. Barata Indonesia). [Tugas Akhir]

Moch., Fachrizal Mawaly Rancang Bangun Sistem Monitoring dan Kontrol pada Chlorination Plant PLTGU berbasis PLC-HMI di PT. PJB UP Gresik. [Tugas Akhir]

Moch., Firdana Sutiah Pasah ANALISA DAMPAK PENGGUNAAN MODEL KAP TERTUTUP PADA KAPAL RIB 306 PT. PELINDO MARINE SERVICE. [Tugas Akhir]

Moch., Izzul Fikri Perancangan Accomodation Ladder and Gangway Portable Kapasitas 1 Ton sebagai Sarana Penunjang Akses Akomodasi Kapal. [Tugas Akhir]

Moch. Ardhian, Prasetyo Purnomo ANALISA PENJADWALAN PADA PEMBANGUNAN HULL CONSTRUCTION KAPAL TUGBOAT KT. JAYANEGARA 201 2X1000 HP DI PT. DUMAS SHIPYARDS DENGAN CRITICAL PATH METHOD. [Tugas Akhir]

Moch. Ilham, Bagus Putradanna Pembuatan Sistem Informasi Inspeksi dan Monitoring Kontraktor Berbasis Android pada Perusahaan Semen. [Tugas Akhir]

Mochamad, Burhanul Mustofa DESAIN SISTEM PENDINGIN INLET AIR TURBIN GAS MENGGUNAKAN SISTEM REFRIGERASI ABSORPSI PADA PLTGU. [Tugas Akhir]

Mochamad, Firman Falaqhi Evaluasi Dan Perancangan Sistem Proteksi Petir Eksternal Berdasarkan NF C 17-102 Menggunakan Program Computer Visual Basic Pada Perusahaan Tembakau. [Tugas Akhir]

Mochamad, Rheza Mubarok Sistem Monitoring dan Kontrol Suhu Dan Debu Pada Panel Cabinet MSAN Berbasis Internet Of Thing (IoT) Dengan Metode PID. [Tugas Akhir]

Mochammad, Septian Miftahur Rochim Nilai Perusahaan Berdasarkan Good Corporate Governance (GCG) dengan Kinerja Keuangan Sebagai Variabel Intervening. [Tugas Akhir]

Mochammad, Fa'iq Khasmadin Perencanaan Sistem Penurun Gangguan Harmonik Menggunakan Filter Hibrid Dalam Upaya Peningkatan Kualitas Daya Listrik. [Tugas Akhir]

Mochammad, Fadli Syah Annas Analisa Pengaruh Desain Sambungan dan Weldable Painting pada Material SA 572 Grade 50 Terhadap Cacat Las, Struktur Makro, dan Nilai Kekerasan. [Tugas Akhir]

Mochammad, Guntur Budi Prabawa Prototipe Sistem Penyaluran Aspal Berbasis Internet Of Thing (IOT) Dan Fuzzy Logic Pada PT Perusahaan Pertambangan Gas dan Minyak Bumi. [Tugas Akhir]

Mochammad, Irfano Arifin Klasifikasi Penyakit pada Orchidaceae Menggunakan Pengolahan Citra dengan Metode Convolution Neural Network (CNN). [Tugas Akhir]

Mochammad, Nur Amirudin IDENTIFIKASI BAHAYA KEGIATAN MAINTENANCE PERUSAHAAN BIOETHANOL PADA UNIT MEKANIK DENGAN METODE JOB SAFETY ANALYSIS (JSA) DAN PEMBUATAN STANDART OPERASIONAL PROSEDUR (SOP). [Tugas Akhir]

Mochammad, Rizal Akbar Identifikasi Bahaya dengan Menggunakan Metode Bow-Tie pada Mesin Evaporator di Pabrik Gula. [Tugas Akhir]

Mochammad, Rizal Al-Fatah Rancang Bangun Sistem Monitoring Evaporator and Condenser Tank with Vacuum System Unit Stasiun Penguapan Berbasis Microcontroller-PID pada PT.PN X Pg Ngadirejo. [Tugas Akhir]

Moehammad, Izzad Dahlevi ANALISIS FABRIKASI SMALL HATCH BERSERTIFIKASI NK (NIPPON KAIJI KYOKAI) DI INDONESIA. [Tugas Akhir]

Moga, Jiwa Satria Mulia Rancang Bangun Pemantau Kualitas Pencemaran Udara Menggunakan Sensor di Industri Gula Berbasis Android. [Tugas Akhir]

Moh, Imam Jazuli Analisis Metode Repair pada Pengelasan Tube Titanium SB 338 Gr 2 ke Tube Sheet Titanium SB 265 Gr 1 terhadap Nilai Kekerasan, Struktur Mikro Dan Laju Korosi. [Tugas Akhir]

Moh, Khoirul Umam Mujibius Pengaruh Material PDM dan Alloy 31 Terhadap Korosi dan Life Time Impeller Pompa Pada Aliran Fluida Asam Phospat. [Tugas Akhir]

Moh, Syafikri Rancang Bangun Alat Bongkar Muat Kapal Ikan di Daerah Brondong Kabupaten Lamongan. [Tugas Akhir]

Moh, Yanni Fikri Klasterisasi Area Terbuka Hijau Menggunakan UAV (Unmanned Aerial Vehicle) dengan Metode Active Contour. [Tugas Akhir]

Moh., Faisal Mukti Analisa Pengaruh Variasi Kuat Arus Dan Filler Metal Pada Dissimilar Material SA240 TP 904L Dan SA573GR70 Dengan menggunakan Plug Welding Terhadap Struktur Mikro Dan Laju Korosi. [Tugas Akhir]

Moh., Gandung Aulia Pengaruh Tegangan Busur terhadap Nilai Kekerasan, Struktur Mikro dan Radiografi pada Pengelasan Esw Material A572 Grade 50. [Tugas Akhir]

Moh., Ghozy Ubaidillah Analisa Pengaruh Overheating terhadap sifat Mekanik pada kerusakan Water Wall Tube pada Coal Boiler. [Tugas Akhir]

Moh., Nuriyan Yusuf Optimalisasi Pengendalian Temperatur dan PH Nira Pada Stasiun Pemurnian Mesin Juice Heater Berbasis Mikrokontroler dengan Metode Fuzzy Logic. [Tugas Akhir]

Moh., Rizqi Ichlasul Amal RELAYOUT GALANGAN PT. PELINDO MARINE SERVICE. [Tugas Akhir]

Moh., Rofi Ismail Penilaian Risiko pada Level Luffing Crane (LLC) Menggunakan Metode FMEA dan FTA pada Industri Kapal. [Tugas Akhir]

Moh., Soleh Studi Kasus Penyebab Gangguan Ground Fault Pada Motor Circulating Water Pump-B Di PT. PJB UBJ O Dan M Paiton Unit 9. [Tugas Akhir]

Moh., Soleh Studi Kasus Penyebab Gangguan Ground Fault Pada Motor Circulating Water Pump-B Di PT. PJB UBJ O Dan M Paiton Unit 9. [Tugas Akhir]

Mohamad, Bagus Amirudin Pengaruh Parameter Resistance Seam Welding pada Sambungan Beda Ketebalan Terhadap Shear Strength , Diameter Nugget , Laju Korosi Material DIN 1.4003. [Tugas Akhir]

Mohamad, Rahju Anggis Ridhotulloh Analisa Persyaratan Kebutuhan Inflatable Liferaft Di Kapal Motor Penumpang Mutiara Alas III. [Tugas Akhir]

Mohamad, Rudy Analisa Performa Pompa Sentrifugal Sebelum Dan Setelah Repair Di Laboratorium Fluida Politeknik Perkapalan Negeri Surabaya. [Tugas Akhir]

Mohamad, Syarifudin Analisis Perawatan Motor Induksi 6kV Pada Cooling Tower Berdasar Pada IEEE Standart 43 (Studi kasus : PT. Petro Jordan Abadi). [Tugas Akhir]

Mohammad, Akmalul Mustofa Perancangan Sistem Informasi Pelaporan dan Analisis Unsafe Action , Unsafe Condition , Near Miss dan Accident serta Priority Events dengan Metode Semikuantitatif. [Tugas Akhir]

Mohammad, Alfan Adi Sampurno Pemilihan Kompressor Pengganti Pada Sistem Nitrogen Generator Guna Mendapat Hasil Yang Optimal Dari Segi Teknis Maupun Ekonomis Menggunakan Metode ANP (Analytical Network Process). [Tugas Akhir]

Mohammad, Faqih Maulana Analisis Gas pelindung dan Variasi Arus Pengelasan dengan Metode Plug Welding pada Side Sill Kereta Api Ditinjau dari Struktur Mikro, Kekerasan, dan Laju Korosi. [Tugas Akhir]

Mohammad, Iqbal Ulul Albab Identifikasi Bahaya pada Proses Pengoperasian Container Crane dengan Pendekatan HIRARC,FTA Serta Penentuan Kelayakan Rekomendasi Menggunakan BCA. [Tugas Akhir]

Mohammad, Jauhar Firdaus Rancang Bangun Converter Kit LPG (Liquefied Petroleum Gas) sebagai bahan bakar Mobil Minimalis Roda Tiga. [Tugas Akhir]

Mohammad, Roisuddin Al Asykari Pembuatan Expert System Untuk Diagnosis Penyakit Kronis Dengan Metode Forward Chaining. [Tugas Akhir]

Mohammad, Yusuf Yuliansyah Pemanfaatan Oli Bekas sebagai Fuel Pengganti Oxy Acetylene pada Proses Reforming Di Roof Kereta dengan Material SUS 304 serta Mengetahui Dampak Penggunaannya terhadap Stuktur Mikro dan Hardness Material SUS 304. [Tugas Akhir]

Mohammad, Zakky Prasanta OPTIMALISASI BIAYA DAN WAKTU REPAIR POROS DAN PROPELLER DENGAN METODE CPM DI PERUSAHAAN PERKAPALAN SURABAYA. [Tugas Akhir]

Mufida, Eka Amalia Analisa Perbandingan Modulus Kekuatan Double Plating dengan Incoming pada Konstruksi Ducting Kapal Landing Craft Utility (LCU). [Tugas Akhir]

Muh., Wildan Maretra Putra Analisis Variasi Pergeseran Sumber Radiasi dan Waktu Exposure Pada Pengujian Radiografi Dengan Teknik Double Wall Double Viewing Terhadap Kualitas Film Radiografi. [Tugas Akhir]

Muhamad, Alfani Analisis Kekuatan Konstruksi Helideck Pada Landing Platform Dock. [Tugas Akhir]

Muhamad, Bachtiar Nugraha Analisis Stabilitas dan Tegangan Kapal Kontainer 100 TEUS Akibat Alih Fungsi Ruang Muat. [Tugas Akhir]

Muhamad, Doni Fauzi ANALISA KERUSAKAN BANTALAN SKF 6305 PADA CARRIER IDLER DI PT. SEMEN INDONESIA (PERSERO). [Tugas Akhir]

Muhamad, Fatih Zacky Jazuli Analisa Teknis dan Ekonomis Proteksi Perlindungan Pipa Crossing Rel Kereta Api di KP 0 020 Jaringan Pipa Transmisi Gas Gresik - Semarang. [Tugas Akhir]

Muhamad, Iqbal Farhani Analisa Heat Input pada Sambungan Pipa 5L X65 dengan Proses Pengelasan Kombinasi STT SMAW terhadap Struktur Makro Mikro dan Sifat Mekanik. [Tugas Akhir]

Muhamad, Odi Akbar ESTIMASI TEKNIS DAN EKONOMIS ANODA KORBAN KAPAL LANDING CRAFT UTILITY (LCU) 1500 DWT. [Tugas Akhir]

Muhamad, Rizalul Lutfi Ma'arif Sistem Pendeteksi Retakan Pada Lampu "Glass" VTL Dengan Image Processing Menggunakan Metode Gray Level Co-Occurrence Matrix Dan Sum of Absolute Diffrence. [Tugas Akhir]

Muhamad, Surya Handika Perancangan Sistem Kendali dan Monitoring Truk Tanpa Awak untuk Pengantar Peti Kemas Otomatis dengan Metode Fuzzy Logic. [Tugas Akhir]

Muhammad, 'Alaikar Ridho Penambahan Gaya Anti- Buoyancy Pada Jalur Perpipaan Yang Melewati Area Rawa. [Tugas Akhir]

Muhammad, Abdul Rozaq PERHITUNGAN ULANG PERFORMA FUEL PURIFIER PUMP PADA KAPAL KN. BIMA SAKTI UTAMA DI DISTRIK NAVIGASI KELAS I SURABAYA. [Tugas Akhir]

Muhammad, Adam Analisa Pengaruh Penambahan Hull Vane Tipa NACA 4412 terhadap Seakeeping Kapal Penumpang 1200 GT. [Tugas Akhir]

Muhammad, Afiqi Otomatisasi Pengendalian Cooling Water System dengan Menggunakan Kontrol PID pada Proses Sistem Pendinginan Redundant Gas Turbine. [Tugas Akhir]

Muhammad, Agung Efendi Evaluasi HAZOP Untuk Analisis Kebutuhan Safety Integrity Level (SIL) dengan Metode Fuzzy Layer Of Protection Analysis (FLOPA) pada Waste Heat Boiler di Industri Asam Fosfat. [Tugas Akhir]

Muhammad, Agung Wicaksono Redesain Denah Kamar Mesin Untuk Menunjang Kinerja Sistem STARTING Udara Bertekanan Pada Kapal Oriental Jade. [Tugas Akhir]

Muhammad, Albistha Luvian Prathama Analisis Struktur dan Stabilitas Akibat Alih Fungsi Ruang Pada Kapal Ferry 72 Meter. [Tugas Akhir]

Muhammad, Alfian Hidayat Rancang Bangun Sistem Distribusi Waktu Dinamis Traffic Light Menggunakan Metode Pengolahan Citra Berbasis Fuzzy Logic. [Tugas Akhir]

Muhammad, Arfy Muzakki Estimasi Jarak Obstacle dan Titik Api Menggunakan Stereo Vision dan Metode Scale Invariant Feature Transform (SIFT) untuk Optimasi Gerakan pada Robot Pemadam Api. [Tugas Akhir]

Muhammad, Arifan Lizamanihi Klasifikasi Gerakan pada Sarung Tangan Penerjemah Bahasa Isyarat dengan Menggunakan Metode Neural Network. [Tugas Akhir]

Muhammad, Arya Wachid Abdurahman Analisis Variasi Weld Deposit pada Pengelasan Kombinasi FCAW dan SAW Terhadap Material SA 516 Grade 70. [Tugas Akhir]

Muhammad, Azzam Alifuddin Identifikasi Bahaya pada Unit Early Production Facility (EPF) Menggunakan Metode HAZOP dan CCA. [Tugas Akhir]

Muhammad, Barlian Paradis Identifikasi Bahaya Dengan Metode Structure What If Techniques (SWIFT) dan Fault Tree Analysis (FTA) pada Perusahaan Minuman dan Jelly Kemasan. [Tugas Akhir]

Muhammad, Budi Hendrawan Pengaruh Beban Kerja terhadap Produktivitas Kerja pada Pekerja Bagian Produksi Industri Pembuatan Cat Epoxy. [Tugas Akhir]

Muhammad, Burhan Abdillah Rancang Bangun Mesin Pemotong Adonan Kerupuk Udang. [Tugas Akhir]

Muhammad, Dahlan Pamungkas Analisis Perbandingan Lapisan Build Up Pada Material Stainless Steel Tipe 304 Terhadap Sifat Mekanik , Struktur Mikro Dan Laju Korosi. [Tugas Akhir]

Muhammad, Dzikri Sidiq Mastur Kajian Numerik Wax Deposition pada Crude Oil Pipeline dari Central Processing Area (Cpa) ke Palang Station di JOB P-PEJ. [Tugas Akhir]

Muhammad, Erwan Saraya Analisis Perbandingan Variasi Kuat Arus Dan Type Elektroda 7016 Pada Material Carbon Steel Terhadap Kualitas Pengelasan, Komposisi Kimia, Nilai Kekerasan, Dan Kuat Tarik. [Tugas Akhir]

Muhammad, Faris Aulia Rahman Desain Interior Ruang Penumpang Kapal Perintis 2000 GT untuk Meningkatkan Kualitas Keamanan dengan Tema Motif Khas Budaya Sulawesi Tenggara. [Tugas Akhir]

Muhammad, Firmansyah Prototype Pengendalian pH pada Kolam Netralisasi dan Dissolve Oxygen pada Kolam Aerasi Otomatis dengan Perbandingan Metode Neural Network Backpropagation dan Extreme Learning Machine. [Tugas Akhir]

Muhammad, Hafizhuddin Zhafiri Prototype Jembatan Timbang Otomatis Dengan Menggunakan RFID Dan Kamera Sebagai Sistem Pelaporan Online Berbasis Android. [Tugas Akhir]

Muhammad, Hilman Maulana STUDI PERANCANGAN BOAT BERBAHAN DASAR HIGH DENSITY POLYETHYLENE SEBAGAI BOAT PENYEBERANGAN DERMAGA KARTINI - PULAU PANJANG JEPARA. [Tugas Akhir]

Muhammad, Hilmy Azizi Perdana Analisis Perbandingan Metode Pengelasan GTAW Purging Gas Spotted dengan GTAW Backing Torch (Double Side Arc Welding) pada Material SA240 Tipe 304 Terhadap Struktur Mikro, Laju Korosi dan Ketahanan Stress Corrosion Cracking. [Tugas Akhir]

Muhammad, Imaduddin Afifiras Analisa Pengaruh Laju Perpindahan Panas Terhadap Efektivitas Heat Exchanger Shell And Tube 206-E-004 A Di PT. TPPI Tuban. [Tugas Akhir]

Muhammad, Imaduddin Mabruri Faktor - Faktor yang Mempengaruhi Kinerja Karyawan pada PT. And Technical Services Surabaya. [Tugas Akhir]

Muhammad, Imam Jazuli ANALISA KEKUATAN V-BRACKET SEBAGAI PENYANGGA AS PROPELLER PADA KAPAL KONTAINER KENDHAGA NUSANTARA 6. [Tugas Akhir]

Muhammad, Iqdam Otomatisasi Quality Control untuk Produk Lembaran Kardus dengan Menggunakan Image Processing di PT.XXX. [Tugas Akhir]

Muhammad, Irfan Rosyidi Distribusi Tegangan Pada Support Pipa Soot Blower Akibat Perubahan Beban Thermal Pada Boiler. [Tugas Akhir]

Muhammad, Irfani ANALISIS PENYEBAB KETERLAMBATAN PROSES PEMBANGUNAN KAPAL SABUK NUSANTARA 71 DI PT. JANATA MARINA INDAH SEMARANG. [Tugas Akhir]

Muhammad, Ja'far Ubaidillah Klasifikasi Gelombang Otot Lengan pada Robot Manipulator Menggunakan Metode Support Vector Machine. [Tugas Akhir]

Muhammad, Jihadin Ilmi Karakteristik Hidrodinamika Aliran Air Disekitar Propeller-Rudder Pada Berbagai Bentuk Profile Rudder Dan Jarak Dengan Propeller. [Tugas Akhir]

Muhammad, Johan Rifa'i Analisis Total Productive Maintenance Pada Mesin Press Fine Blanking 1100 Ton Dengan Metode OEE (Overall Equipment Effectiveness) Di Perusahaan Manufacturing Press Part. [Tugas Akhir]

Muhammad, Khafidzuddin Sistem Monitoring Pengukuran Volume Tangki HSD Oil Storage Berbasis IoT. [Tugas Akhir]

Muhammad, Kholil Penjadwalan Perawatan Berdasarkan Reliability Based Maintenance Pada Unit Finish Mill. [Tugas Akhir]

Muhammad, Luqman Harish Analisa Pengaruh Erosi akibat Pasir terhadap Lifetime Jalur Pipa Drain Line Gas Production Separator pada Fasilitas Pengolahan Gas Bumi. [Tugas Akhir]

Muhammad, Mujibul Ba'is Analisis Pengaruh Modifikasi Panjang Kapal Terhadap Kecepatan Dan Hambatan Pada Speed Boat Js 1431 Belawan. [Tugas Akhir]

Muhammad, Naufal Candra Darmawan Analisis Perbandingan Metode Pengelasan GTAW Static Purging Gas Dengan Moving Purging Gas Pada Materia SA 240 Tipe 304 Terhadap Nilai Kekerasan, Struktur Mikro, Dan Laju Korosi Intergranular. [Tugas Akhir]

Muhammad, Nu'man Lutfi Pendeteksi Objek Api dan Boneka Pada Robot Pemadam Api Berkaki Menggunakan Video Processing Berbasis Mini PC. [Tugas Akhir]

Muhammad, Nur Aslam Hardan Priadi Rancang Bangun Mesin Crusher Plastik. [Tugas Akhir]

Muhammad, Rafli Firmansyah Analisis Penyebab Trip Inverter Pada Proses Grinding Unit Di PT. Petro Jordan Abadi Gresik. [Tugas Akhir]

Muhammad, Rendi Yusuf Analisa Tegangan Sistem Perpipaan Line BTF-PJUTIP-CTP-PI-DW-005 ORF (Onshore Receiving Facility) Akibat Soil Settlement. [Tugas Akhir]

Muhammad, Rifa'i Perancangan Struktur Belakang Mobil Minimalis Roda Tiga. [Tugas Akhir]

Muhammad, Rifqi Awaluddin Rancang Bangun Kontainer Suhu Panas Dan Dingin Otomatis Dengan Metode PID Adaptif. [Tugas Akhir]

Muhammad, Rizqiawan Analisa Pengaruh Interpass Temperature Pengelasan Material Pipa Cu-Ni (Copper Nikel) UNS-C70600 dengan Proses Pengelasan GTAW terhadap Kekerasan dan Struktur Mikro. [Tugas Akhir]

Muhammad, Rukman Guyen Analisa Tegangan New Critical Line Pipe dari Discharge Compressor Scrubber Train Menuju Tie in Point Existing Mp Gas Scrubber Pipe pada Sistem CO2 Removal di Fasilitas Produksi Cilamaya Utara. [Tugas Akhir]

Muhammad, Syamsul Huda Analisis Kebocoran Sistem Tangki Penyimpanan Asam Sulfat Di Area WTP Dengan Metode Qra (Quantitative Risk Analysis. [Tugas Akhir]

Muhammad, Tony Pradana Perencanaan Perawatan Reach Stacker (RS) dan Rubber Tyred Gantry (RTG) Menggunakan Metode Reliability Centered Maintenance (RCM) II pada Perusahaan Bongkar Muat. [Tugas Akhir]

Muhammad, Wahyu Pengaruh Fluida Phosporic Acid Slurry Terhadap Laju Korosi Erosi pada Material Super Duplex 2507 dan Hastelloy G-30 pada Sistem Perpipaan R-2304 Menuju P-2302-B (Suction) di PT. Petro Jordan Abadi - Gresik. [Tugas Akhir]

Muhammad, Yudho Febriansyah Rancang Bangun Alat Ukur Dan Deteksi Pencegahan Kerusakan Motor Pada Mesin Sandblasting Berbasis Arus Dan Temperature Di PT.Barata Indonesia. [Tugas Akhir]

Muhammad, Yusuf Rahmadi Rancang Bangun Dudukan Rudder Tempel untuk Alternatif pada Perahu Mesin Inboard. [Tugas Akhir]

Muhammad, Zainal Arifin PERENCANAAN PEMELIHARAAN DAN OPTIMASI BIAYA PERAWATAN PADA SISTEM UTILITY DENGAN METODE PREVENTIVE MAINTENANCE. [Tugas Akhir]

Muhammad, Zia'ulhaq Iqramullah Rancang Bangun Anti Rust Electric Control Pada Mesin CNC. [Tugas Akhir]

Mujibur, Rochman Sistem Bongkar-Muat Muatan Truk Menggunakan Lengan Robot Berbasis Arduino-PC Dengan Metode Back Propagation Neural Network. [Tugas Akhir]

Mukhamad, Ilham Rakhmadana Putra Analisis Temperatur PWHT dan Holding Time Pada Sambungan Las Material SA 387 Grade 11 Class 1 Terhadap Nilai Kekerasan dan Struktur Mikro. [Tugas Akhir]

Mukhammad, Risfan Baihaqi Analisa Dampak Perubahan Jarak Gading Terhadap Berat Kontruksi Pada Kapal Cepat Rudal 60M. [Tugas Akhir]

Mukti, Nugraha Pramu Nurwiyadi Pengaruh Variasi Besar Radius Cold Working Pada Pengelasan Tangki Terhadap Kekerasan Dan Struktur Mikro. [Tugas Akhir]

Mukti, Nugraha Prima Nurwiyadi Optimasi Sistem Counting dan Monitoring Cacat Fibercement menggunakan Metode Principal Component Analysis. [Tugas Akhir]

Musa, Albana Perancangan Dan Pembuatan Prototype Remote Control Buoys Bertenaga Baterai Dengan Aktuator Propeller. [Tugas Akhir]

Muslikin, . Minimalisasi Pengaruh Water Hammer Terhadap Nilai Tegangan Discharge Pompa GM 53 Jalur CY1 dengan Perbandingan Accumulator dan Surge Anti Valve. [Tugas Akhir]

Mustika, Ningrum Analisis Fatigue Life Konstruksi Kapal 17500 LTDW Crude Oil Tanker. [Tugas Akhir]

Nabilla, Ahmada Maidah Implementasi dan Monitoring HSE (Health, Safety, and Environment) Plan Berbasis Software pada Proyek Konstruksi. [Tugas Akhir]

Nada, Ayu Salsabela Perancangan Interior Kapal Ferry 1500 GT dengan Tema Budaya Maluku untuk Meningkatkan Daya Tarik bagi Penumpang. [Tugas Akhir]

Nadia, Imamah Rahmadhani Analisis Desain De-ethanizer Coloumn 043-T-31002 dan Support Akibat Pengaruh dari Wind Load dan Seismic Load pada Proyek Pembangunan Kilang LNG Tangguh Train 3 di Teluk Bintuni, Papua Barat. [Tugas Akhir]

Nadia, Kumalasari Analisa Kinerja Bongkar Muat Terminal Bahan Bakar Minyak Tuban dengan Metode Lean Six Sigma. [Tugas Akhir]

Nadia, Rizki Ariyani Analisis Pengendalian Kualitas Untuk Mengurangi Botol Bocor pada Departemen Blow Molding di Industri Packaging. [Tugas Akhir]

Nadya, Asprilia Normalia Amron Perencanaan Jadwal Inspeksi Pada Jalur Pipa Penyalur Minyak Mentah Dengan Metode Risk Based Inspection (RBI). [Tugas Akhir]

Nadya, Elva Almira Wardani Analisis Continual Service Improvement dan Customer Acquisition Cost Untuk Aplikasi Pengiriman Peti kemas pada Perusahaan Pelayaran (Studi Kasus Samudera Shipping Line Ltd). [Tugas Akhir]

Nadya, Gofiamer Rindha C. Studi Kegiatan Perawatan Mesin Blow Molding SMC 2000 DTC Melalui Pendekatan Total Productive Manintenance (TPM). [Tugas Akhir]

Nadya, Novarizka Mawuntu Pengaruh Rasio Kompresi terhadap Performa dan Emisi Gas Buang pada Mesin Diesel Dual Fuel Diesel-CNG. [Tugas Akhir]

Nadya, Ratna Fadila Alat Keselamatan Pengendara dari Kondisi Lelah Dilengkapi dengan Multi Level Safety Berbasis Pengolahan Citra Menggunakan Metode Haar Cascade Classifier. [Tugas Akhir]

Najmatul, Fitriah ANALISA PERUBAHAN KECEPATAN AKIBAT PENAMBAHAN PANJANG KAPAL PADA MIDSHIP KM X. [Tugas Akhir]

Nanda, Imerlia Farezha Sistem Informasi Monitoring Mesin Produksi dan Pekerja pada Departemen Tempa dan Prasarana Perkeretaapian di Perusahaan Senjata. [Tugas Akhir]

Nanda, Indah Hari Lestari Identifikasi Potensi Bahaya dan Pembuatan Risk Mapping Pada Proses Finishing Produk Dioctyl Phthalate (Studi Kasus : PT. Plasticizer ). [Tugas Akhir]

Nanda, Raka Raditya Penilaian Risiko Pada Expor Lline PPP Menuju TangkiI H-13 PT. Pertamina EP Asset 5 Field Sangasanga Menggunakan Metode Risk Based Inspection (RBI). [Tugas Akhir]

Narawikan, Wismanto Rancang Bangun Mechanical Controllable Pitch Propeller untuk Kapal Kecil Mesin Dalam dengan Menggunakan Mesin CNC. [Tugas Akhir]

Naufa, Aulia Rahma Analisis Risiko Kegagalan pada Sistem Kompresor Painting Blasting di Perusahaan Fabrikasi Baja. [Tugas Akhir]

Naufal, Moralis Jakaria Analisa Performa Refrigerant Condensor 127-C Pabrik Amoniak-Urea 1 A PT. Petrokimia Gresik. [Tugas Akhir]

Naufal, Rif'at Al Mahbubi Pengenalan Warna dengan Gelombang Otak ( Mindwave ) untuk Penyandang Disabilitas Menggunakan Metode FFT dan Deep Learning. [Tugas Akhir]

Naufal, Zaky Alifyan Perancangan Sistem Inspeksi, Pelaporan Kecelakaan dan Monitoring Kerja Alat Berat Berbasis Android. [Tugas Akhir]

Naura', Abida Djamil Studi Layer Of Protection Analysis (LOPA) pada Steam Drum Dan Superheater Untuk Perusahaan Pembangkit Berkapasitas 600 MW. [Tugas Akhir]

Nedya, Nayaka Sastri Perencanaan Instalasi Pengolahan Limbah Cair Pada Industri Saos, Kecap dan Permen Ting Ting Jahe. [Tugas Akhir]

Nelvidya, Zein Khana Re-desain Sistem Perpipaan Jalur Bypass Pada HPH (High Pressure Heater) Di PLTU Tanjung Awar-Awar Tuban. [Tugas Akhir]

Neoninsa, Risma Rossihanida Analisa Pengendalian Kualitas Proses Produksi Botol pada Departemen Blow Molding di Industri Packaging. [Tugas Akhir]

Nike, Maya Manggar Sari Prototype Sistem Monitoring Gas pada Minyak Transformator Berbasis Web. [Tugas Akhir]

Niken, Rahmadani Analisis Risiko Pada Pulverizer Dan Evaluasi Penjadwalan Maintenance Dengan Metode Grey FMEA Dan RCM II (Studi Kasus : Pembangkit Listrik Tenaga Uap (PLTU)). [Tugas Akhir]

Nikko, Andreyono Pengaruh Penempatan Reducer Terhadap Laju Erosi Dan Life Time Jalur Pipa Crude Palm Oil 8”-PL-039-A01A Di Perusahaan Penyedia Storage Tank Tanjung Perak. [Tugas Akhir]

Ningsih, Retno Penilaian Kinerja Perusahaan Menggunakan Analytical Hierarchy Process Dengan Metode Balanced Scorecard (Studi Kasus Pada Perusahaan Jasa Bongkar Muat). [Tugas Akhir]

Nisa, Elvira Dwipayana Pengaruh Faktor Personal dan Iklim Keselamatan (Safety Climate) terhadap Perilaku Keselamatan (Safety Behavior) Pekerja di Perusahaan Kereta Api. [Tugas Akhir]

Nisma, Mutiara Dian Safitri Pengintegrasian Metode Kano dan Servqual pada Quality Function Deployment untuk Meningkatkan Kualitas Pelayanan pada PT. Tambanganraya Permai. [Tugas Akhir]

Nixzam, Fathurrahman ANALISA KEKUATAN KONSTRUKSI RAMP DOOR PADA KMP.TONGKOL. [Tugas Akhir]

Nora, Komara DESAIN INTERIOR RUANG NAVIGASI KAPAL KM.CIREMAI UNTUK MENINGKATKAN KEWASPADAAN AWAK KAPAL. [Tugas Akhir]

Novendi, Afiadin Pengendalian High Risk pada Pulverizing System di PLTU menggunakan Metode LOPA. [Tugas Akhir]

Noveta, Fernaldinatan Efisiensi Penggunaan Raw Material (Plat) pada Project Bangunan Baru Barge di PT. Galangan Kapal Madura. [Tugas Akhir]

Novia, Triaswati Perencanaan Kegiatan Perawatan Dengan Metode RCM II Dan Cost Of Unreliability (COUR) Pada Mesin Evaporator. [Tugas Akhir]

Novianti, Wahyu Rachmawati Analisa Redesain Kapal Perintis 1200 GT Bedasarkan Kriteria Stabilitas Kebocoran. [Tugas Akhir]

Novita, Akhiri Wijayanti Analisa Desain Line Break Control Valve dengan Variasi Sudut Bending Pada KP 79.011 Project Gresem. [Tugas Akhir]

Novtafani, Muhammad Ibrahim Prototipe Sistem Kontrol Dengan Menggunakan Metode Fuzzy Logic dan Pemantauan Sumber Air Berbasis IoT (Internet of Thing) serta Pendeteksi Kebocoran Pada Pipa. [Tugas Akhir]

Nuari, Wahyu Af'al Firdausi ANALISA KEKUATAN PONDASI SENJATA AKIBAT DENTUMAN MERIAM OTOMELARA TWIN 40L70 TERHADAP KAPAL ANGKUT TANK MILIK TNI – AL. [Tugas Akhir]

Nur, Aini Maghfiroh Perencanaan Total Productive Maintenance (TPM) terhadap Peningkatan Efektifitas Mesin Reaktor di Perusahaan Pupuk. [Tugas Akhir]

Nur, Chayati PERANCANGAN SAFETY AND FIRE CONTROL PLAN SERTA SISTEM EVAKUASI PADA KAPAL PERINTIS 1200 GT. [Tugas Akhir]

Nur, Dewi Ratna Swari Human Reliability Assessment Dengan Metode HEART Pekerjaan Handling Mold Dan Rancang Bangun Monitoring Berat Pada Hand Stacker Semi Electric Di Perusahaan Packaging Surabaya. [Tugas Akhir]

Nur, Elis Wahyuningtiyas Rancang Bangun Sistem Monitoring Kontrol Suhu dan Kelembaban Pada Automatic Voltage Regulator Room Berbasis IoT. [Tugas Akhir]

Nur, Fatah Ihsan Rifa'i Analisa Perhitungan Penurunan Daya PLTU Unit 3 PT. PJB GRESIK. [Tugas Akhir]

Nur, Haqiqil Insi ANALISA PENGARUH KONDISI PERMUKAAN PLAT BAJA PADA HASIL PEMBACAAN ALAT ULTRASONIC TEST. [Tugas Akhir]

Nur, Syamsu Ernandy Desain Fire Fighting system pada pabrik gula berdasarkan perhitungan harga material dan estimasi biaya jasa kontruksi. [Tugas Akhir] (Submitted)

Nurdiah, Siregar ANALISA PENGARUH BESARNYA BEBAN BLOCK TERHADAP KEEL DEFLECTION PADA PROSES JOIN BLOCK KAPAL SN 71. [Tugas Akhir]

Nurudin, Luqman Arif PENGARUH PENAMBAHAN BLADE PADA INTAKE VALVE UNTUK OPTIMASI SWIRL PADA DIESEL DENGAN SIMULASI CFD. [Tugas Akhir]

Nurul, Annisa Rahmandita Pengaruh Pengurangan Riser Clamp terhadap Ketahanan Fatigue Lifetime pada Rancang Bangun Pipeline Riser. [Tugas Akhir]

Nurul, Istiqomah ANALISIS KESELAMATAN KAPAL NELAYAN MENGGUNAKAN METODE EMERGENCY LEVEL BERDASARKAN DATA AUTOMATIC IDENTIFICATION SYSTEM. [Tugas Akhir]

Nuzulia, Rachma Analisa Kinerja Proses Produksi dengan Lean Six Sigma UNTUK Meminimalkan Waste di PT Berkah Aneka Laut Surabaya. [Tugas Akhir]

Octamanda, Arif Dharmawan Rancang Bangun Omni Directional Speaker guna Penyebaran Suara yang Merata Mencapai 360 Derajat dalam Ruangan. [Tugas Akhir]

Octywidya Ashifah, Pavietta Analisa Kelayakan Investasi Rencana Penambahan Fasilitas Docking Launching Way (Studi Kasus: Pt. Adiluhung Saranasegara Indonesia). [Tugas Akhir]

Oka, Puji Lestari Analisis Pengaruh Faktor Penyebab Kecelakaan dari Hasil Mini-MORT terhadap Keluhan Cold Stress pada Pekerja Cold Storage. [Tugas Akhir]

Okky, Nugroho Pemanfaatan Limbah Sekam Padi sebagai Adsorben Logam Berat Pb. [Tugas Akhir]

Oktavian, Bagas Kusuma Dewa Aplikasi Gelombang Otak (Mindwave) Sebagai Penggerak Lengan Robot Menggunakan Metode Support Vector Machine (SVM). [Tugas Akhir]

Olla, Mitasari Teknik Identifikasi Menggunakan Metode HIRADC dan FTA pada Pekerjaan Non Rutin di Industri Pengolahan Minyak Pelumas. [Tugas Akhir]

Omira, Hamidan Yuqa Studi Numerik Pengaruh Variasi Sudut Stagger Silinder Sirkular Pada Sisi Advancing Blade Terhadap Performa Turbin Air Savonius Tipe Myring. [Tugas Akhir]

PPNS, Perpustakaan Profil Politeknik Perkapalan Negeri Surabaya 2016. [Video]

PPNS, Perpustakaan Profil Politeknik Perkapalan Negeri Surabaya 2017. [Video]

PPNS, Perpustakaan Prosesi Wisuda ke 27 Politeknik Perkapalan Negeri Surabaya, Tahun 2017. [Image]

PPNS, Perpustakaan Prosesi Wisuda ke 28 Politeknik Perkapalan Negeri Surabaya, Tahun 2018. [Image]

Padang, Wikar Atmadika Implementasi MetodeMini Management Oversight and Risk Tree untuk Analisis Kecelakaan Vehicle and Driving di Perusahaan Peleburan Baja. [Tugas Akhir]

Panca, Wahyu Sulistyaningsih MINIDREDGER MODIFICATION WITH ADDITION OF HYDRAULIC EXCAVATOR FOR DREDGING TERMINAL POND OF PERAK PORT. [Tugas Akhir]

Pandam, Eko Prihatmoyo Rancang Bangun Mesin Destilator Pengubah Limbah Plastik Menjadi Minyak. [Tugas Akhir]

Pandega, Dewanto Putra Rancang Bangun Sistem Scada pada Proses Pengepakan Teh dengan Komunikasi Modbus. [Tugas Akhir]

Panggih, Arung Kanigara Studi Perancangan Kapal Ikan Berbahan Dasar Plastic High Density Polyethyelene untuk Daerah Pantai Selatan Kabupaten Purworejo. [Tugas Akhir]

Panji, Jati Kusuma Rancang Bangun Magnetic Container Locker (MCL) dengan GPS dan Sensor IMU Sebagai Pemantau Kontainer Berbasis Android. [Tugas Akhir]

Pendra, Setiobudi Pengaruh Welding Parameter Dan Pembersihan Permukaan Pada Pengelasan Resistance Spot Welding (RSW) Material Alumunium 5083 Terhadap Tegangan Geser Dan Metallography. [Tugas Akhir]

Peny, Diyannata Evaluasi Emergency Response Plan dan Pengujian Lama Nyala Bahan Fosfor sebagai Jalur Evakuasi pada Feed Processing Area di Perusahaan Pakan Ternak. [Tugas Akhir]

Pipit, Setiawati Studi Numerik Pengaruh Impact Jangkar Jatuh Bebas Terhadap Deformasi Dan Tegangan Pada Pipeline Offshore YYA-KLB. [Tugas Akhir]

Pradana, Nadzir Shah Al-jauhar Rancang Bangun Meja Kerja sebagai Jig dan Fixture Peralatan Perkayuan dengan Pendekatan RULA. [Tugas Akhir]

Pradita, Eko Kuncahyo Perencanaan Penempatan Engine Pada Mobil Minimalis Roda Tiga. [Tugas Akhir]

Pradita, Nurkholies Optimasi Setting Parameter CNC Milling pada Material S50C terhadap Kekasaran Permukaan dan Keausan End Mill menggunakan Metode Taguchi Grey Relational Analysis. [Tugas Akhir]

Pragalbo, Adikara Haryanto Sistem Monitoring Getaran pada Reusing Pump untuk Mencegah Kerusakan Berbasis Internet of Things (IoT). [Tugas Akhir]

Pramudya Ardiyani, Desinta Analisa Kelayakan Bisnis Pendirian International Marine Service di PT Pelindo Marine Service. [Tugas Akhir]

Pratikto, Yusuf Alfikri MODIFIKASI PROFIL PADA FRAME WATER TANK DI KERETA API BANGLADESH BERTIPE MG (METRE GAUGE). [Tugas Akhir]

Prayoga, Afdill Alkarim Analisis Pengaruh Ukuran Karbon dan Variasi Unsur Katalis Pada Proses Pack Carburizing Karbon Rendah Terhadap Struktur Mikro, Case Depth, Dan Nilai Kekerasan. [Tugas Akhir]

Prima, Adam Aufa Analisis Variasi Backing Gas pada Pengelasan Duplex Stainless Steel 31803 terhadap Struktur Mikro, Kekerasan, Laju Korosi dan Ferrite Content. [Tugas Akhir]

Priyadi, Hadi Sulaksono Analisis Potensi Bahaya Kebocoran Gas CH4 dan H2S pada Wastewater Treatment Plant Industri Bioetanol. [Tugas Akhir]

Pudjo, Noer Pratama OPTIMASI DAN PENYUSUNAN ULANG SCHEDULE PROYEK PEMBANGUNAN PIPA GAS GRISSIK – PUSRI DENGAN MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD – TIME COST TRADE OFF. [Tugas Akhir]

Puguh, Prasetyo Utomo Analisa Alternatif Modul Dalam Sistem Informasi Manajemen Reparasi Kapal Pada Perusahaan Galangan Kapal Menggunakan Metode Analytical Hierarcy Process (AHP). [Tugas Akhir]

Puguh, Utomo Prototype Radar Untuk Nelayan Tradisional. [Tugas Akhir]

Puguh i, Aris Wibowo Mukt Studi Perubahan Sarat Pada Kapal Ikan Di Daerah Brondong Untuk Mengetahui Muatan Kapal. [Tugas Akhir]

Purwa, Sadewa Analisis Penggunaan Backing Gas Pada Pengelasan GTAW Duplex Stainless Steel Terhadap Struktur Mikro, Ferrite Content, Laju Korosi dan Nilai Kekerasan. [Tugas Akhir]

Pury, Erlanda Sabilina Rancang Bangun Lamella Clarifier dan Filter Terhadap Penurunan Kadar TSS, BOD dan COD pada Limbah Tahu. [Tugas Akhir]

Pusparani, Dina Analisa Risiko Keterlambatan Material Impor Pada Pembangunan Kapal Baru di PT.XYZ dengan Metode House Of Risk (HOR). [Tugas Akhir]

Puspita, Dias Anugraini Prototype Alarm Monitoring System (AMS) dan Smart Autotransfer Tank (SAT) Dalam Upaya Mengoptimalkan Sistem Bahan Bakar Kapal Berbasis IoT. [Tugas Akhir]

Putri, Dwi Anggraini Pengolahan Limbah Cair Industri Tekstil Batik Dengan Menggunakan Metode Fotokatalis TiO2-Karbon Aktif Tempurung Kelapa. [Tugas Akhir]

Putri, Fajar Puspita ANALISA TEGANGAN PADA STRUKTUR PINTU RAMPA SAMPING KAPAL SSV. DAVAO DEL SUR SESUAI STANDAR AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC). [Tugas Akhir]

Qurota Akyun, Nellynda Engaruh Keadilan Distributif, Prosedural Dan Interaksional Terhadap Kinerja Karyawan Pada PT Pembangkitan Jawa-Bali. [Tugas Akhir]

R. Muhammad, Mahindrya Fudryatna Pratama Pengaruh Kebocoran Superheater Terhadap Efisiensi HRSG Heat Recover Steam Generator Unit 3.1 PLTGU PJB UP Gresik. [Tugas Akhir]

R.lucky, Budi Prasetya Analisis Risiko Pekerjaan Tank Cleaning Tangki Timbun dengan Metode HIRADC dan FTA Dengan Pemberian Rekomendasi Menggunakan Metode BCR. [Tugas Akhir]

RHAMADHANI, WAHYU HIDAYAT STUDI KEKUATAN BANTALAN POROS PROPELLER PADA KAPAL NIAGA. [Tugas Akhir]

RIAN, KRISDIANTO ANALISA SISTEM TRANSMISI AKIBAT PERUBAHAN TENAGA PENGGERAK PADA KAPAL PERANG DI PT. PAL SURABAYA DENGAN SOFTWARE. [Tugas Akhir]

RICKY, PRABOWO REDESIGN SISTEM PIPA PADA POMPA GRAVING DOCK 2 DAN 3 PT. PELINDO MARINE SERVICE. [Tugas Akhir]

RURY, ROSMITHA SARY ANALISA PERBANDINGAN BIAYA OPERASIONAL POMPA DOCK 2 DENGAN DOCK 3 DI PT. PELINDO MARINE SERVICE. [Tugas Akhir]

Rachma, Febriwati Ekaputri Sari Analisis Risiko Kebocoran Pada Slug Catcher Area Gas Processing Facility di Perusahaan Minyak dan Gas Bumi. [Tugas Akhir]

Rachmad, Noviandri Kajian Numerik Pengaruh Penambahan Dua Silinder Sirkular Pada Sisi Advancing Blade Terhadap Performa Turbin Air Savonius. [Tugas Akhir]

Radif, Ajidan Analisa Tegangan dan Fatigue Pipa Venting Control Valve Line 6-MPS-3A-004 Jalur Steam Header Gresik Gas Cogeneration Plant PT. Petrokimia Gresik. [Tugas Akhir]

Rafi, Nugroho Rancang Bangun Automatic Gear Berdasarkan Kecepatan dan kemiringan Sepeda Menggunakan Fuzy Logic. [Tugas Akhir]

Rafi, Tri Noviyanto Pengaruh Deformasi Plastis Material Carbon Steel A53 Gr B Terhadap Nilai Kekerasan dan Nilai Laju Korosi CPO Serta Steam. [Tugas Akhir]

Rafida, Adna Faradibah Penilaian Risiko pada Galvanizing Process Pipa Baja dengan Metode HIRARC dan Fishbone Risk Diagram di Perusahaan Fabrikator Pipa. [Tugas Akhir]

Rafidan, Maulana Sudibyo Rancang Bangun Kendali Coal Handling System Untuk Pengisian Bungker Menggunakan Metode PID Pada PLTU Batubara. [Tugas Akhir]

Rafif, Akhmad Makarim Analisis Korelasi Prosentase Zinc Anode Terhadap Ketebalan Cat Dan Plat Pada Kapal. [Tugas Akhir]

Rahim, Ananta Implementasi Analisis dan Screening Tingkat Risiko Penyakit Jantung Koroner dengan Metode Framingham Score Berdasarkan Weighted Score Berbasis Android. [Tugas Akhir]

Rahmad, Bayu Prasongko ESTIMASI PENAMBAHAN KARET PADA LINING & CEILING YANG BERPENGARUH TERHADAP REDUKSI NOISE KM.SABUK NUSANTARA 104. [Tugas Akhir]

Rahmat, Gilang Ubaidillah ANALISA PERFORMA POMPA SENTRIFUGAL 834 P-002-B PADA PROSES SERVICE BLENDED FUEL OIL (BFO) DI PT. TPPI TUBAN. [Tugas Akhir]

Rais, Bastomi Alat Bantu Pendeteksi Objek Sekitar Bagi Tuna Netra Menggunakan Stereo Vision Dengan Metode Convolutional Neural Network (CNN). [Tugas Akhir]

Raisa Azhar, Ayu Analisis Pengaruh Kompetensi Kerja, Motivasi Kerja dan Kepuasan Kerja Terhadap Kinerja Karyawan PT. Ampel Jaya. [Tugas Akhir]

Raka, Aditya Putra Sugiarto Perancangan Fire Suppression System dengan Metode Local Application pada Mesin Rotogravure pada Perusahaan Plastik di Sidoarjo 66. [Tugas Akhir]

Rakhmad, Faizal Yudha Potensi Pemanfaatan Limbah Solvent Hasil Recovery dan Minyak Jelantah sebagai Bahan Bakar Alternatif (Studi Kasus: Industri Farmasi). [Tugas Akhir]

Rakhmad, Ilham Hamdan Analisa Perbandingan Performa Antara Pompa Sentrifugal Dan Pompa Roda Gigi Dari Segi Ekonomis di PT. ALP Petro Industri. [Tugas Akhir]

Ramadani, Bima Hammam Nurafalah Aplikasi Monitoring Data Akusisi Perangkat AIS CLASS B Berbasis Mikrokontroler Sebagai Tracking Data Kapal. [Tugas Akhir]

Ramadhanu, Adi Nurcahyo ANALISIS PENGARUH HEAT INPUT PENGELASAN OVERHEAD TERHADAP TEGANGAN SISA DAN DISTORSI PELAT MAIN DECK KAPAL PERINTIS 1200 GT MENGGUNAKAN METODE ELEMEN HINGGA. [Tugas Akhir]

Ramadhona, Mahendra Perancangan Vessel Safety Monitoring System Bagi Nelayan Menggunakan LORA. [Tugas Akhir]

Ramazani, Eka Putra Identifikasi Kurva Karakteristik IV-PV dan Perancangan Maximum Power Point Pada Solar Cell Dengan Metode Fuzzy Logic. [Tugas Akhir]

Rangga, Abdiyanto Re-desain Sistem Instalasi Lay-out Engine Room, Bilge System, Ballast System, Fire Main System, Domestic Fresh Water dan Sea Water Supply pada kapal SV. Garuda Offshore. [Tugas Akhir]

Rangga, Dwiki Anjasmoro Pembuatan Sistem Informasi Manajemen Inspeksi Proteksi Kebakaran Aktif Berbasis Web dan Android (Studi Kasus di Politeknik Perkapalan Negeri Surabaya). [Tugas Akhir]

Rangga, Novas Saputra Prototipe Autopositioning dan Palletizing pada Sistem Penyusunan Kardus dengan Menggunakan Metode Fuzzy di Pabrik Pengolahan Mie. [Tugas Akhir]

Rani, Fahamsari Penerapan Metode Fuzzy Analytic Hierarchy Process Dalam Penentuan Faktor Faulty Behavior Risk Pada Bengkel Las PPNS. [Tugas Akhir]

Raqih, Arizona Pradhika Analisa Performa Propeller B-Series Pada Kapal Ferry 5000 GT. [Tugas Akhir]

Ratna, Gita Cahyanti Penentuan Interval Preventive Maintenance pada Cane Cutter dan Intermediate Carrier Menggunakan Simulasi Monte Carlo. [Tugas Akhir]

Ratna, Maulina Studi Perancangan Sistem Pengendalian dan Monitoring Overpressure Steam Tangki Evaporator dan Level Nira Berbasis Arduino. [Tugas Akhir]

Ratna, Rahayu Setyaningsih Analisis Stabilitas Akibat Modifikasi Penambahan Gross Tonnage Pada KMP. Musthika Kencana Untuk Memenuhi Syarat Pelayaran di Pelabuhan Merak – Bakauheni. [Tugas Akhir]

Raudina, Zhafirah Nur Amalia Analisis Penyebab Kecelakaan Pada Perusahaan Kemasan Karung Menggunakan Siklus Plan-Do-Check-Action (PDCA). [Tugas Akhir]

Raviza, Indiatama Visualisasi Monitoring Performance Pada Motor Listrik AC 1 Fasa Berbasis Visual Augmented Reality. [Tugas Akhir]

Rayhan, Hanif Usamah Studi Pengurangan Emisi CO2 dengan Penggunaan LNC pada Pembangkit Listrik di Indonesia dengan Metode Linear Regression. [Tugas Akhir]

Regita, Palupi Estimasi Harga Pokok Produksi Roll Gilingan dengan Metode Job Order Costing dalam Penentuan Harga Jual (Studi Kasus pada Perusahaan Manufaktur Khususnya pada Workshop 4). [Tugas Akhir]

Rekadian, Arif Penentuan Interval Perawatan Komponen kritis CNC Flame Plasma Cutting Machine menggunakan metode Reliability Centered Maintenance (RCM). [Tugas Akhir]

Rena, Yulia Putri Fire Load Density sebagai Analisa Resiko dan Nilai Desain untuk Bangunan Tahan Api. [Tugas Akhir]

Rendik, Bintoro Sistem Pengendali Beban Terkontrol Untuk Pengujian Generator-Set Di Laboratorium Reparasi Listrik Politeknik Perkapalan Negeri Surabaya. [Tugas Akhir]

Rendy, Bagas Prasetyo Analisa Beveling Dan Rewelding Pada Deformasi Pipa Spool Stainless Steel Gr 312 Tp 316L Terhadap Nilai Kekerasan Dan Metallography. [Tugas Akhir]

Renny, Marina Tunggal Dewi Rancang Bangun Sistem Kontrol Putaran Motor Cooling Fan Radiator Dengan Dimmer Berbasis Mikrokontroler Pada Kereta Pembangkit K1. [Tugas Akhir]

Reynalda, Maulana Uji Kelayakan Penggunaan Berbagai Jenis Rejuvenator Terbarukan Terhadap Aspal Daur Ulang dengan Menggunakan Marshall Mix Design Method dan Finite Element Method. [Tugas Akhir]

Reynaldo, Risdiyansyah Pradana PENGUKURAN PRODUKTIFITAS GALANGAN DALAM PEMBANGUNAN KAPAL PERINTIS 1200 GT. [Tugas Akhir]

Reyza, Fahlafi Analisa Pengaruh pH Lingkungan terhadap Laju Korosi dan Waktu sisa pada Heat Affected Zone Akibat Pengelasan SMAW Spec Pipa API 5L Grade B. [Tugas Akhir]

Reza, Kailla Garnet S. Hadi ANALISA KEMUNGKINAN TERJADINYA KEBOCORAN PADA KAPAL MV. KENCANA GENERAL CARGO 3000 DWT DENGAN MENGGUNAKAN FLOODABLE LENGTH CURVE. [Tugas Akhir]

Rezaldi, Adji Saputera Perancangan Dan Pembuatan Sistem Monitoring Arus Motor 3 Phasa Berbasis Internet of Things (IOT). [Tugas Akhir]

Rezha, Maulana Kusuma Arum Pemodelan Getaran Pada Overhead Crane SWL 5 Ton. [Tugas Akhir]

Rezky, Fardhan Fahrezy Perencanaan Design Engine pada mobil minimalis roda tiga. [Tugas Akhir]

Rhapsody, M.B. Harianja ANALISA KEKUATAN STRUKTUR HELIDECK PADA KAPAL PATROLI 73 METER DENGAN MENGGUNAKAN METODE ELEMEN HINGGA. [Tugas Akhir]

Ria, Megawati Perancangan Ulang Penyimpanan Bahan Kimia Berbahaya dan Beracun (B3) Pada Gudang Utama 7 Departemen PPBJ Perusahaan Pupuk. [Tugas Akhir]

Richo, Amirul Fiqry Optimasi Bentuk Haluan Kapal Perintis 1200 GT Terhadap Hambatan Kapal Menggunakan Metode Computational Fluid Dynamic. [Tugas Akhir]

Ridho, Dian Farades Analisis Pengaruh Kondisi Pengelasan Berangin pada Pipa HDPE dengan Metode Butt Fusion terhadap Sifat Mekanik dan Uji Hidrostatik. [Tugas Akhir]

Ridho, Labib Nugraha STUDY PERBANDINGAN PENGGUNAAN PROFIL BULB DENGAN PROFIL SIKU UNTUK BLOCK H07 PADA KAPAL LCU 1500 DWT. [Tugas Akhir]

Ridho, Nur Faturrachman Analisis Desain Selexol Regenerator 241-T9026 Terhadap Integritas Struktur Akibat Beban Seismik dan Beban Angin Pada Proyek Gas Development For The Unitization Of The Jambaran-Tiung Biru Field. [Tugas Akhir]

Ridlo, Widyo Nugroho ANALISA KEKUATAN MEMANJANG KAPAL PONTON LOA 100,5 METER. [Tugas Akhir]

Ridwan, Firmanto Analisa Kepuasan Pelanggan terhadap Kualitas Pelayanan Jasa Sewa Truck dengan Metode Importance Performance Analysis (IPA) dan Potential Gain IN Customer Value (PGCV) pada Perusahaan yang Bergerak di Sektor Logistik. [Tugas Akhir]

Ridwan, Santoso ANALISIS KEKUATAN JIG SUPPORT SINGLE POINT MOORIN 15.000 DWT PT. PERTAMINA TBBM BALONGAN. [Tugas Akhir]

Riefky, Nugraha Adhi Prototype Preteatment Penurun Kadar Phosphate Unit Laundry RSUD Dr. R Koesma Tuban Dengan Menggunakan Metode Presipitasi dan Filtrasi. [Tugas Akhir]

Rifka, Rabbani Ichsan Pembuatan Sistem Informasi Checklist dan Kebutuhan Data Audit Sistem Manajemen Keselamatan dan Kesehatan Kerja Menurut PP No. 50 Tahun 2012. [Tugas Akhir]

Rifki, Dita Wahyu Pradana Rancang Bangun Sistem Identifikasi Kelengkapan Alat Pelindung Diri (APD) Menggunakan Metode Convolutional Neural Network (CNN). [Tugas Akhir]

Rifky, Kurnia Putra Simulasi dan Optimasi Desain Pengecoran Cetakan Pasir pada Produk Idler Menggunakan Metode Taguchi. [Tugas Akhir]

Rifqi, Aqil Samudro Prototipe Sistem Cerdas pada Distribusi Air Bersih Berbasis Internet of Things dengan Metode Petri Net. [Tugas Akhir]

Rika, Agustin Ayu Permitasari Prototipe Monitoring Arus dan Tegangan Berbasis IoT pada Transfomator di PT. Semen Indonesia. [Tugas Akhir]

Rikad, Siswandita Yuliansah “PERENCANAAN DAN PERHITUNGAN PONTOON UNTUK MENGANGKUT EXCAVATOR PC200 DI PT. LINTECH SEASIDE FACILITY”. [Tugas Akhir]

Rike, Kusuma Putri Rancang Bangun Persimpangan Jalan Internal Industri Menggunakan Safety Distance Sensor dan Automatic Safety Bardi Perusahaan Asam Fosfat. [Tugas Akhir]

Rikma, Mila Ilmaya Optimasi kekerasan baja S45C pada proses hardening helical gear menggunakan metode taguchi. [Tugas Akhir]

Rinaldi, Sam Prabowo Evaluasi Penjadwalan Perawatan Mesin Hanger Shot Blast Kazo Dengan RCM II Dan MVSM (Studi Kasus : Foundry Plant Perusahaan Manufaktur). [Tugas Akhir]

Rinda, Fitriana Analisa Penentuan Harga Pokok Produksi Pada Fabrikasi Skid Winch System Dengan Metode Job Order Costing (Studi Kasus Pada Perusahaan Manufaktur Bidang Fabrikasi Dan Konstruksi). [Tugas Akhir]

Rinda, Wahyu Aningrum Analisa Perhitungan Harga Pokok Produksi Bogie 1014 dengan Metode Time Driven Activity Based Costing (TDABC) Analysis (Studi Kasus Pada Perusahaan Manufaktur Transportasi)”. [Tugas Akhir]

Risalatul, Fajarwati Sistem Pemantauan Dan Pengendalian Salinitas Pada Pemeliharaan Ikan Giru Di Akuarium Dengan Metode PID Berbasis Android. [Tugas Akhir]

Riska, Ailia Ulfrastina Analisis Perbandingan antara Variable Speed Drive dan Variable Speed Coupling pada Tangki Rotary Vacuum Filter (Studi Kasus di PG Ngadirejo). [Tugas Akhir]

Riska, Purwa Bastara Identifikasi Bahaya pada Pekerjaan Pemanasan di Perusahaan Minyak Pelumas dengan Menggunakan Metode HIRADC dan BCA. [Tugas Akhir]

Risky, Lestari Prabowo Penilaian Risiko pada Onshore Pipeline Menggunakan Metode Risk Based Inspection (RBI). [Tugas Akhir]

Risma, Fadilla Yusnianti Penilaian Risiko dengan Metode SWEHI pada Plant Amonia Pabrik Penghasil Pupuk dan Bahan Kimia di Gresik. [Tugas Akhir]

Rival, Ekananda Pengaruh Campuran Asam Sitrat Dan Asam Sulfamat Sebagai Alternatif Pembersihan Kerak Pada Pipa Material Carbon Steel. [Tugas Akhir]

Riyan, Ardi Prayuda Perencanaan Sistem Pompa Ballast pada Kapal Tanker 17.500 LTDW Pagerungan di PT. PAL Indonesia. [Tugas Akhir]

Riyan, Bagas Permana Analisis Perbandingan Elektroda ER 316L dan ER 347 Pada Pengelasan GTAW Stainless Steel 321 ke 316L Terhadap Mechanical Properties dan Laju Korosi. [Tugas Akhir]

Riza, Maulana Analisis Variasi Media Pendingin pada Repair dengan Metode Doubling Plate pada Pipa SA 312 Type 316L saat Inservice dengan Proses Pengelasan SMAW Terhadap Nilai Kekerasan, Struktur Mikro dan Laju Korosi. [Tugas Akhir]

Riza, Nur Alfuniam ANALISIS SLOSHING PADA TANGKI KAPAL TANKER KM “PUTERI ELOK” AKIBAT GERAKAN ROLLING PADA GELOMBANG REGULAR MENGGUNAKAN METODE CFD. [Tugas Akhir]

Rizal, Rachman Saputra Rancang Bangun Sistem Kontrol Suhu Busbar Berbasis Mikrokontroler. [Tugas Akhir]

Rizal, Septiyan Aziz Saputra Estimasi Kebutuhan Material Dan Jam Orang Pada Pemasangan Lambung Kapal TB. Harmony VII Blok I Di PT. Kukar Mandiri Shipyard. [Tugas Akhir]

Rizal, Zulqurna'in ANALISA PENGARUH VARIASI BENTUK BURITAN KAPAL TERHADAP HAMBATAN TOTAL PADA KAPAL TWIN SCREW PROPELLER MENGGUNAKAN METODE CFD. [Tugas Akhir]

Rizka, Lutfita Hanastasia Efisiensi Penurunan Logam Berat Pb pada Limbah Cair melalui Metode Kombinasi Elektrokoagulasi – Adsorbsi Menggunakan Karbonasi Biji Alpukat. [Tugas Akhir]

Rizki, Ahmad Rizaldi Analisa performa pompa sentrifugal floating dock V Surabaya di PT.Dok dan Perkapalan Surabaya. [Tugas Akhir]

Rizki, Dwi Praptiwi Analisis Kecelakaan Kerja Dengan Menggunakan Metode Event and Causal Factor Analysis (ECFA) Dan Mini-MORT di Pabrik Gula. [Tugas Akhir]

Rizki, Dwi Rachmadi Analisa Pengaruh Diameter Filler Kuningan Dalam Proses Pengelasan OAW Ditambah Boraks Terhadap Sifat Mekanis Pengelasan Pada Repair Daun Propeller. [Tugas Akhir]

Rizki, Dwi Rachmadi Analisa Pengaruh Diameter Filler Kuningan Dalam Proses Pengelasan OAW Ditambah Boraks Terhadap Sifat Mekanis Pengelasan Pada Repair Daun Propeller. [Tugas Akhir]

Rizki, Surya Lesmana Prototype Produksi Biogas. [Tugas Akhir]

Rizky, Laila Febriana Analisis Perencanaan Pengendalian Persediaan Bahan Baku Sepeda AT 8855 20'' Menggunakan Metode Material Requirement Planning dengan Pendekatan Teknik Lot Sizing. [Tugas Akhir]

Rizky, Prihardhana Hubungan Antara Tindakan Tidak Aman Dan Kondisi Tidak Aman Serta Pengaruhnya Terhadap Kecelakaan Kerja Di Pembangkit Listrik Tenaga Uap. [Tugas Akhir]

Rizqi, Darmawan Perancangan Subsurface Foam Injection Pada Kerosene Storage Tank 920-T-002B Dengan Pendekatan Metode Benefit Cost Ratio Perusahaan Industri Petrokimia Tuban. [Tugas Akhir]

Robbi, Firmansah Analisa Performa Pompa Piston Setelah Dilakukan Perbaikan Pada Pump Test Di Lab Fluida Politeknik Perkapalan Negeri Surabaya. [Tugas Akhir]

Rodiyah, Insani Kamila Perancangan Storage Tank Dengan Internal Floating Roof Kapasitas 50.000 KL Pada Proyek PT BBI. [Tugas Akhir]

Rohimawan i, Puruhito Pambud STUDI NUMERIK PENDINGINAN UDARA PADA KANDANG SAPI KAPAL TERNAK MENGGUNAKAN (CFD) COMPUTATIONAL FLUID DYNAMIC. [Tugas Akhir]

Romadhon, Agung Prastyo Aji Analisa Gangguan Pada Fasa – Ground Kabel Transformator TR14 20KV/6KV (Studi Kasus Di PT. Petrokimia Gresik). [Tugas Akhir]

Roni, Hadyan Saputra Prototype Pengendali Steering Gear Menggunakan PID Pada Kapal Coaster 1200 DWT. [Tugas Akhir]

Rosita, Dewi Pratiwi Perancangan Dan Pembuatan Mesin Roll Press Cutting Otomatis Penggiling Adonan Mie. [Tugas Akhir]

Rosyid, Sidiq Yanuardi Analisis Spot Welding Menggunakan Metode TIG Spot Welding Sebagai Pengganti Spot Welding Konvensional Pada Material Stainless Steel Tipe 304. [Tugas Akhir]

Rosyita, Firdaus Rekayasa Tata Letak Mesin CNC Laser Trumpf L3030 dan Fasilitas Produksi di PT. Dempo Laser Metalindo. [Tugas Akhir]

Rudi, Nur Huda Analisa Perbandingan Penggantian Pompa Roda Gigi Dengan Pompa Sentrifugal P-106 Ditinjau Dari Efisiensi Dan Peforma Terhadap Fluida Oli. [Tugas Akhir]

Rudi, Setiawan Analisis Variasi Jumlah Layer Activated Flux Dan Mixturing Shielding Gas Pengelasan A-TIG SA 240 Tipe 316L Terhadap Kedalaman Penetrasi, Nilai Kekerasan Dan Struktur Mikro. [Tugas Akhir]

Rudianto, Rudianto Desain LNG Storage Tank dan Sistim Refrigerasinya untuk Mobil Berbahan Bakar Gas. [Tugas Akhir]

Ryan, Bagus Wiranata Rancang Bangun Pengendalian Mesing Web Pada Proses Winding Kertas Berbasis Arduino Dengan Menggunakan Metode Fuzzy Gain Scheduling-PID. [Tugas Akhir]

Ryan, Dinata Priyo Pamungkas Pengaruh Proses Painting Primer Dan Top Coat Terhadap Daya Rekat Cat Pada Baja A 36. [Tugas Akhir]

SATRIA, WIYATAMA ADHI NUGRAHA REDESAIN POMPA FLUSHING PADA SISTEM LUBRICATING OIL DI PT. PAL INDONESIA (PERSERO). [Tugas Akhir]

SEPTIN, FITRININGTYAS ANALISA PERFORMANSI POMPA SENTRIFUGAL SUNDYNE P1500 TERHADAP PERGANTIAN INDUCER IMPELLER DI AREA 400 PT.ALP PETRO INDUSTRY. [Tugas Akhir]

SINGGIH, DANU PRIBADI PENGARUH KINERJA CYLINDER LINER PRESSURE DAN PENURUNAN TEKANAN MINYAK PELUMAS TERHADAP DAYA PADA AUXILIARY ENGINE MWM TBD V8 MV. MERATUS PALEMBANG. [Tugas Akhir]

Sabdan, Hutomo Widyarso Perbandingan Protokol MQTT Dan Protokol HTTP Yang Diimplementasikan Pada Multiple I/O. [Tugas Akhir]

Sabrina, Rahmadhanty Analisis Probabilitas Human Error Pada Proses Pekerjaan Pengelasan MIG (Metal Inert Gas) Dengan Menggunakan Metode SPAR-H dan FTA Pada Perusahaan Galangan Kapal. [Tugas Akhir]

Safira, Istighfari Aplikasi Enceng Gondok (Eichhornia crassipes) dan Kayu Apu (Pistia stratiotes) dalam Menurunkan Kadar BOD, COD, dan Phospat pada Air Limbah Laundry. [Tugas Akhir]

Safira, Majma'al Bachrain Pengendalian Penggunaan Daya Listrik Menggunakan Metode Decision Trees Berbasis Android Dan Web Beserta Analisa Pengaruh Harmonisa Terhadap Nilai Faktor Daya. [Tugas Akhir]

Samuel, Dwi Wibowo Kombinasi Fire Dynamic Simulator dengan Pathfinder untuk Perencanaan Simulasi Modeling ERP di Gedung J PPNS. [Tugas Akhir]

Sandy, Amrullah Analisa Konstruksi Pada Modifikasi Penambahan Panjang Backhoe Deck LCB. Brahma Galaxy di PT. DOK Pantai Lamongan. [Tugas Akhir]

Sandy, Kurnia Jati Analisa Pengaruh Kuat Arus Dan Time Interval Terhadap Struktur Mikro, Nilai Kekerasan, Ketahanan Korosi Pada Pengelasan GTAW Mode Pulse Material SUS 201 Dan SUS 304. [Tugas Akhir]

Sarah, Putri Pratiwi KAJIAN NUMERIK MMG DAN EKSPERIMEN KEMAMPUAN MANUVER KAPAL. [Tugas Akhir]

Sari Cahya, Nikmatus Sholicha Analisis Pengaruh Faktor Individu dan Psikososial Terhadap Tingkat Risiko MSDs Pada Pekerja Pencucian Belerang di Industri Asam Fosfat. [Tugas Akhir]

Sarlita, Pigafeta Rancang Bangun Kursi Ergonomi Untuk Operator Mesin Bor di Industri Manufaktur. [Tugas Akhir]

Satria, Alvanhuri Firdaus Analisa Penggunaan Filler Metal ER NiCrMo-3 sebagai Pengganti Filler Metal ER 309L dan ER 316L dan Perbedaan Arus pada Proses Pengelasan Overlay GTAW SA106 Gr B terhadap Ferrite Content... [Tugas Akhir]

Satria, Azma Nur Alam Pengaruh Preheat dan PWHT Pada Pengelasan Material API 5 CT Grade K-55 Terhadap Kekerasan, Ketangguhan Dan Mikrostruktur. [Tugas Akhir]

Satria, Nusantara Analisa Kebutuhan Material Sandblasting dan Painting pada Reparasi Pengecatan Kapal Tongkang Bahari Perdana 015. [Tugas Akhir]

Sekar, Ayu Kinasih ANALISA PERBANDINGAN KEBUTUHAN PLAT, JAM KERJA DAN BIAYA PADA REPLATING KAPAL KM. HARI BARU SECARA PERENCANAAN DAN PELAKSANAAN DI PT. TAMBANGAN RAYA PERMAI. [Tugas Akhir]

Sendy, Maulana Pratama Analisa Pengaruh Sudut Exit, Sudut Entry, dan Besar Radius Natural Bend Terhadap Efektifitas Desain Horizontal Directional Drilling (HDD) Secara Teknis dan Ekonomis. [Tugas Akhir]

Septaviola, Dini Utami DESAIN INTERIOR KAPAL PENYELAMAT BERBASIS KAPAL PATROLI DENGAN KONSEP SUMATRA KONTEMPORER. [Tugas Akhir]

Septian, Firdaus Yoga Pratama Studi Teknis Kelayakan Desain Area Buried Pipe Menembus Rel Kereta Api Pada Pipa Jaringan Gas. [Tugas Akhir]

Septian, Wahyu Saputra Deteksi Kelayakan Oli dan Filter pada Gearbox Kapal dengan Metode SVM ( Support Vector Machine ) Berbasis Mikrokontroler. [Tugas Akhir]

Septyaningrum, Dwi Putri Studi Kasus Acoustic Induced Vibration (AIV) pada Sistem Flare Project MCL EPC 3, Banyu Urip. [Tugas Akhir]

Setia Rahayu, Azizzah Analisa Optimalisasi Proyek Pembangunan Kapal Kayu 30 GT dengan Metode PERT dan Crashing Project Di PT. Empat Sekawan Marine. [Tugas Akhir]

Seybett, Serutti Analisis Perbandingan Stabilitas Penggunaan Material Aluminium dan Fiberglass pada Fishing Boat 9,5 meter. [Tugas Akhir]

Shalina, Al Shafirah Sistem Monitoring dan Kontrol Plant Air Receiver dengan Metode Fuzzy Logic dan Support Vector Machine. [Tugas Akhir]

Shanditya, Fitrian Analisis Variasi Flowrate Gas dan Effect Of Torch Angle Pada Posisi Pengelasan 2G Pipa Material CuNi Terhadap Porositas. [Tugas Akhir]

Shandy, Rahman Septian Analisis Tegangan Lokal Maksimum Struktur Yoke Sebagai Pengganti Hawser Rope pada Sistem Tambat FSO Terhadap Single Point Mooring. [Tugas Akhir]

Sheila, Noor Analisis Penilaian Risiko Ergonomi pada Pekerjaan Manual Handling di Unit Produksi WP Plan. [Tugas Akhir]

Shela, Risca Khoirum Amanda Analisa Pengecatan Lambung Kapal Tanker 17500 DWT. [Tugas Akhir]

Shinta, Muhammida Pengembangan Aplikasi JSA, Safety Permit serta Pengawasan APD pada Perusahaan Peleburan Baja Berbasis Website dan Android. [Tugas Akhir]

Shintha, Lailatul Maghfiroh Identifikasi Kegagalan dan Perhitungan Nilai Keandalan Mesin CNC JOBS LINX 30 COMPACT. [Tugas Akhir]

Shintya, Vrapitasari Laksono Sistem Pembayaran Tol Menggunakan QR-Code Berbasis Mikrokontroler Dengan SMS Gateway Dan Email Sebagai Notifikasi. [Tugas Akhir]

Sifrina, Nur Baiti Analisa Pengaruh Sulfamic Acid dan Citric Acid Sebagai Pembersih Kerak Terhadap Kekuatan Material Pipa. [Tugas Akhir]

Sigma, Afrizal Maulana Analisa Pengaruh Variasi Flowrate Dan Shielding Gas Pada Pengelasan Gtaw Dengan Material Stainless Steel Jenis Austenitic Stainless Steel Type 304 Terhadap Metallography Dan Laju Korosi. [Tugas Akhir]

Sihmaulana, Dwianto Rancang Bangun Kontruksi Mesin Flame Cutting Portable Dan Flexible Semi Otomatis Menggunakan Las OAW. [Tugas Akhir]

Silma, Nurisshobakh Analisa Kualitas Pelayanan dengan Integrasi Servqual dan Kano pada Perusahaan Jasa Pelayaran Niaga. [Tugas Akhir]

Singgih, Rahma Gunarso Desain Penyediaan Sistem Air Bersih dan Air Panas pada Apartemen Menara Rungkut (Surabaya). [Tugas Akhir]

Sinta, Nurjannati Penilaian Risiko pada Argon Purification Unit dengan Metode Fuzzy-based Hazard and Operability Analysis (HAZOP) di Perusahaan Gas. [Tugas Akhir]

Sinta, Oktafiana Putri PENERAPAN NETWORK PLANNING UNTUK OPTIMASI WAKTU DAN BIAYA GENERAL OVERHAUL MESIN INDUK CATERPILAR 3406 DITA PADA KAPAL PANDU MPI.S-045 DI PT. PELINDO MARINE SERVICE. [Tugas Akhir]

Sintia, Novilia Putri Analisis Keputusan Perencanaan Pemeliharaan Mesin Repair Kapal dengan Metode Markovian Decision Process dan Overall Equipment Effectiveness (Studi Kasus pada PT. Tambanganraya Permai). [Tugas Akhir]

Siti, Alrisya Ruwanti Perancangan Instalasi Pemadam Kebakaran Pada Bagasse House di Pabrik Gula PTPN X Menggunakan Software EPANET 2.0. [Tugas Akhir]

Siti, Fatimatuz Zahro' Desain dan Fabrikasi Underwater Turbine Portable dengan Model Turbin Savonius. [Tugas Akhir]

Siti, Meimunah MODIFIKASI DESAIN FRAME GANGWAY DARI SWING DOOR MENJADI SLIDING DOOR PADA KERETA TIPE WJC BANGLADESH. [Tugas Akhir]

Sri, Widya Susanti MODIFIKASI PARTISI UNTUK PERMUDAHAN MAINTENANCE FUEL TANK MENGGUNAKAN SISTEM KNOCK DOWN PADA KERETA WPC. [Tugas Akhir]

Suci, Wulandari Pemanfaatan Microbial Fuel Cell sebagai Penghasil Energi Listrik Alternatif dan Pengolahan Limbah Cair IPLT Keputih, Surabaya. [Tugas Akhir]

Suhardjito, Gaguk Analisa Penjadwalan Produksi Speedboat Ambulance dengan Metode Fast Track dan Crash Program pada PT. Empat Sekawan Marine. [Tugas Akhir]

Sukma, Nurul Hidayati Pembuatan Prototype Sistem Informasi Pengadaan Barang Menggunakan Metode Use Case Driven Object (Studi Kasus: PT. ASDP). [Tugas Akhir]

Sulthan, Hamdan Muhammad Online Monitoring Dan Kontrol Refurbish Hole Machine Menggunakan Metode Neural Network. [Tugas Akhir]

Sulthon, Arif Rancang Bangun Hybrid Power Plant pada Aerator Menggunakan Energi Matahari dan Generator Set dengan Kendali Jarak Jauh. [Tugas Akhir]

Sundaram, Sundaram Perhitungan Human Error pada Kecelakaan Combine Tractor Terminal (CTT) saat Pengangkutan Petikemas. [Tugas Akhir]

Sunoto, Hadi Muhamad Pratomo Analisa Penggunaan Crushed Slag sebagai Flux pada Pengelasan SAW terhadap Komposisi Kimia, Struktur Mikro dan Nilai Kekerasan Material SA-36. [Tugas Akhir]

Surya, Ardli Putro Nugroho Analisis Preheat Pengelasan SMAW Pada Steel Casting SCW 49 Terhadap Ketangguhan, Kekerasan Dan Struktur Mikro. [Tugas Akhir]

Surya, Deny Wijaya Pengaruh Variasi Susunan Layer dan Konsentrasi Resin FRP (Fiber reinforced Plastic) Terhadap Laju Korosi pada Media Asam Phosphat. [Tugas Akhir]

Suthoni, Yoga Firiambodo Pengaruh Welding Parameter Terhadap Shear Strength dan Metallography pada Spot Welding Material SA-240 Type 201 dengan SA-240 Type 304. [Tugas Akhir]

Swissty, Wulandari Perancangan Alat Bantu Perakitan Band Brake Dari Windlass Untuk Mengurangi Resiko Cedera Musculoskeletal Disorders (MSDs) Pada Pekerja di PT.PINDAD. [Tugas Akhir]

Syafrizal, Carnov Purwanto Penilaian Risiko Postur Kerja Menggunakan Metode Workplace Ergonomic Risk Assessment dan Perbaikan Stasiun Kerja Pekerjaan Perakitan Tulangan pada Perusahaan Pembuat Beton. [Tugas Akhir]

Syaiful Anam, Anam ANALISA TEGANGAN KONSTRUKSI HELIDECK DAN KOREKSI NILAI SAFETY FACTOR YANG TELAH DIIJINKAN OLEH BKI PADA KAPAL PATROLI YUDISTIRA 73 METER. [Tugas Akhir]

Syaifullah, Hamim Thohari Studi Numerik Pengaruh Conical Strip Inserts Terhadap Perpindahan Panas Dalam Tube Economizer Pada Heat Recovery Steam Generator (HRSG) di Gresik Gas Cogeneration Plant (GGCP). [Tugas Akhir]

Syajarotul Aliyah, Ni’matus Analisa Kinerja Bongkar Muat Dengan Lean Six Sigma Untuk Mengurangi Demurrage Di Pelabuhan Pt. Petrokimia Gresik. [Tugas Akhir]

Syamsul, Fatah Maulana Analisa Kekuatan Skirt Structure Akibat Adanya Perubahan Konstruksi pada Single Point Mooring. [Tugas Akhir]

Syukron, Firmansyah STUDI TEKNIS DAN EKONOMIS PENGGUNAAN MESIN DIESEL TRUK (LAND USE) SEBAGAI PENGGERAK KAPAL PANDU. [Tugas Akhir]

TAUFIQURRAHMAN, TAUFIQURRAHMAN PERENCANAAN KEBUTUHAN DAYA MESIN PENGGERAK KAPAL MOORING BOAT 14 METER. [Tugas Akhir]

Tanggon, Satrya Bahari Analisis Pengelasan Repair Pada Sulfur Storage Tank SA 240 TYPE 304 Dengan Metode Doubling Plate Repair. [Tugas Akhir]

Tanika, Safira Amalia Izzati ANALISIS PENGARUH PENAMBAHAN BULBOUS BOW TERHADAP TAHANAN KAPAL CPO BARGE 3500 TON. [Tugas Akhir]

Tarwiyono, Santoso Smartboat Berbasis Peta Persebaran Ikan Dan Radio Frekuensi. [Tugas Akhir]

Tetuko, Muhibbuddin Endarwansyah Analisis Pengaruh Preheat Terhadap Microstructure dan Mechanical Properties Pengelasan Tie-In Water Inside pada Carbon Steel. [Tugas Akhir]

Thariq, Ahmad Zuhair Rancang Bangun Sistem Mekanisme Flame Cutting Berbasis Arduino dengan Metode Pantograph. [Tugas Akhir]

Tita, Retnoviati Analisis Pengaruh Faktor Individu dan Iklim Keselamatan terhadap Perilaku Keselamatan Pekerja Pemeliharaan di Industri Asam Fosfat. [Tugas Akhir]

Titis, Mudi Legowo Jati Analisis Kegagalan Shperical Roller Bearing Pada Roll Table Continuous Casting Machine. [Tugas Akhir]

Tito, Bagas Pratama Pengaruh Variasi Kuat Arus dan Flow Rate pada Stainless Steel SA240 TP304 Dengan Proses Las GMAW Menggunakan Metode Plug Welding. [Tugas Akhir]

Titries, Adistantria Mariami Analisis Laju Korosi dan Lifetime Pipa ASTM A105 dengan Perbandingan Inhibitor NaNO2 dan Na2CrO4. [Tugas Akhir]

Tomy, Prabowo Analisa Unjuk Kerja Motor Diesel 4 Langkah 1 Silinder Berbahan Bakar Campuran Biosolar dan Pertamax 92. [Tugas Akhir]

Tri, Ayuning Sari REDESAIN KAPAL KERUK KATAMARAN SEBAGAI KAPAL PEMBERSIH SUNGAI DI PERKOTAAN. [Tugas Akhir]

Trias, Mankhus Kholis ANALISA PENURUNAN PEFORMA POMPA SENTRIFUGAL P 2401 A TYPE 8-6 F1AH GM V/L 8VCM HL UNTUK PROSES FILTRATION DI PT PETROKIMIA GRESIK. [Tugas Akhir]

Trio, Andika Putra Prototipe Perangkat Portabel Navigasi Nelayan Untuk Menemukan Lokasi Sebaran Ikan. [Tugas Akhir]

Tsanil, Falah Analisa Pengaruh Faktor Individu Dan Faktor Psikososial Terhadap Kelelahan Kerja Pekerja Pengemasan Produk Di Perusahaan Beverages. [Tugas Akhir]

Tya, Dwi Rahayu Waningsih Analisis Risiko Kebocoran pada Sulfur Furnace Pabrik Asam Sulfat di Perusahaan Penghasil Pupuk. [Tugas Akhir]

Ulya, Ganeswara Alamy Modifikasi Konstruksi Provision Crane Kapasitas 0,5T x 5M pada Landing Ship Tank AT-4 di PT Pindad (Persero). [Tugas Akhir]

Umi, Fadhilah Scheduling pada Proyek Pemindahan dan Pembangunan High Pressure Vertical Separator di Perusahaan Produksi Gas Alam. [Tugas Akhir]

Umi, Nur Pujiati Hartono ANALISA PENGARUH TRIM TERHADAP JARAK PANDANG KAPAL. [Tugas Akhir]

Umrotus, Syadiyah Perancangan Ulang Instalasi Sistem Pemadam Kebakaran Hydrant pada Industri Plasticizer untuk Memenuhi SNI. [Tugas Akhir]

Vega, Aditya Permana Wibowo Kajian Kekuatan Dan Kelelahan Struktur Pada Sistem Tambat Antara Single Point Mooring & Floating Storage and Offloading. [Tugas Akhir]

Vena, Rizky Pusparani Perancangan Sistem Pemanas Ruangan dan Sistem Sprinkler pada Laboratorium Plumbing Politeknik Perkapalan Negeri Surabaya. [Tugas Akhir]

Vera, Indah Sari Analisis Kinerja High Pressure Feedwater Heater #8 Unit 3 Tipe Shell and Tube di PLTU PT. PJB Unit Pembangkitan Gresik dengan Metode Log Mean Temperature Difference (LMTD). [Tugas Akhir]

Verdian, Rafshanjani Afnan Redesain Sistem Pendingin Dual Function Sebagai Fish Storage dan Fish Dryer. [Tugas Akhir]

Vinky, Try Octavia Proses Produksi Pembuatan dan Perakitan Mesin Pencacah Plastik. [Tugas Akhir]

Viska, Al Diana Analisa Sensitivitas Pengujian Magnetic Particle pada Cacat Buatan yang Dilapisi Coating. [Tugas Akhir]

Vita, Liandari ANALISA PENGARUH METODE DRY BLAST,VAPOR BLAST DAN POWER TOOL CLEANING TERHADAP KEKUATAN ADHESIVITAS COATING. [Tugas Akhir]

Vitalia, Dian Novita Analisis Perbandingan Teknis dan Ekonomis Sistem ICCP Menggunakan Variasi Peletakan Groundbed pada Line Pipa Gas Pabrik 3 PT. PUPUK KALTIM. [Tugas Akhir]

Vivi, Rahmania Pengendalian Posisi Boiler Furnace TV (Thermal CCTV) Pada Steam Power Plant Berdasrkan Thermography Analysis dan Neural Network. [Tugas Akhir]

Vivi, Saroyini Perancangan Ulang Gudang Penyimpanan Bahan Baku B3 pad Pabrik Chemical Perusahaan Formulator Pestisida. [Tugas Akhir]

Vivie, Sholichatin Nafi'ah Analisa Produktivitas, Profitabilitas, dan Investasi Bisnis pada Divisi Forwarding Perusahaan Jasa Logistik dengan Metode APC. [Tugas Akhir]

Wahyu, Alprianto Estimasi Daya Photovoltaic Berbasis Metode Jaringan Syaraf Tiruan Backpropagation. [Tugas Akhir]

Wahyu, Setyo Pambudi ANALISA PENGGUNAAN GAS SPRING PADA ENGINE HATCH COVER KAPAL PATROLI 12 M. [Tugas Akhir]

Wahyu, Tri Handoko Rancang Bangun Sistem Pengujian Kenaikan Suhu Transformator Produksi Berbasis IoT (Studi Kasus di PT. Bambang Djaja). [Tugas Akhir]

Wahyu, Wismadya Rahadian ANALISA PERBANDINGAN KEBUTUHAN PELAT BAJA ANTARA PERENCANAAN DENGAN PELAKSANAAN DI LAPANGAN PADA PEMBUATAN RAMP DOOR KMP. TONGKOL. [Tugas Akhir]

Wahyudi, - Analisa Pengaruh Filler dan Variasi Flowrate Terhadap Sifat Mekanik Pada Pengelasan GMAW Aluminium 5083. [Tugas Akhir]

Wahyuningsih, . Analisa Break Even Point Pengadaan Kapal Ferry Ro-Ro 1100GT Rute Pelayaran Ulee Lheue – Balohan. [Tugas Akhir]

Wida, Putra Cahyanto Rancang Bangun Monitoring Pengujian Generator Set Berbasis Internet of Things (IoT). [Tugas Akhir]

Widi, Ageng Purbaya Analisa Pengaruh Radius Miter Bend Terhadap Nilai Laju Erosi Aliran Dua Fase (Udara-Partikel Fly Ash). [Tugas Akhir]

Widya, Fitriani Evaluasi Kegiatan Perawatan Menggunakan Reliability Centered Maintenance II dan Pemilihan Solusi Menggunakan Metode Benefit-Cost Analysis Pada Heater Perusahaan Petrokimia Tuban. [Tugas Akhir]

Widya, Wulansari ANALISA PERBANDINGAN ANTARA JUMLAH DATA DOCKING PLAN DENGAN DATA REALITA PENGEDOKAN KAPAL DI FASHARKAN SURABAYA. [Tugas Akhir]

Widya Prasti, Fifin Analisa Perbaikan Penjadwalan Proyek Pembangunan Kapal Kelas 1 Kenavigasian Pada Perusahaan Galangan Kapal Di Gresik. [Tugas Akhir]

Wijayanti, Eka Yulianto Analisis Perbandingan Ekonomis Pengendalian Korosi Dengan Menggunakan Metode ICCP Dan SACP Pada Proyek Pipeline Gas Transmisi Gresik-Semarang. [Tugas Akhir]

Wijiani, Astuti Rancang Bangun Pemodelan Karakteristik Termoelektrik untuk Menentukan Pengoperasian Optimal Panen Energi Pada Generator Set Kereta Pembangkit. [Tugas Akhir]

Wike Dinda, Anggraini Supriyo ANALISIS PENGARUH PENGGUNAAN CHINED HULL DAN ROUNDED HULL TERHADAP HAMBATAN KAPAL CPO BARGE 3500 TON. [Tugas Akhir]

Wimbo Wiharso, Ghalib Analisis Total Productive Maintenance Dengan Menggunakan Metode Overall Equipment Effectiveness Dan Six Big Losess Pada Container Crane. [Tugas Akhir]

Winanto, - Studi komparasi unjuk kerja multi swirl combustion system (MSCS) piston chamber dan flat piston chamber pada mesin diesel. [Tugas Akhir]

Winda, Puspitasari Pengaruh Faktor Pekerja dan Faktor Pekerjaan Terhadap Tingkat Kelelahan Kerja pada Area Cetak Pabrik Pengecoran. [Tugas Akhir]

Windha, Novin Arlistha Identifikasi Bahaya Pada Boiler SB - 02 Menggunakan Metode HAZOP Dan FMEA di Perusahaan Minyak Goreng. [Tugas Akhir]

Winna, Andriana Analisis Safety Integrity Level dengan Metode FMEA dan FTA pada Kompresor di Pembangkit Listrik Tenaga Panas Bumi. [Tugas Akhir]

Wira, Kusuma Halim Studi Numerik Peningkatan Kinerja Turbin Air Rotor Savonius Sumbu Horizontal. [Tugas Akhir]

Wirda, Laily Pembuatan Aplikasi Pelaporan Job Safety Observation, Live Audit Dan Nearmiss Berbasis Android Pada Perusahaan Pembangkit Listrik Di Paiton. [Tugas Akhir]

Wisnu, Priambodho Rancang Bangun Alat Sistem Pengendalian Asap Pada Ruangan Bebas Asap Dengan Menggunakan PWM Berbasis Android. [Tugas Akhir]

Wisnu, Priambodo Desain Jalur Pipa dari Flare Knockout Drum 43MBD 301/401 Menuju Flare Stack. [Tugas Akhir]

Wiwik, Kurniati Analisis Shock Hazard, Arc Flash Serta Arc Blast Pada MDP, Transformator 500kVA, 1000kVA Berdasarkan NFPA 70E 2015 dan Teori Pendekatan Ralph Lee. [Tugas Akhir]

Wiwit, Akhmadi Ruzhan Rancang Bangun Dudukan Mesin Diesel Kapasitas 3,6 kW pada Kapal Kecil untuk Mereduksi Getaran. [Tugas Akhir]

Wulan, Dwi Rahmawati Analisis Probabilitas Human Error</i> Pada Proses Pekerjaan Pemasangan Bekisting Kolom dengan Menggunakan Metode SPAR-H di Proyek Konstruksi. [Tugas Akhir]

YAHYA, CAHYA HUDAYA ANALISA PERFORMA POMPA SENTRIFUGAL P2510A TYPE LCF40/250 PADA SLUDGE SYSTEM. [Tugas Akhir]

YUSRIZAL, FIQRI HAYKAL PERHITUNGAN ULANG POMPA SWRO PADA WATER TREATMENT PLANT DENGAN KAPASITAS 2400 LITER/MENIT PADA PT TRANS PACIFIC PETROCHEMICAL INDOTAMA. [Tugas Akhir]

Yahya, Kharis Abidul Aziz Pengaruh Perlakuan Pada Permukaan Hasil Pengelasasan GTAW Stainless Steel 316L Terhadap Laju Korosi. [Tugas Akhir]

Yan, Aditya Ahmad Sadewa Penentuan SIL (Safety Integrity Level) pada Alat Coal Feeder dan Coal Mill dengan Penerapan Metode LOPA (Layer Of Protection Analysis) di Perusahaan Pupuk. [Tugas Akhir]

Yanniza, Galuh Kartika Hapsari Analisis Faktor yang Mempengaruhi Perilaku Keselamatan Kerja dan Keterlibatan Pekerja Pabrik Pengolahan Tembakau dengan Metode Structural Equation Modelling (SEM). [Tugas Akhir]

Yanuar, Laili Shaleha Rancang Bangun Mesin Roll Bending untuk Frame Jendela Kapal. [Tugas Akhir]

Yasmin, Anisah Rancang Bangun Mesin Pengering Bibit Jahe Merah Menggunakan Sistem Blower di PT. YRS. [Tugas Akhir]

Yasri, Fardiansyah Implementasi Safety Walkdown dan Hazard Nearmiss Report Berbasis Website di Perusahaan Pembangkit Listrik Tenaga Uap. [Tugas Akhir]

Yayang, Candra Ramadan ANALISIS TEKNIS DAN EKONOMIS PELAPISAN MATERIAL FIBERGLASS REINFORCED PLASTIC PADA KAPAL IKAN TRADISIONAL 20GT MENGGUNAKAN METODE HAND LAY UP. [Tugas Akhir]

Yazid Bustomi, Mohammad Evaluasi Penjadwalan Dan Pembiayaan Proyek Kapal Tradisional 30 GT. [Tugas Akhir]

Yekti, Arum Nas'alullaily Analisis Kecelakaan Dengan Menggunakan Metode Event And Causal Factors Analysis (ECFA) Dan Fishbone Analysis Pada Proyek Pembangunan Gedung Perkantoran. [Tugas Akhir]

Yoga, Adi Chandra Analisis Perubahan Struktur Mikro, Nilai Kekerasan dan Case Depth Akibat Pemanasan Ulang Pada Proses Pengerasan Permukaan Dengan Metode Karburisasi Padat Pada Baja Karbon Rendah. [Tugas Akhir]

Yoga, Eka Armanto Analisa Kebutuhan Rockwool Pada Insulasi Ruang Akomodasi KM Pangalengan. [Tugas Akhir]

Yogi, Kurniawan Prototype Motor Protection Relay Pada Motor Penggerak Head Pulley Konveyor Bottom Ash Berbasis Realtime Database. [Tugas Akhir]

Yogi, Setiawan Rancang Bangun Vacuum Clamp Sebagai Teknologi Pendukung Dalam Pengerjaan Kayu Pada CNC Router 3 Axis. [Tugas Akhir]

Yohannes, Hadi Yamlean PERANCANGAN SISTEM REFRIGERASI UNTUK BLAST FREEZER PADA KAPAL IKAN 200 GT. [Tugas Akhir]

Yopi, Tomi Setiawan Analisa Kekuatan Bantalan Poros Propeller Pada Kapal KM. Egon. [Tugas Akhir]

Yovy, Lukmana Inspeksi Cacat Dengan Liquid Penetrant Test Dan Prosedur Repair Pada Pengelasan Run Off Syrup Receiving Tank. [Tugas Akhir]

Yufi, Wuryandari Analisa Perbaikan Panel Motor Penggerak Fan Radiator di Kereta Pembangkit K3 Premium. [Tugas Akhir]

Yufi, Wuryandari Analisa Perbaikan Panel Motor Penggerak Fan Radiator di Kereta Pembangkit K3 Premium. [Tugas Akhir]

Yusfi, Ristia Putra Pengaruh Media Pendingin pada Pengelasan Duplex Stainless Steel SA790 UNS 31803 Terhadap Komposisi Fasa Ferrite Austenite dan Laju Korosi. [Tugas Akhir]

Yusuf, Aryasa Rancang Bangun Sistem Transmisi untuk Memaksimalkan Putaran Horizontal Turbine pada Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Portable. [Tugas Akhir]

Yusuf, Dwi Novianto ANALISA KEBUTUHAN LUASAN COATING KONSTRUKSI KAPAL BERDASARKAN LUASAN COATING KULIT DALAM SATU KOMPARTEMEN PADA KAPAL KONTAINER 100 TEUS H-381. [Tugas Akhir]

Yusuf, Nur Abidin Analisis Pengaruh Faktor Internal Dan Eksternal Operator CCR Terhadap Stres Kerja Pada Perusahaan Pembangkit Listrik Tenaga Uap. [Tugas Akhir]

Yusuf, Nurhuda ANALISA TEGANGAN CHAIN LINE SINGLE POINT MOORING TYPE CATENARY ANCHOR LRG MOORING (CALM) PADA AFRAMAX TANKER. [Tugas Akhir]

Yusuf, Rezandy Desain Sistem Perpipaan Air Bersih Pada Kapal Patroli. [Tugas Akhir]

Zaenab, Zaenab STUDI PERBANDINGAN DURASI DENGAN PENAMBAHAN JAM ORANG DAN METODE FAST TRACK PADA PROSES PENGGABUNGAN BLOCK KAPAL PERINTIS 2000 GT. [Tugas Akhir]

Zakaria, Iqbal Amrullah TS Analisa Hasil Refit-up Welding Menggunakan Plasma Cutting dan Machining pada Kapal Aluminium Terhadap Kekerasan, Struktur Mikro dan Laju Korosi. [Tugas Akhir]

Zakaria, Yusuf Identifikasi Bahaya Unit Acid Gas Removal pada Industri Minyak dan Gas Menggunakan Metode ETBA dan Bow-Tie Analisys. [Tugas Akhir]

Zakka, Putratama ANALISA PERBANDINGAN KEKUATAN PENGGUNAAN INLINE BRACKET DENGAN OVERLAP BRACKET. [Tugas Akhir]

Zalicha, Adellia Zulfianti ANALISA PERBANDINGAN TEKANAN AIRBAG PADA BENTUK DASAR KAPAL YANG BERBEDA KETIKA PROSES DOCKING. [Tugas Akhir]

Zamzam, Aziz Ridwan Pengaruh Preheat dan Holding Time Pwht Pada Pengelasan Material SA 213 T91 Terhadap Struktur Mikro dan Nilai Kekerasan. [Tugas Akhir]

Zana, Chobita Aratusa Penilaian Risiko Menggunakan Metode HIRADC Pada Proses Docking Kapal Dengan Airbag. [Tugas Akhir]

Zanuardi, Yahya Analisis Pengaruh Preheating pada Pengelasan GMAW Material Aluminium 5083 dengan Aluminium6082 pada Pembuatan Kapal Lcu terhadap Nilai Kekerasan dan Struktur Mikro. [Tugas Akhir]

Zaqi, Asshidiqi Analisa Nilai Pertambahan Panjang Material ST 37 Pada Mesin CNC Bending TRUMPF TruBend 5050 Menggunakan Metode Full Fctorial. [Tugas Akhir]

Zein, Ahmad Budiarta Analisis Variasi Konfigurasi Sambungan Las Terhadap Struktur Mikro dan Kekerasan Heat Affected Zone pada Baja Karbon. [Tugas Akhir]

Zona, Rezaddien Aqoba Identifikasi Safety Barrier Pekerjaan Hot Tapping Pipa Transmisi Gas Alam Menggunakan Metode DyPASI. [Tugas Akhir]

Zulfan Fahmi, Geva Aqviansyah ANALISIS PENGARUH VARIASI JARAK RUDDER DAN PROPELLER TERHADAP KEMAMPUAN THRUST MNGGUNAKAN METODE CFD ( STUDI KASUS KAPAL PERINTIS 1200 GT ). [Tugas Akhir]

aji, Bayu Nugroho Analisa Perbandingan Sifat Mekanik Material FRP ( Fiberglass Reinforced Plastic) Berbahan Serat Gelas Woven Roving dengan Multiaxial. [Tugas Akhir]

This list was generated on Sat Dec 5 13:48:05 2020 WIB.