Desain Pipa Loading Arm NH3 PT. Petrokimia Gresik

Design of loading arm pipe NH3 at PT. Petrokimia Gresik

Muhammad Hamdan (6811040026)


Abstrak

-Loading arms is one of a facilities in jety that use in loading and unloading process from the ship to a storage tank. In the process of transfer of NH3 in the dock PT. Petrokimia Gresik still use a flexible hose. Excess loading arm compared to a flexible hose that is easier operation, practical and time efficient. It is also equipped with Emergency Release System to avoid spillage charge during an emergency. from the above problems is necessary for the manufacture of loading arm to dock that still uses a flexible hose. Calculations were performed include pressure drop, thermal loses / heat gain and thermal stress due to temperature load. Structure is needed to sustain a series of pipe loading arms. Pipe design calculations of loading arms refers to ASME B31.3 where loading arm including terminal facilities. From the results, obtained form the design of the pipe loading arms is 4.8 x 5 x 5 for riser, inboard and outboard. Pressure drop -36,272.5 Pa when the ship's position is maximum and minimum 16782.48 Pa. Heat gain before the insulation is 7238.5 w and 228.2 w once installed insulation thickness of 0.06 m. Thermal stress is maximum at node 160 of 155 224 KPa and a minimum of 3.6 KPa at node 200. The maximum deflection occurring at arm structure of 0.004 m downwards. On the riser of 0.004 m in the direction of the Z axis and 0.00057 m to the -X axis direction. Keywords: Loading arm, a series of pipes, Heat gain, Structure


Abstract

- Loading arm merupakan salah satu fasilitas dermaga dalam proses bongkar muat dari kapal ke tangki penyimpanan. Pada proses transfer NH3 di dermaga PT. Petrokimia Gresik masih menggunakan fleksible hose. Kelebihan loading arm dibandingkan fleksible hose yaitu pengoperasian yang lebih mudah, praktis dan efisien waktu. Selain itu juga dilengkapi Emergency Release System untuk menghindari tumpahan muatan saat keadaan darurat. Dari permasalahan di atas diperlukan adanya pembuatan loading arm untuk dermaga yang masih menggunakan fleksible hose. Perhitungan yang dilakukan meliputi pressure drop, thermal loses / heat gain dan thermal stress material akibat temperatur muatan. Structure diperlukan guna menopang rangkaian pipa loading arm. Perhitungan desain pipa loading arm mengacu pada ASME B31.3 dimana loading arm termasuk fasilitas terminal. Dari hasil desain, didapatkan bentuk rangkaian pipa loading arm 4,8 x 5 x 5 untuk riser, inboard, dan outboard. Pressure drop sebesar -36272,5 Pa pada posisi kapal maksimum dan 16782,48 Pa saat minimum. Heat gain sebelum insulasi sebesar 7238,5 w dan 228,2 w setelah dipasang insulasi setebal 0,06 m. Thermal stress maksimum berada di node 160 sebesar 155224 KPa dan minimum 3,6 KPa di node 200. Maksimum defleksi yang terjadi pada structure arm sebesar 0,004 m ke arah bawah. Pada structure riser sebesar 0,004 m ke arah sumbu Z dan 0,00057 m ke arah sumbu ?X. Kata Kunci : Loading arm, rangkaian pipa, Heat gain, Structure.


Detil Peneliti

Dosen Pembimbing 1 :Wahyudi
Dosen Pembimbing 2 : Subagio Soim

Program Studi : D4 - TEKNIK PERPIPAAN
Angkatan : 2011


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.