PERHITUNGAN PENGERJAAN FABRIKASI JALUR PERPIPAAN DARI BOILER MENUJU TURBIN DI PG. GEMPOLKREP, MOJOKERTO

CALCULATION OF FABRICATION WORK ON PIPING LINE FROM BOILER TO TURBINE AT PG. GEMPOLKREP, MOJOKERTO

Billi Ardiansyah (6811040013)


Abstrak

Jalur perpipaan boiler Yoshimine 1 menuju turbin alternator pada PG. Gempolkrep, Mojokerto digunakan sebagai pembangkit listrik. Tekanan dari uap yang diproduksi adalah 20 kg/cm2 dengan temperatur sekitar 350oC dan debit 1,35 m3/s. Uap superheated yang dihasilkan boiler akan dikumpulkan atau disimpan di HPSH (High Pressure Steam Header), untuk disalurkan ke turbin alternator. PG. Gempolkrep, Mojokerto sudah mengalami banyak pengembangan disisi instrumentasi dikarenakan sistem perpipaan dari boiler Yoshimine 1 menuju turbin alternator mengalami masalah penurunan tekanan. PG. Gempolkrep, Mojokerto dalam pengerjaan fabrikasi kurang adanya manajemen pengerjaan. Jalur boiler Yoshimine 1 menuju turbin alternator merupakan jalur vital terhadap kelangsungan produksi pabrik, sehingga manajemen pengerjaan fabrikasi harus terjadwal dan terstruktur. Berdasarkan persoalan tersebut pengerjaan fabrikasi desain eksisting dan desain ulang perlu manajemen pengerjaan yang harus terjadwal dan terstruktur. Oleh sebab itu perlu dilakukan perencanaan waktu dan perhitungan biaya dalam pengerjaan fabrikasi dari desain eksisting dan desain ulang. Kedua desain dianalisa waktu dan biaya yang lebih optimal selama proses pengerjaan fabrikasi pada jalur boiler Yoshimine 1 menuju turbin alternator. Hasil analisa menunjukkan bahwa waktu pengerjaan lebih cepat pada desain ulang dikarenakan jumlah pipa mengalami pengurangan dan jumlah belokan lebih sedikit daripada desain eksisting. Terjadi perbedaan waktu selama 10 hari. Biaya pengerjaan lebih ekonomis pada desain ulang dikarenakan waktu dan jumlah material lebih sedikit daripada desain eksisting. Terjadi perbedaan biaya sebesar Rp. 135.598.011,00. Jadi, rancangan desain line dari boiler Yoshimine 1 menuju turbin alternator pada PG. Gempolkrep, Mojokerto yang paling optimal dari segi ekonomis dan waktu pengerjaan adalah desain ulang. Kata Kunci: Boiler Yoshimine 1, Turbin alternator, Manajemen pengerjaan fabrikasi, Desain eksisting, Desain ulang, Waktu pengerjaan, Biaya pengerjaan.


Abstract

Line of boiler yoshimine 1 to alternator turbine at PG. Gempolkrep, Mojokerto used for power electric. Producing steam pressure is 20 kg/cm2 with temperature 350oC dan flow rate 1,35 m3/s. Superheated steam produced by boiler would be collected or saved in HPSH (High Pressure Steam Header), it transfered to turbine alternator. PG. Gempolkrep, Mojokerto has been developing in instrumentation because those piping system from boiler Yoshimine 1 to turbin pressure dropped. PG. Gempolkrep, Mojokerto there is no management of fabrication work. Line of boiler Yoshimine 1 to turbine alternator is a vital role for sustaining factory life so management of fabrication work should scheduled and structured. Based on those issues, workmanship of existing design and redesign fabrication management need to be scheduled and structured. Therefore it is necessary for the planning time and cost calculation in workmanship fabrication of the existing design and redesign. Both designs will be analyzed over time and optimal costs during the process of fabrication in lines 1 Yoshimine boiler to the turbine alternator The analysis shows that the on re-design has faster workmanship time due to reduction in the number of pipes and the number of bends less than the existing designs. There is a difference as long as 10 days. The cost of construction is more economical in the redesign due to the timing and amount of material less than existing designs. There is a difference cost of Rp. 135,598,011.00. Thus, the draft design line from the boiler to the turbine alternator Yoshimine 1 on PG. Gempolkrep, Mojokerto the most optimal in terms of economical and time of execution is a redesign. Kata Kunci: Boiler Yoshimine 1, Turbine alternator, Management of fabrication work, Existing design, Redesign, Workmanship time, Workmanship cost.


Detil Peneliti

Dosen Pembimbing 1 :Arie Indartono
Dosen Pembimbing 2 : Pekik Mahardhika

Program Studi : D4 - TEKNIK PERPIPAAN
Angkatan : 2011


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.