ANALISA TEKNIS DAN EKONOMIS PADA REDESAIN PIPA TRANSFER 203 M DI AREA DERMAGA PT. PETROKIMIA GRESIK

TECHNICAL AND ECONOMICAL ANALYSIS IN REDESIGNING PIPE TRANSFER 203 M AT JETTY AREA PT. PETROKIMIA GRESIK

Bintang Timur Lazuardi (6811040004)


Abstrak

-Tugas akhir ini bertujuan untuk menganalisa secara teknis dan ekonomis desain eksisting yang mengalami penyusutan sebesar 5,2 inch dan nilai tegangan melebihi nilai tegangan izin yang disebabkan oleh penyusutan tersebut. Besar tegangan desain eksisting dihitung menggunakan perangkat lunak CAESAR II dan divalidasi dengan perhitungan secara manual. Tiga macam desain alternatif telah diperoleh. Desain alternatif 1 menggunakan loop ekspansi, desain alternatif 2 menggunakan expansion joint, desain alternatif 3 menggunakan belokan. Ketiga macam desain alternatif dimodelkan dengan perangkat lunak CAESAR II. Masing-masing desain alernatif dianalisa berdasarkan nilai tegangan akibat beban sustain, nilai tegangan akibat beban ekspansi, nilai tegangan akibat beban okasional, nilai displacement pipa akibat sistem beroperasi, kemudian dihitung biaya kontruksi untuk menentukan desain yang paling optimal. Hasil analisa menunjukkan semua desain alternatif memiliki nilai tegangan dibawah nilai tegangan izin berdasarkan kode ASME B31.3. Desain alternatif 1 menghabiskan biaya kontruksi sebesar Rp 51.605.897,-. Desain alternatif 2 menghabiskan biaya kontruksi paling besar yaitu Rp 100.914.650,-. Desain alternatif 3 menghabiskan biaya kontruksi paling kecil sebesar Rp 47.963.950,-sehingga desain alternatif 3 dipilih sebagai desain yang optimal.


Abstract

-The aim of this final project is to analyze technically and economically the exsisting design which have length 203 m shrink in the amount of 5,2? and overstress caused by that shrinkage. The stress value of existing design is calculated using CESAR II software and validated with manual calculation. Three alternative design obtained Alternative design 1 use the expansion loop, alternative design 2 use the expansion joint, alternative design 3 use the bend. All kind of alternative design is modelled using CAESAR II software. Each of design alternative would be analyzed base on the value of stress due to sustained load, stress due to expansion load, stress due to occasional load, displacement due to system operating, then calculating construction cost to determine the optimal design. The analysis result shows that all of the alternative design has stress value below allowable stress base on ASME B31.3. Alternative design 1 spend contruction cost Rp 51.605.897,-. Alternative design 2 spend the largest construction cost Rp 100.914.650,-. Alternative design 3 has the smallest construction Rp 47.963.950,- so alternative design 3 chosen as optimal design.


Detil Peneliti

Dosen Pembimbing 1 :Adi Wirawan Husodo
Dosen Pembimbing 2 : Emie Santoso

Program Studi : D4 - TEKNIK PERPIPAAN
Angkatan : 2011


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.