ANALISA RESIKO ELBOW PIPE PADA SISTEM PERPIPAAN MAIN STEAM AKIBAT KOROSI INTERNAL DENGAN MENGGUNAKAN RISK BASED INSPECTION (RBI)

RISK ANALYSIS OF ELBOW PIPE ON THE MAIN STEAM PIPING SYSTEM DUE TO INTERNAL CORROSION WITH USING RISK BASED INSPECTION (RBI)

Ardianto Wilasmoro Kusumo (6809040008)


Abstrak

Sistem perpipaan pada PLTU memiliki resiko yang tinggi karena selalu berhubungan dengan high temperature dan high pressure, salah satu contohnya adalah sistem perpipaan pada main steam keluaran superheater hingga menuju ke high pressure turbine. Akibatnya pada sistem perpipaan tersebut mengalami korosi internal, terutama pada daerah elbow pipe. Korosi yang terjadi adalah korosi erosi dimana dapat mengakibatkan penipisan dinding elbow pipe dan dapat berpeluang menimbulkan kegagalan struktur pada elbow pipe. Oleh karena itu diperlukan suatu metode pengelolaan inspeksi. Metode yang digunakan untuk menganalisa resiko kegagalan tersebut adalah Risk Based Inspection (RBI), yaitu metode pengelolaan inspeksi atas peralatan kerja pada sebuah industri yang didasarkan pada tingkat resiko yang dimiliki oleh peralatan kerja tersebut. Tugas akhir ini untuk mencari tipe konsekuensi kegagalan, tipe kemungkinan kegagalan, dan tingkat resiko pada empat elbow pipe di sistem perpipaan main steam. Dengan mengacu pada API RBI 581 (2000) maka diperoleh tipe konsekuensi kegagalan untuk seluruh elbow adalah C, tipe kemungkinan kegagalan untuk seluruh elbow adalah 3. Sementara itu, semua elbow pipe tergolong dalam tingkat resiko menengah.


Abstract

Piping system at the steam power plant has a high risk because it is always associated with high temperature and high pressure, one example is on the main steam piping system output superheater flown to the high pressure turbine. As a result, the piping system has an internal corrosion, especially in the area of the elbow pipe. Errosion is happened together with corrosion in main steam piping system which could make decreased the wall of elbow pipe. In this condition, errosion could potentially cause structural failure of the elbow pipe. A method of inspection management is needed to know the risk level. Risk Based Inspection (RBI) is the method to analyzed the risk of failure, the inspection method of equipment management work in an industry that is based on the level of risk which is owned by the working equipment. In this project to finding the consequences of failure type, likelihoods of failure type, and levels of risk at four elbow pipe in the main steam piping system are the goals that should be achieved. Based on API RBI 581 (2000) reference, the consequences of failure for all elbows are C, and the likelihoods of failure for all elbows are 3. Meanwhile, all the elbow pipes are categorized into the middle level of risk.


Detil Peneliti

Dosen Pembimbing 1 :Dimas Endro Witjonarko
Dosen Pembimbing 2 : Endah Wismawati

Program Studi : D4 - TEKNIK PERPIPAAN
Angkatan : 2009