OPTIMASI PERENCANAAN DAN PENGENDALIAN PROYEK UNTUK MENDUKUNG PENGAMBILAN KEPUTUSAN DI PT. TUBAN STEEL WORK

OPTIMIZATION OF PROJECT PLANNING AND CONTROLLING TO SUPPORT THE DECISION MAKING PROCESS IN PT. TUBAN STEEL WORK

Dedi Prasetyo (6710040002)


Abstrak

ABSTRAK PT. Tuban Steel Work merupakan perusahaan baru yang bergerak dibidang manufaktur yang memiliki kemampuan untuk merancang dan membuat semua jenis pressure vessels, heat exchangers, boilers, process piping, steel structure, flare stack serta storage tanks. Selama ini pengelolaan proses produksi terkadang hanya berdasarkan atas pengalaman dari senioritas pekerja, dengan sistem pengelolaan yang belum sempurna membuat proyek HP-LP flare stack mengalami keterlambatan pengerjaan selama 24 hari. Akibat keterlambatan ini perusahaan mengalami kerugian dari segi waktu dan biaya. Konsekuensi yang diterima sebagai fabrikator yaitu perusahaan harus membayar denda sebesar 1% perhari dari harga kontrak. Analisis optimalisasi dan pengendalian produksi dalam hal ini sangatlah penting karena mampu mengembalikan proyek pada rencana semula, sehingga biaya produksi dapat diminimalkan. Variabel yang dipakai dalam pengendalian proyek ini didasarkan pada proses produksi yang berkaitan dengan pengelasan. Dimana variabel tersebut yang pertama adalah variasi kampuh las single bevel dengan double bevel masing-masing dengan variasi sudut kampuh 50, 55, 60 dan yang kedua adalah variabel penggunaan jenis proses pengelasan (GTAW SMAW, GTAW, SMAW, GTAW FCAW). Langkah selanjutnya yaitu mengolah data dengan metode jalur kritis menggunakan perhitungan manual CPM dan dibandingkan dengan hasil pengolahan software WINQSB. Hasil dari penelitian ini adalah durasi proyek dapat dikembalikan kerencana awal dan bahkan didapatkan percepatan durasi 8 hari dari waktu perencanaannya. Dengan lintasan kritis HP flare stack adalah A?C?D11?D12?D17?D18?D19?D110?D111, Lintasan kritis LP flare stack adalah A?C?E56?E58?E59?E510?E511?E512. Dengan adanya percepatan durasi ini biaya proyek tidak mengalami peningkatan sehingga proyek lebih optimal dan perusahaan tidak perlu membayar denda 1% akibat keterlambatan pengerjaan. Kata kunci: HP-LP Flare Stack, Analisis optimalisasi, pengendalian produksi, Variabel, CPM, WINQSB.


Abstract

ABSTRACT PT. Tuban Steel Work is a new company engaged in manufacturing which has the ability to design and make all kinds of pressure vessels, heat exchangers, boilers, process piping, steel structure, flare stack and storage tanks. During the management of the production process sometimes just based on the experience of seniority workers, by the management system is not perfect makes HP-LP project Flare Stack delayed for 24 days. As a result of this delay the company suffered losses in terms of time and cost. The consequences are accepted as a fabricator that has to pay a penalty of 1% per day of the contract price. Analysis and optimization of production control in this case is important because it is able to return to the original plan of the project, so that the production cost can be minimized. The variables used in this project is based on the control of the production process associated with welding. The first variable is the variation of the single bevel with double bevel with variation angle 50, 55, 60 and the second variable is types of welding processes (GTAW SMAW, GTAW, SMAW, GTAW FCAW). Next step are processing of data using the critical path method CPM manual calculations and compared with the results processing software WINQSB. The results of this research project is duration can be returned early, and even obtained acceleration time duration 8 days of planning. With the HP flare stack critical path is A-C-D11-D12-D17-D18-D19-D110-D111, a critical track LP flare stack is A-C-E56-E58-E59-E510-E511-E512. With the acceleration of the duration of the project cost doesn?t increase. so the optimal project and the company doesn?t have to pay a penalty of 1% as a result of construction delays. Key words: HP-LP Flare Stack, optimization analysis, production control, variable, CPM, WINQSB.


Detil Peneliti

Dosen Pembimbing 1 :Endang Pudji Purwanti
Dosen Pembimbing 2 : Tri Karyono

Program Studi : D4 - TEKNIK PENGELASAN
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.