EVALUASI KESESUAIAN SAFETY PLAN BERDASARKAN PERUBAHAN RENCANA UMUM KAPAL X

EVALUATION OF SAFETY PLAN APPROPRIATENESS BASED ON LAYOUT ALTERATION OF MV. X

Aussie Tahta Maharani (6511040063)


Abstrak

Kapal X merupakan kapal jenis ro-ro passenger yang berlayar dari Surabaya-Banjarmasin dengan jarak 300 mil. Memiliki kapasitas penumpang sebanyak 1500 orang dan ABK berjumlah 38 orang. Kapal X sedang dalam tahap renovasi pada bagian car deck sehingga perlu dilakukan perancangan safety plan baru yang sesuai dengan rencana umum baru. Evaluasi kesesuaian safety plan berdasarkan SOLAS dilakukan terlebih dahulu untuk memastikan bahwa kapal X memerlukan perancangan safety plan yang baru. Langkah-langkah yang dilakukan pada penelitian ini adalah melakukan evaluasi kesesuaian safety plan terlebih dahulu kemudian merancang kebutuhan Life-Saving Appliances (LSA) dan proteksi kebakaran dalam kapal serta menentukan rute evakuasi dan menghitung kebutuhan waktu evakuasi keseluruhan. Regulasi yang digunakan mengacu pada SOLAS 2010. Hasil evaluasi menyatakan bahwa beberapa komponen safety plan pada kapal sebelum modifikasi belum sesuai dengan regulasi SOLAS, sehingga dilakukan perancangan dan perhitungan ulang. Analisis mengenai sistem evakuasi juga belum dilakukan pada layout sebelum modifikasi sehingga hasil analisis menggunakan layout kapal sesudah modifikasi membutuhkan travel time (T) selama 51 menit untuk Case 1 dan 57,25 menit untuk Case 2. Perhitungan tersebut sudah memenuhi standar yang ditetapkan yaitu kurang dari 60 menit. Kata kunci: safety plan, ro-ro passenger ship, life-saving appliances, fire protection, rute evakuasi


Abstract

MV. X is a ro-ro passenger ship sailing from Surabaya to Banjarmasin with 300 miles distance. Having capacity of 1500 persons and 38 crews. MV. X is under renovation in her car deck, therefore the new safety plan has to be made that is comply with newer General Arrangement. Evaluation of safety plan compatibility based on SOLAS 2010 need to be done first in order to ensure that MV. X need a new safety plan. Steps to do in this title is evaluate the safety plan compatibility according to SOLAS 2010 first then staking out the needs of LSA and fire protection on board and determine evacuation route and count the whole evacuation time, according to SOLAS 2010. Evaluation result state that some components of safety plan by the Before modification layout haven?t comply with SOLAS 2010, therefore redesign and recount of safety plan need to be done. Analyze toward the evacuation system hasn?t made yet in the previous General Arrangement so the result using the newer General Arrangement need Travel Time (T) for about 51 minutes in Case 1 and 57,25 minutes in Case 2. The result has comply with the regulation that require less than 60 minutes. Keywords: safety plan, ro-ro passenger ship, life-saving appliances, fire protection, evacuation route


Detil Peneliti

Dosen Pembimbing 1 :Eko Julianto
Dosen Pembimbing 2 : Rona Riantini

Program Studi : D4 - TEKNIK KESELAMATAN DAN KESEHATAN KERJA
Angkatan : 2011


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.