Perencanaan Preventive Maintenance Menggunakan Metode Reliability Centered Maintenance (RCM) dan Analisa Resiko dengan Risk Priority Number (RPN) Pada Automatic Rotary Continous Filling Machine (Studi Kasus : PT X Surabaya)

-PREVENTIVE MAINTENANCE PLANNING BY RCM And RISK ANALYSIS BY RPN AT AUTOMATIC ROTARY CONTINUOUS FILLING (Case Study : PT X Surabaya)

Rizky Suwasono (6510040053)


Abstrak

PT. X Surabaya merupakan perusahaan yang bergerak di bidang manufaktur dalam memproduksi kosmetik secara terus menerus. Oleh sebab itu, semua yang berperan dalam proses produksi harus dapat bekerja dengan baik salah satunya mesin Automatic Rotary Countinuous Filling


Abstract

-PT. X Surabaya is a company engaged in manufacturing in producing cosmetics continuously. Therefore, all of which participate in the production process must be able to work with either one of these machines Automatic Rotary Filling and Capping Machine countinuous (Fillomatic) which functions to process liquid product filling to packing products. The damage that occurs to disrupt the production process. So it is necessary to study a study of the damage done to the engine fillomatic. So it can be determined that the optimal maintenance activities This study uses RPN (Risk Priority Number) and II RCM (Reliability Centered Maintenance II), RPN method used to determine the priority of most major system failure while the RCM method II is used to determine the appropriate type of maintenance activities on an analysis of the impact of equipment through caused by a failure to use FMEA tables and Decision Diagram. FMEA analysis of the results obtained that the cause of the engine failure fillomatic R24A there are 14 forms of failure, and there are some engine components fillomatic that have the highest priority to be considered is the conveyor belt with RPN 400. Based on RCM II decision diagrams, preventive activities for the components of the engine can be fillomatic scheduled on-condition tasks, scheduled restoration task, and dischard scheduled task. The policy depends on the failure mode of each the component. Keywords: FMEA, RPN, and RCM II


Detil Peneliti

Dosen Pembimbing 1 :Mohamad Hakam
Dosen Pembimbing 2 : Arief Subekti

Program Studi : D4 - TEKNIK KESELAMATAN DAN KESEHATAN KERJA
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.