ANALISIS KEANDALAN DAN KESELAMATAN BOILER UNIT UTILITAS BATU BARA PT. PETROKIMIA GRESIK

RELIABILITY AND SAFETY ANALYSIS BOILER OF COAL UTILITY UNIT AT PT PETROKIMIA GRESIK

Dzurratun Nadlifatin (6510040034)


Abstrak

Unit Utilitas Batu Bara (UBB) merupakan unit utilitas pembangikt listrik tenaga uap PT. Petrokimia Gresik yang terdiri dari steam boiler kapasitas 2x150 ton per jam dan pembangkit listrik kapasitas 32 mega watt. UBB berperan penting dalam proses produksi pabrik Petrokimia untuk memasok power yang berasal dari proses steam generation pada boiler. Boiler berpotensi mengalami ledakan apabila tidak diperhatikan perawatannya. Selain itu, pada proses pembakaran, boiler dengan bahan bakar batu bara ini menghasilkan fly ash dan bottom ash yang menumpuk dan mengganggu proses kerja boiler apabila tidak dilakukan cleaning. Penelitian ini akan membahas perencanaan kegiatan perawatan dengan menerapkan metode analisis keandalan. Analisis kualitatif dilakukan dengan Fault Tree Analisis (FTA). Analisis kuantitatif terhadap record kegagalan digunakan untuk mengetahui nilai Time to Failure (TTF) yang kemudian dimasukkan ke dalam software weibull untuk menentukan jenis distribusi yang sesuai. Kemudian dilakukan penentuan interval waktu perawatan optimal. Selain itu, akan dibahas tentang analisis keselamatan boiler yang ditinjau dari laju kegagalan, nilai Probability of Failure on Demand (PFD), dan penentuan SIL berdasarkan IEC 61508. Hasil penelitian menunjukkan bahwa equipment boiler yang mengalami kegagalan adalah BFW Pump A, BFW Pump C, Upper Economizer A, Boiler A, Boiler B, Low Temperature Superheater A, Low Temperature Superheater B, 2nd High Temperature Superheater A, 2nd High Temperature Superheater B. Equipment yang menjadi prioritas utama kegiatan maintenance adalah Boiler B yang membutuhkan biaya perawatan paling tinggi yaitu Rp 2671357,00/jam. Sedangkan interval waktu maintenance yang optimal adalah pada 1303.3256 jam. Untuk perhitungan laju kegagalan, Boiler B termasuk memiliki laju kegagalan yang meningkat dengan cepat dengan PFDavg 0.46257 dan tergolong SIL 0. Dengan adanya penelitian ini diharapkan dapat membantu meningkatkan efisiensi masing-masing equipment tersebut serta membantu dalam menyusun jadwal maintenance yang terencana.


Abstract

Utility Unit Coal (UBB) is a unit of electric utility steam pembangikt PT. PKG consisting of a steam boiler 2x150 tons per hour capacity and power generation capacity of 32 mega watts. UBB plays an important role in the production process Petrochemical plant to supply the power that comes from the process steam generation in boilers. Boiler potentially having a blast if not considered treatment. In addition, the process of combustion, boiler fuel coal produces fly ash and bottom ash that accumulate and disrupt the work process if no cleaning boilers. This study will discuss the planning of maintenance activities by applying the method of analysis of reliability. Qualitative analysis was performed with the Fault Tree Analysis (FTA). Quantitative analysis of the failure of the record used to determine the value of TTF (Time to Failure) is then inserted into the software weibull distribution to determine the appropriate type. Then the determination of the optimal treatment time interval. In addition, it will discuss the safety analysis in terms of the rate of boiler failure, the Probability of Failure on Demand (PFD), and determination of SIL according to IEC 61508. The results showed that the boiler equipment failure is BFW Pump A, BFW Pump C, Upper economizer A, Boilers A, B Boiler, superheater A Low Temperature, Low Temperature superheater B, 2nd superheater A High Temperature, High Temperature 2nd superheater B. equipment is a top priority to maintenance activities is a Boiler B which requires the highest maintenance cost is Rp 2,671,357.00 / hour. While the optimal maintenance interval is at 1303.3256 hours. For the calculation of a failure rate, including the Boiler B has a failure rate increases rapidly with PFDavg 0.46257 and classified as SIL 0. Given this research is expected to help improve the efficiency of each of these equipment as well as assist in developing a planned maintenance schedule.


Detil Peneliti

Dosen Pembimbing 1 :Muhammad Shah
Dosen Pembimbing 2 : Priyo Agus Setiawan

Program Studi : D4 - TEKNIK KESELAMATAN DAN KESEHATAN KERJA
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.