Evaluasi Fire Emergency Respon Plan dan Aplikasi Fosfor Sebagai Jalur Evakuasi pada Gedung Graha PT Petrokimia Gresik

Evaluation of Fire Emergency Respon Plan and Application of Phosphorus for Exit Route in Graha PT Petrokimia Gresik

Chandra Mukti Sri Maulana (6510040029)


Abstrak

PT Petrokimia Gresik merupakan perusahaan produsen produk-produk pupuk dan non pupuk terbesar yang memiliki luas area ? 450 Ha dengan rencana perluasan lahan (reklamasi) seluas ? 150 Ha. Memiliki 21 plant yang terbagi ke dalam 3 pabrik, PT Petrokimia Gresik memiliki kantor pusat yang bertempat di gedung Graha PT Petrokimia Gresik. Gedung Graha PT Petrokimia Gresik memiliki total 8 lantai yang difungsikan sebagai kantor.Berdasarkan Kep Men Tenaga Kerja RI No. Kep 186 / Men / 1999 tentang unit penanggulangan kebakaran di tempat kerja pasal 2 ayat (1) menjelaskan bahwa pengurus atau perusahaan wajib mencegah, mengurangi, dan memadamkan kebakaran di tempat kerja. Karena itu peneliti akan mengevaluasi Fire Emergency Respon Plan secara keseluruhan pada gedung Graha PT Petrokimia Gresik. Untuk mengevaluasi Fire Emergency Respon Plan gedung Graha PT Petrokimia Gresik perlu dilakukan beberapa perhitungan berikut, mengklasifikan jenis bangunan, menghitung jumlah pintu darurat, menghitung lalu orang per menit, menghitung waktu escape, dari perhitungan tersebut akan dibandingkan dengan kondisi existing gedung Graha PT Petrokimia Gresik.Selain itu penelitian ini juga merancang pembuatan jalur evakuasi menggunakan fosfor, akan ditentukan desain marking fosfor, penelitian kelayakan fosfor, perhitungan jumlah dan peletakan fosfor pada layout gedung Graha, serta mengestimasi biaya yang dibutuhkan untuk perancangan tersebut. Hal ini dilakukan untuk upaya pencagahan dan mengantisipasi jika terjadi keadaan darurat sehingga pekerja pada gedung tersebut dapat dievakuasi dengan selamat. Dari hasil evaluasi gedung Graha PT Petrokimia Gresik didapatkan bahwa lantai 2 memiliki potensi bahaya tertinggi karena dari hasil perhitungan unit exit yang dibutuhkan sebanyak 10 unit exit, dan 4 buah exit. Total waktu evakuasi yang dibutuhkan hingga assembly point adalah selama 28,41 menit. Perhitungan titik peletakan alat menggunakan bahan fosfor didapatkan hasil lantai dasar sebanyak 6 buah, lantai 1 sebanyak 4 buah, lantai 2 sebanyak 23 buah, lantai 3-7 sebanyak 23 buah, lantai 8 sebanyak 23 buah. Perhitungan biaya untuk perancangan alat menggunakan bahan fosfor sebesar Rp 12.625.000. Hasil penelitian kelayakan fosfor menggunakan luxmeter dengan variabel ketinggian lampu dan lama waktu paparan mendapatkan nilai 7 lux pada menit ke 0 dengan waktu paparan 1 jam pada ketinggian 230 cm, dan nilai 8 lux pada menit ke 0 dengan waktu paparan 1 jam pada ketinggian 200 cm. Kata Kunci : Jalur Evakuasi, Fire Emergency Respon Plan, Fosfor


Abstract

PT Petrokimia Gresik company is a producer of fertilizer and non-fertilizer products which has the largest area of ? 450 Ha of land with expansion plan (reclamation) of ? 150 Ha. Has 21 plants that defided in 3 factory, PT Petrokimia Gresik has its headquarter located at Graha PT Petrokimia Gresik. Graha Petrokimia Gresik has a total of 8 floors are used as offices. Based on the Kep Men Tenaga Kerja RI No. Kep 186 / Men / 1999 on fire prevention unit in the workplace article 2, paragraph (1) explains that the board or the company is obliged to prevent, reduce, and extinguish fires in the workplace. Therefore, researchers will evaluate the Fire Emergency Response Plan as a whole in Graha PT Petrokimia Gresik. To evaluate the Fire Emergency Response Plan Graha PT Petrokimia Gresik needs to be done some calculations the following, classify the type of building, counting the number of emergency exits, and then calculate the per minute, calculate the escape time, from these calculations will be compared to the existing condition of Graha PT Petrokimia Gresik. In addition, this study also design manufacture evacuation route using phosphorus, it will be determined marking design, feasibility studies of phosphorus, the calculation of the number and placement of phosphorus on Graha layout, as well as cost estimates required for the design. This is done for prevention efforts and anticipate the event of an emergency so that workers in the building can be evacuated safely. From the results of the evaluation of Graha PT Petrokimia Gresik was found that the 2nd floor has the highest potential danger because of the results of the calculation of the required exit units 10 units of exit, and exit 4 pieces. Total evacuation time required to assembly point is for 28.41 minutes Point calculations using the tools laying phosphor material showed the ground floor as much as 6 pieces, 4 pieces floor 1, floor 2 as many as 23 pieces, as many as 23 pieces of 3-7 floors, floor 8 by 23 pieces. Cost calculation to design a tool using a phosphor material for 12.625 million rupiah. The results of the feasibility study of phosphorus using a variable height luxmeter with lights and long exposure time to get a score of 7 to 0 lux at the minute with a time of 1 hour exposure at a height of 230 cm, and the value of 8 lux at 0 minutes to 1 hour exposure time at a height of 200 cm. Keywords: Evacuation Strip, Fire Emergency Response Plan, Phosphorus


Detil Peneliti

Dosen Pembimbing 1 :Moch Luqman Ashari
Dosen Pembimbing 2 : Priyo Agus Setiawan

Program Studi : D4 - TEKNIK KESELAMATAN DAN KESEHATAN KERJA
Angkatan : 2010