IDENTIFIKASI HUMAN ERROR PADA PEKERJAAN LOADING DAN UNLOADING MENGGUNAKAN OVERHEAD CRANE DENGAN PENDEKATAN TECHNIQUE FOR HUMAN ERROR RATE PREDICTION (THERP) DI PT. X

HUMAN ERROR IDENTIFICATION OF LOADING AND UNLOADING USING OVERHEAD CRANE TO TECHNIQUE FOR HUMAN ERROR RATE PREDICTION (THERP) APPROACH IN PT. X

Denny Natalia (6509040022)


Abstrak

PT. X adalah perusahaan manufaktur yang menghasilkan komponen-komponen penyusun boiler. Perusahaan ini memiliki 500 karyawan dan 1500 karyawan subkontraktor. Konsumen dari PT. X tidak hanya dari Indonesia saja, melainkan dari berbagai negara, seperti China, India, dan Perancis. Otomatis selama proses pembuatan komponen tersebut tentunya PT. X memiliki target waktu tertentu untuk memproduksi komponen dengan jumlah tertentu. Di dalam perusahaan ini sendiri telah diterapkan zero accident pada tahun 2012 dalam pekerjaan apapun, termasuk di pengangkatan menggunakan Overhead Crane yang banyak dilakukan di PT. X. Namun kecelakaan kerja akibat human error di pekerjaan loading dan unloading menggunakan Overhead Crane belum dapat dihindari. Pada hasil perhitungan HEP menggunakan metode Human Reability Analysis (HRA) generasi pertama yaitu Technique for Human Error Rate Prediction (THERP) pada masing-masing bentuk benda menggunakan OHC didapatkan besar HEP untuk benda yang berbentuk bulat yaitu 0,051, persegi 0,05, regular 0,046 dan non regular 0,043 yang berpengaruh pada Performance Shaping Factor (PSF). Rekomendasi yang dibutuhkan adalah untuk task-task kritikal adalah administratif kontrol untuk prosedur, pengawasan oleh inspektor OHC ketika dilakukan pekerjaan pengangkatan atau pemberian label dan tanda SWL pada setiap lifting accesories yang digunakan, maintenance pada mesin, training, peringatan kembali mengenai prosedur pada operator OHC dan kombinasi dari beberapa peraturan. Kata kunci: Pengangkatan Over Head Crane, (THERP), (HRA), (PSF)


Abstract

PT. X is a manufacturing company that produces the components which are built up the boiler. The company has 500 employees and 1500 subcontractor employees. Consumers of PT. X are not only from Indonesia itself, but also from various countries, such as China, India and France. Automatically during the process of manufacturing the components of course PT. X has a target time to produce parts with a certain amount. Within the company itself has applied zero accident in 2012 in any work, including in the use of Overhead Crane lifting is mostly done in PT. X. But accidents due to human error in loading and unloading work using Overhead Crane can not be avoided yet. On the results of calculations using the first generation method of Human Reability Analysis (HRA), that is Technique for Human Error Rate Prediction (THERP) on each form of material using OHC, are obtained the results of HEP for round material is 0,051, square material is 0,05, regular material is 0,43, non regular material is 0,043 and influential on the Performance Shaping Factor (PSF). Recommendations are required for critical tasks to the administrative controls for procedures, oversight by OHC inspectors whe the jobs are done or providing of labels and signs of SWL on every lifting accesories used, maintenance on machine, training, warning back about the procedur and the combination of several OHC regulations. Keywords: Over Head Crane Lifting, (THERP), (HRA), (PSF)


Detil Peneliti

Dosen Pembimbing 1 :Lukman Handoko
Dosen Pembimbing 2 : Indri Santiasih

Program Studi : D4 - TEKNIK KESELAMATAN DAN KESEHATAN KERJA
Angkatan : 2009