ANALISA SISTEM KERJA DAN PERAWATAN DECK CRANE MacGREGOR HAGGLUNDS TYPE GL 8012,5/6017/4025/3427-3 PADA KAPAL MV. MERATUS PROJECT 1

ANALYSIS OF WORK SYSTEM AND MAINTENANCE ON Hagglunds MacGregor CRANE DECK TYPE GL 8012.5 / 6017/4025/3427-3 On SHIP MV. Meratus PROJECT 1

Nugroho Adi Wicaksono (6411030024)


Abstrak

ABSTRAK Pengoperasian Deck Crane MacGREGOR Hagglunds Type GL 8012,5/6017/4025/3427-3 pada Kapal Kargo MV. Meratus Project 1 tidak terlepas dari barang dan kontainer yang merupakan beban (muatan). Saat loading dan unloading terhadap beban (SWL) 34 Ton diperlukan daya sebesar 184.44 kW pada proses pengangkatan (Up) dan proses luffing dari maksimum ke minimum, jib radius single Deck Crane diperlukan waktu sebesar 48.6 detik dengan daya 128.1 kW. Pada proses tersebut gerak jib (hoisting dan lowering) dari hasil beban (muatan) yang bervariasi akan mengakibatkan getaran pada jib dan hook, sehingga dapat merusak sistem hidrolik. Untuk mengatasi hal tersebut, maka tugas akhir ini mencoba memberikan usulan solusi yaitu melakukan pengendalian Deck Crane dengan cara perawatan secara periodik yang meliputi inspeksi dan pelumasan yaitu : pada engsel kabin, slewing bearing, wire rope, sistem hidrolik, sistem pengereman dan pengoperasian motor listrik utama harus sesuai dengan Standar Operasional Prosedur (SOP). Hasil dari perhitungan dan perawatan pada Deck Crane, maka diharapkan daya beban motor yang terjadi sesuai dengan beban (SWL) dan jarak jib (lengan) antara lain : 34 Ton maksimal 27 meter, 40 Ton maksimal 25 meter, 60 Ton maksimal 17 meter dan 80 Ton maksimal 12,5 meter. Hal ini akan mendapatkan penghematan biaya dan waktu terhadap proses bongkar muat barang. Kata kunci : Deck Crane, sistem pengereman, motor listrik, sistem hidrolik dan perawatan komponen.


Abstract

ABSTRACT Hagglunds MacGregor Deck Crane Operation Type GL 8012.5/6017/4025/3427-3 on Cargo Ship MV. Meratus Project 1 can not be separated from the goods and containers that are load (payload). When loading and unloading of the load (SWL) 34 Tons of 184.44 kW of power required in the process of removal (Up) and the luffing from minimum to maximum, Single Deck Crane jib radius required time of 48.6 seconds with a power of 128.1 kW. In the process of motion jib (hoisting and lowering) of the results of the load (load) will cause vibration that varies on a jib and hook, which can damage the hydraulic system. To overcome this, the final project is trying to provide a solution that is proposed to control Deck Crane in a way that includes periodic maintenance inspection and lubrication are: the hinge cabin, slewing bearings, wire rope, hydraulic systems, braking systems and the operation of the main electric motor must be in accordance with the Standard Operating Procedure (SOP). The results of the calculation and maintenance on Deck Crane, it is expected that the motor load power occurs in accordance with the load (SWL) and jib distance (arm) include: 27 meters maximum 34 Ton, 40 Ton maximum of 25 meters, 17 meters maximum 60 Tons and 80 tons maximum of 12.5 meters. This will get cost savings and time to the process of loading and unloading of goods. Keywords : Deck Crane, braking systems, electric motors, hydraulic systems and components maintenance.


Detil Peneliti

Dosen Pembimbing 1 :Rachmad Tri Soelistijono
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK KELISTRIKAN KAPAL
Angkatan : 2011


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.