ANALISA OCR (OVER CURRENT RELAY) GANGGUAN JARINGAN TEGANGAN MENENGAH20 KV DI PENYULANG GLAGAH PT. PLN (PERSERORAYON LAMONGAN

ANALYSIS OCR (OVER CURRENT RELAY) MEDIUM VOLTAGE NETWORK INTRUSIONAT 20 KV FEEDERS GLAGAH PT. PLN (PERSERO) RAYON LAMONGAN

Miftakul Huda (6410030045)


Abstrak

Nama : Miftakul Huda (6410030045) Pembimbing : Ir. Achmad Syahid, MT. ABSTRAK Kebutuhan listrik telah menjadi kebutuhan yang penting bagi masyarakat disemua kalangan. PLN adalah perusahaan di Indonesia yang bertanggung jawab mengembangkan tugas dalam sistem distribusi listrik. Tingkat keandalan teknis kelistrikan dari suatu sistem distribusi sangat penting guna menjamin supply tenaga listrik kepada konsumen, karena itu disadari pentingnya keamanan dalam sistem distribusi, yang salah satunya dapat dicapai dengan menggunakan OCR (Over Current Relay). OCR (Over Current Relay ) bekerja berdasarkan ketidak seimbangan arus pada saat terjadinya gangguan hubung singkat fasa ke fasa khususnya hubung singkat pada tegangan menengah. OCR (Over Current Relay) harus disetting di atas arus beban maksimum dan dibawah arus short circuit minimum. Artinya pada saat sistem dalam keadaan beban puncak maka relai tidak diharapkan trip karena itu bukanlah berupa gangguan, namun selebihnya dari itu, maka relai diharapkan mampu mendeteksi arus gangguan sekecil mungkin yang dapat mengganggu sistem kinerja. Kata Kunci: OCR (Over Current Relay), Jaringan Tegangan Menengah, Hubung Singkat, Trip.


Abstract

Nama : Miftakul Huda (6410030045) Pembimbing : Ir. Achmad Syahid, MT. ABSTRACT Electricity demand has become an important requirement for people in all walks of life. PLN is a company in Indonesia which is responsible for developing tasks in electrical distribution systems. Level of technical reliability of the electrical distribution system is essential to ensure the supply of electricity to consumers, because it is aware of the importance of security in the distribution system, one of which can be achieved by using OCR (Over Current Relay). OCR (Over Current Relay) works based on the current imbalance at the time of the short circuit phase-to-phase short circuit especially at medium voltage. OCR (Over Current Relay) must be set above the maximum load current and short circuit current under minimum. It means that when the system is in a state of peak load in the relay is not expected trip because it is not a nuisance, but the rest of it, then the relay should be able to detect the smallest possible fault current that can interfere with system performance. Key Word: OCR (Over Current Relay), Medium Voltage Network, Short Circuit, Trip.


Detil Peneliti

Dosen Pembimbing 1 :Achmad Syahid
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK KELISTRIKAN KAPAL
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.