ANALISIS GANGGUAN (FASA-TANAH) PADA PENYULANG EMPIRE (Studi Kasus Pada Transformator 1 GIS Kupang).

ANALYSIS OF DISTURBANCE (LINE-TO GROUND FAULT) IN THE EMPIRE FEEDERS (CASE STUDIES ON TRANSFORMATOR 1 GIS KUPANG).

Imamatur Rosyidah (6410030008)


Abstrak

ABSTRAK Oleh : Imamatur Rosyidah NRP : 6410030008 Proteksi yang benar harus dapat bekerja cukup cepat, selektif dan andal sehingga kerusakan peralatan yang timbul akibat arus gangguan pada bagian sistem atau peralatan yang dilalui arus gangguan dapat dihindari dan kestabilan sistem dapat terjaga. Seperti kasus yang terjadi di GIS (Gas Insulation Switchgear) Kupang pada tanggal 22 Desember 2010 terjadi trip incoming transformtor 1 (150kV-20kV) PAUWELS 60MVA yang disebabkan karena relai Directional Ground Relay (DGR) pada sisi penyulang Empire gagal kerja. DGR bekerja berdasarkan komponen tegangan, komponen arus dan sudut fasa gangguan yang timbul akibat ketidak seimbangan arus dan tegangan gangguan pada saat terjadinya gangguan hubung singkat 1 fasa ke tanah. Sedangkan Earth Fault relay (EF) bekerja berdasarkan arus (Io) gangguan yang timbul pada saat terjadi gangguan hubung singkat 1 fasa ke tanah. Hasil analisis menunjukkan bahwa koordinasi relai Stand by Earth Fault Relay (SBEF/NS51) dan penyulang sudah sesuai dengan wilayah pengamanan. Gagal kerja pada relai DGR disebabkan karena tegangan yang terdeteksi pada relai belum menyentuh setting tegangan pada relai DGR. Setting tegangan pada relai DGR adalah 5V sedangkan tegangan gangguan (V0) yang terdeteksi pada relai DGR saat terjadi gangguan adalah 2,59V. Relai EF sendiri hanya melakukan pick-up tidak sampai kerja sebagai tanda jika relai tersebut merasakan gangguan yang terjadi sehingga arus gangguan meluas hingga relai SBEF/NS51 pada sisi incoming trip. Besar arus gangguan I0 yang terbaca pada relai SBEF/NS51 adalah 16A. Arus 16A tersebut disebabkan karena adanya akumulasi arus dari semua penyulang yang tidak memiliki fasilitas relai EF. Kata kunci : Proteksi, Relai DGR, Relai EF, SBEF/NS51 Relai Penyulang, Gangguan, Incoming, setting.


Abstract

ABSTRACT By : Imamatur Rosyidah NRP : 6410030008 Proper protection must be able to work pretty fast, selective and reliable so that damage to equipment caused by the fault current in the system or equipment through which the fault current can be avoided and the system stability can be maintained. As was the case in GIS (Gas Insulation Switchgear) Kupang on December 22, 2010 occurred the incoming trip transformtor 1(150kV-20kV) PAUWELS 60 MVA caused by relay Directional Ground Relay (DGR) on the side of the Empire failed feeders work. DGR work based component of voltage, current and phase angle components disorders arising from current and voltage imbalance disorders at the time of the disturbance 1-phase short circuit to ground. While Earth Fault relay (EF) work based on current (Io) disorders arising in the event of circuit interruption 1 phase to ground short. The analysis showed that the coordination of the relays Stand by Earth Fault Relay (SBEF/NS51) and feeders are in accordance with the security area. Failed to work in relays DGR due to the detected voltage relays have not touched on in the relay setting voltage DGR. Setting the voltage at the relay DGR is 5 V while the noise voltage (V0) was detected in the event of disruption relays DGR is 2.59 V. EF relay itself just did not pick-up as a sign to work if the relay sense disturbance that extends fault current relay trip SBEF/NS51 on the incoming side. Large fault current I0 is legible on SBEF/NS51 relays are 16A. 16A current is caused by the accumulation of all the feeder stream that does not have the facilities EF relays. Keywords: Protection, Relay DGR, EF Relay, Relay SBEF/NS51 feeders, Disorders, Incoming, setting.


Detil Peneliti

Dosen Pembimbing 1 :Hendro Agus Widodo
Dosen Pembimbing 2 : Hendro Agus Widodo

Program Studi : D3 - TEKNIK KELISTRIKAN KAPAL
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.