STUDI ANALISIS GANGGUAN FASA - FASA PADA INCOMING TRANSFORMATOR 5 (GARDU INDUK RUNGKUT) DALAM AREA PELAKSANA PEMELIHARAAN SURABAYA

STUDY ANALYSIS PHASE - PHASE FAULT ON INCOMING TRANSFORMER 5 (MAIN BUS SHELTER RUNGKUT ) IN MAINTENANCE IMPLEMENTING AREA OF SURABAYA

Dewi Ratih Mustikawati (6410030007)


Abstrak

STUDI ANALISIS GANGGUAN FASA-FASA PADA INCOMING TRANSFORMATOR 5 (GARDU INDUK RUNGKUT) DALAM AREA PELAKSANA PEMELIHARAAN SURABAYA Oleh: Dewi Ratih Mustikawati 6410030007 ABSTRAK Sistem pengaman transformator yang baik sesuai dengan daerah pengaman transformator yaitu pengaman di sisi hilir atau penyulang harus mempunyai setting waktu pemutusan gangguan paling cepat agar gangguan tidak mengenai sistem diatasnya. Ketika pengaman disisi penyulang tidak dapat memutus gangguan maka gangguan akan diatasi oleh pengaman disisi incoming dan seterusnya. Kasus yang terjadi di GI Rungkut adalah ketika terjadi gangguan disisi penyulang, OCR (Over Current Relay) instan mendeteksi gangguan dan mentripkan PMT (Pemutus Tenaga) namun PMT sisi incoming ikut trip ketika PMT penyulang dimasukkan. OCR instan bekerja jika mendeteksi arus gangguan solid. Metode yang digunakan untuk menganalisa penyebab kasus tersebut menggunakan metode penelitian komparatif. Setelah data hasil pengujian atau pengukuran PMT dan relai OCR pasca terjadinya kasus terkumpul kemudian dibandingkan dengan standar atau hasil perhitungan. Perbandingan dianalisa untuk mengetahui adanya perbedaan. Selain itu dilakukan analisa pada hasil record saat gangguan terjadi. Hasil analisa menunjukkan bahwa transformator 5 Rungkut memiliki koordinasi sistem pengaman yang sudah sesuai dengan daerah pengaman trafo. Dengan karakteristik waktu kerja relai untuk gangguan tidak solid 2,129s di penyulang, 14,765s di sekunder dan 20,529s di primer serta untuk gangguan solid 0,125s di penyulang, 0,528s di sekunder dan 0,460s di primer. Incoming transformator 5 Rungkut trip karena adanya arus bocor solid sebesar 2160A pada penyulang. Agar kejadian tersebut tidak terulang kembali perlu dilakukan penambahan waktu kesiapan PMT untuk dimasukkan lagi lebih lama dari pemasukkan PMT pada kasus ini yakni diatas 3 menit 24 detik, melakukan pemeliharaan PMT dengan lebih detail, mempertimbangkan lifetime PMT atau melakukan penggantian PMT yang lifetimenya sudah habis. Kata kunci: Transformator, PMT, OCR, Trip, Gangguan Solid, Record Gangguan.


Abstract

STUDY ANALYSIS PHASE-PHASE FAULT ON INCOMING TRANSFORMER 5 (MAIN BUS SHELTER RUNGKUT) IN MAINTENANCE IMPLEMENTING AREA OF SURABAYA By: Dewi Ratih Mustika 6410030007 ABSTRACT Good security system of transformer accordance with the safety seat transformers is feeders downstream side should have set the fastest time of termination of the interference so that no disturbance of the system above. When the safety side feeder can not break the disruption so will be resolved by incoming side and soon. Cases that occurred in the main bus shelter Rungkut when an interruption is hand feeder, OCR (Over Current Relay) instantly detects interference and triped PMT (Circuit Breaker) but incoming PMT trip participate when feeders PMT inserted. OCR instantly works if it detects a solid fault current. The method used to analyze the causes of comparative research methods. After the data of the test or measurement PMT and OCR relays after the case is collected then compared with a standard or calculation results. Comparisons were analyzed to determine the differences. In addition to analysis on the results of the record when it crashes. The analysis shows that the transformer 5 Rungkut has coordinating safety systems are in accordance with the local safety transformer. With the characteristics of working time relay for disturbance is not solid at the feeder 2,129s, in the secondary 14,765s and in the primary 20,529s as well as for solid disruption in feeders 0,125 s, in the secondary 0,528s and 0,460s in the primary. Incoming transformer 5 Rungkut trip due to the solid leakage current as big as 2160A at feeders. So that the incident does not happen again needed extra time to put another PMT readiness longer than PMT entry in this case that is over 3 minutes 24 seconds, perform maintenance PMT with more detail, consider the PMT lifetime or replacement conduct PMT that lifetime is up. Keywords: Transformers, PMT, OCR, Trip, Solid Fault, Fault Record.


Detil Peneliti

Dosen Pembimbing 1 :Edy Prasetyo Hidayat
Dosen Pembimbing 2 : Edy Prasetyo Hidayat

Program Studi : D3 - TEKNIK KELISTRIKAN KAPAL
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.