Pengaruh Variasi Beban (Load) Terhadap Efisiensi Steam Turbine Di PT. Gresik Power Indonesia (The Linde Group)

Iinfluence Of Variation Load (Load) On Steam Turbine Efficiency In PT. GRESIK POWER INDONESIA (The Linde Group)

Ahmad Ansori Narinto (6313030086)


Abstrak

Unit bagian PLTU di PT Gresik Power Indonesia (The Linde Group) telah beroperasi selama 18 tahun dan telah mengalami permasalahan akibat beberapa faktor seperti sering terjadinya derating (penurunan beban), trip (unit shutdown) dan kesalahan dalam pengoperasian serta perawatan yang dapat menurunkan efisiensi thermal, isentopic maupun listrik per unit pada umumnya dan secara spesifikasi pada steam turbin. Dalam tugas akhir ini akan dibahas mengenai analisa efisiensi thermal, isentropic serta listrik yang dihasilkan steam turbin dalam kondisi variasi beban pada steam turbine 1 (ST-1) menggunakan perhitungan termodinamika uap agar diketahui persentase dari energi panas yang ditransformasikan menjadi kerja dan perhitungan perbandingan data teoritis dan aktual listrik untuk perhitungan efisiensi listrik yang dihasilkan oleh steam turbine. Berdasarkan perhitungan secara manual, efisiensi thermal paling tinggi pada pembebanan 6,170 MW yaitu sebesar 36,23 % yang dipengaruhi oleh kondisi kevakuman tekanan di dalam kondensor. Sedangkan efisiensi isentropic paling tinggi pada pembebanan 3,339 MW yaitu 59,54 % yang dipengaruhi oleh perbandingan kinerja aktual dengan kerja untuk ekspansi isentropic dari daerah masuk turbin ke tekanan keluar turbin. Efisiensi litrik paling besar yang di hasilkan oleh steam turbine adalah pada pembebanan 7,563 MW yaitu sebesar 97,64% yang dipengaruhi oleh perhitungan teoritis dibandingkan dengan kondisi aktual listrik yang dihasilkan generator. Kata kunci : Pembangkit listrik, Steam turbine, Efisiensi.


Abstract

Unit Section Power Plant in PT Gresik Power Indonesia (The Linde Group) has operated for 18 years and has experienced problems a result of several factors such as the frequent occurrence of derating (decrease expenses), trip (unit shutdown) and error hearts operating and treatments can be lowered efficiency thermal, isentopic and electricity per unit on the general and Operating specifications turbines. In Final Project will be discussed regarding the analysis of thermal efficiency and isentropic steam turbine and efficiency electricity generated steam engine turbine in condition variation load at steam turbine 1 (ST-1) using the calculation of thermodynamics steam to be known from energy heat transformed being work and data theoretical calculations and electrical currents to review the calculation of electricity generated by the efficiency of steam turbine engines. Based operating manual calculations, thermal efficiency high paled loading at 6.170 MW is equal to 36.23% the condition is affected by the low temperatures and pressures in the condenser hearts. High efficiency isentropic fence while loading at 3.339 MW that 59.54% which is affected by the actual boarding costs comparison with working to review the isentropic expansion from the area is the duty turbine into out pressure turbine. The big fence electricity efficiency generated by a steam generator turbine loading is at 7.563 MW is equal to 97.64% That influenced by theoretical calculations compared with actual condition the plant generated electricity. Keywords : Generators, steam turbine, efficiency.


Detil Peneliti

Dosen Pembimbing 1 :Muhammad Shah
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERMESINAN KAPAL
Angkatan : 2013


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.