Perencanaan Penambahan Jalur Pipa Pada Sistem Pendingin Bearing Circulating Water Pump Type 1800HLBK-20.2

ADDITION PIPING SYSTEM PLANNING at COOLING BEARING SYSTEM Of CIRCULATING WATER PUMP TYPE 1800HLBK-20.2

Doni Purwoto (6313030004)


Abstrak

PERENCANAAN PENAMBAHAN JALUR PIPA PADA SISTEM PENDINGIN BEARING CIRCULATING WATER PUMP TYPE 1800HLBK-20.2 Nama : Doni Purwoto NRP : 6313030004 Dosen Pembimbing : Projek Priyonggo S.L., ST.,MT ABSTRAK Di PLTU 1 Jawa Timur Circulating water pump Type 1800HLBK-20.2 merupakan komponen yang terdapat pada siklus air dan uap (water and steam) yang berfungsi sebagai pemindah fluida yang berupa air laut menuju ke condenser sebagai media penukar panas. Setiap sistem penunjang kerjanya harus dijaga kehandalannya, salah satunya pada sistem pendingin dari bearing yang terpasang pada poros pompa. Dengan tujuan menyempurnakan sistem pendingin bearing Circulating water pump, maka dalam Tugas Akhir ini direncanakan penambahan jalur sistem pendingin beserta kapasitas daya pompa yang dibutuhkan. Dari hasil perhitungan didapatkan kapasitas yang dibutuhkan untuk 4(empat) pompa circulating water pump adalah 24 m?/jam. Dengan perhitungan berdasarkan sistem yang direncanakan, besarnya head yang dibutuhkan adalah sebesar 44,596m. Sehingga kebutuhan daya pompa dari sistem pendingin bearing Circulating water pump Type 1800HLBK-20.2 adalah sebesar 3,79 kW. Kata Kunci: Bearing, Circulating water pump, Pendingin, Pipe Line


Abstract

ADDITION PIPING SYSTEM PLANNING at COOLING BEARING SYSTEM Of CIRCULATING WATER PUMP TYPE 1800HLBK-20.2 Name : Doni Purwoto NRP : 6313030004 Counsellor Lecturer : Projek Priyonggo S.L.,ST.,MT ABSTRACT In East Java Power Plant 1 Circulating water pump Type 1800HLBK-20.2 is a component contained in the water cycle and steam that serves as a transfer fluid in the form of sea water get to the condenser for heat exchanger. Each work must be maintained support system reliability, one of them on the cooling system of a bearing mounted on the pump shaft. With the goal to perfecting the cooling bearing system of circulating water pump, so in this final project is planned addition of pipe line system along with the required pump capacity. From the results of the calculation, the necessary capacity to four (4) pumps circulating water pump is 24 m? / hour. With calculations based on the planned system, the amount of head required is for 44,596 m. So that the power requirement of the cooling bearing system pump circulating water pump type 1800HLBK-20.2 is of 3,79 kW. Keywords: Bearing, Circulating water pump, Cooling, Pipe Line


Detil Peneliti

Dosen Pembimbing 1 :Projek Priyonggo Sumangun
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERMESINAN KAPAL
Angkatan : 2013


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.