ANALISA PENJADWALAN DENGAN MENGGUNAKAN NETWORK PLANNING DALAM RANGKA MENGEFEKTIFKAN WAKTU DAN BIAYA OVERHAUL GAS TURBIN DI PT. PJB UP Gresik

ANALYSIS SCHEDULING USING NETWORK PLANNING ON EFFECTIVE OVERHAUL TIME AND COST GAS TURBINE IN PT. PJB UP Gresik

Fariz Dwi Suryanto (6312030052)


Abstrak

ABSTRAK Network planning memperlihatkan hubungan antar satu kegiatan dengan kegiatan lain yang saling berhubungan, untuk mengusahakan waktu yang optimal dan penyelesaian proyek. Dengan menggunakan salah satu teknik yaitu Critical Path Method (CPM) dalam penjadwalan Overhoul Gas turbin di PT. PJB UP Gresik, dapat diketahui bagian mana saja yang perlu didahulukan pengerjaannya (kegiatan kritis) agar tidak terjadi pemborosan waktu ataupun keterlambatan. Metode yang digunakan adalah metode deskriptif analisis, dimana data-data yang dikumpulkan penulis dengan cara observasi langsung ke perusahaan dan kelokasi proyek, wawancara dan studi literatur pustaka diolah, yang kemudian dianalisis sehingga dapat diperoleh gambaran mengenai penjadwalan waktu dan biaya yang dapat dipertimbangkan dan dapat diterapkan dalam perusahaan. Berdasarkan hasil penelitian dan perhitungan perencanaan waktu dan biaya yang menggunakan network planning dengan metode lintasan kritis (CPM) tepat untuk diterapkan di perusahaan pada perencanaan waktu dan biaya proyeknya, karena lebih meningkatkan efisiensi waktu dan biaya proyek. Waktu proyek mempunyai efisiensi 1,25 hari atau sebesar 5,65%, dan biaya proyeknya mempunyai efisiensi sebesar Rp. 1.278.225,00 atau sebesar 1,36%. KataKunci : Critical Path Methode (CPM), Deskriptif, Gas Turbin, Network Planning, Overhaul


Abstract

ABSTRACK Network planning shows the relationship between the activities with other activities that are interconnected, to seek the optimal time and completion of the project. Using one of the techniques that Critical Path Method (CPM) scheduling Overhoul Gas turbines in PT. PJB UP Gresik, can know which parts need to be in the process of precedence (critical activities) in order to avoid wastage of time or delay. The method used is descriptive method of analysis, in which data collected by observation the author directly to the company and localized projects, interviews and literature studies and processed literature, which is then analyzed so as to obtain an overview of the scheduling of time and costs that can be considered and can be applied in the company. Based on the results of research and calculation time and cost planning using network planning with critical path method (CPM) right to be applied in the company at the time of planning and project costs, due to further increase the efficiency of time and project costs. Have an efficiency project time 1.25 days or by 5.65%, and the cost of the project has an efficiency of Rp. 1,278,225.00 or 1.36%. Keywords : Critical Path Methode (CPM), Descriptive, Gas Turbin Network Planning, Overhaul


Detil Peneliti

Dosen Pembimbing 1 :Arie Indartono
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERMESINAN KAPAL
Angkatan : 2012


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.