"Studi Pemilihan Pompa Instalasi Hydrofinishing di Industri Minyak Pelumas (Studi Kasus di PT. ALP Petro Industry Pasuruan)"

"Study Selection of Instalation Hydrofinishing Pump in Lubricating Oil Industry (Study Case in PT. ALP Petro Industry Pasuruan)"

Putu Abdulloh (6312030049)


Abstrak

Pompa P-101 A/B di PT. ALP PETRO INDUSTRY digunakan untuk mendukung proses hydrofinshing oil, pompa P-101 A/B bekerja secara continuous berfungsi untuk memindahkan oli dari intermediate oil storage tank menuju fire heater H-101. Pompa tersebut memiliki tipe screw-horizontal pump dengan spesifikasi temperatur kerja 40-55oC sedangkan temperatur maksimal desain 100oC dalam operasionalnya temperatur oli mencapai 105,2oC. Dengan adanya temperatur yang berlebih akan menimbulkan penurunan peformansi pompa meliputi laju aliran massa oli dari desain sebesar 4400kg/h sedangkan operasionalnya hanya mencapai 3510kg/h dan discharge pressure pompa mengalami penurunan semula 76bar menjadi 71bar. Penelitian ini bertujuan untuk menyelesaikan permasalahan tersebut dengan cara membuat tiga desain instalasi hydrofinishing menggunakan software Pipe Flow Expert. Analisa dan perhitungan dilakukan untuk mendapatkan pompa pengganti yang sesuai. Hasil analisa dan perhitungan didapatkan nilai daya pompa sebesar 9,6kW, head pompa sebesar 858m. Jenis pompa yang sesuai yaitu screw pump dengan merk Settima Pump dan desain yang lebih efektif adalah desain 3 yang memiliki head 878,7m, NPSHa 35,3m, suction pressure 2,1bar, discharge pressure 80,74bar, serta diameter suction dan discharge pipa 3,5inc yang ditentukan berdasarkan nilai economic velocity. Kata Kunci : Pompa, Temperatur, Desain, Head, dan Daya.


Abstract

Pump P-101 A / B PT. ALP PETRO INDUSTRY used to support the process hydrofinshing oil, pump P-101 A / B continuous work serves to remove oil from the intermediate oil storage tank fire toward the heater H-101. The pump has a horizontal screw-type pump with a working temperature specifications 40-55oC while the maximum temperature of 100oC design in operation oil temperature reaches 105,2oC. With the excessive temperatures will cause a decrease in pump peformansi includes the mass flow rate of oil from the design of 4400kg / h while operations only reached 3510kg / h and pump discharge pressure decreased initially be 71bar 76bar. This study aims to resolve these problems by creating three designs hydrofinishing installation using Pipe Flow Expert software. Analysis and calculations performed to obtain the appropriate replacement pump. Results of analysis and calculation of the value obtained for 9,6kW pump power, pump head of 858m. Type the appropriate pump is a screw pump with a brand Settima Pump and more effective design is a third design that has a head 878,7m, NPSHa 35,3m, 2,1bar suction pressure, discharge pressure 80,74bar, as well as the diameter of the suction and discharge pipes 3,5inc determined based on the economic value of velocity. Keywords: Pump, Temperature, Design, Head, and Power.


Detil Peneliti

Dosen Pembimbing 1 :George Endri K
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERMESINAN KAPAL
Angkatan : 2012


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.