ABSTRAK PERENCANAAN ULANG SISTEM CIRCULATING WATER PUMP (CWP)DI PT. THE LINDE GRUP Oleh Suhardianto NRP : 6310030016 Dalam sistem perpipaan, panjang dan alur pipa sangat berpengaruh terhadap head pompa, karena mayor loses yang terjadi disepanjang pipa dan minor loses yang terjadi akibat fitting maupun alat bantu lainya akan semakin besar. Di PT. The Linde Group instalasi perpipaan sea water cooling yang digunakan untuk proses kondensasi cukup rumit, sehingga menyebabkan loses yang terjadi semakin besar, besarnya loses yang terjadi pada pipa akan menyebabkan head pompa semakin besar, akibatnya daya pompa yang dibutuhkan juga semakin besar, padahal hal ini sebenarnya dapat dihindari dengan menyederhanakan instalasi pipa yang sudah ada. Tugas akhir ini bertujuan untuk meredesain instalasi pipa sea water yang sekarang digunakan sehingga didapatkan desain instalasi yang efisien. Analisa yang dilakukan adalah menghitung head pompa,menghitung mayor loses dan minor loses, menghitung daya pompa, dan daya poros. Kemudian membandingkan spesifikasi pompa yang sudah digunakan dengan perhitungan desain yang telah dilakukan dengan mengunakan debit yang dibutuhkan sama. Hasil perhitungan redesain didapatkan bahwa head yang diperoleh lebih kecil daripada head yang diperoleh dari desain awal, yaitu sebesar 8,47m sedangkan head dari desain awal adalah sebesar 19,2m. Daya pompa yang diperlukan dari perhitungan redesain sebesar 138,493Watt, sedangkan daya pompa dari desain awal adalah sebesar 445Kw. Kata kunci: pompa, head,daya,instalasi pipa.


Abstract

ABSTRACT REDESIGN OF CIRCULATING WATER PUMP (CWP) SYSTEM IN PT. THE LINDE GRUP by Suhardianto NRP: 6310030016 In piping systems, the pipe length and the flow is very influential on the pump head, because it loses that occur along the major and minor plumbing loses caused by fittings and other tools will be even greater. In PT. The Linde Group piping installation sea water used for cooling the condensation process is quite complicated, so it loses that occurs causes greater, the amount of loses that occur in the pipe will cause the pump head is getting big, consequently pump power required is also greater, but it is actually can be avoided by simplifying the existing pipe installation. This thesis aims to redesign the sea water pipe installation is now used to obtain an efficient plant design. Analysis is performed to calculate the pump head, counting major and minor loses loses, calculate the pump power, and the power shaft. Then compare the specifications of the pump that has been used with design calculations have been done using the same discharge is needed. Redesigning the calculation results obtained showed that the head is smaller than the head obtained from the initial design, which is of 8.47 m while the head of the initial design is at 19.2 m. Pump power required from the calculation of 138.493 Watt redesign, while the initial design of the pump power Is equalto 445Kw. Keywords: pump, head, power, pipeline installation.


Detil Peneliti

Dosen Pembimbing 1 :Projek Priyonggo Sumangun
Dosen Pembimbing 2 : Aang Wahidin

Program Studi : D3 - TEKNIK PERMESINAN KAPAL
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.