ANALISA OPTIMASI WAKTU DAN BIAYA GENERAL OVERHAUL MESIN YANMAR 6 CXM-GTYE PADA KAPAL MP III 01

OPTIMIZATION ANALYSIS OF TIME AND COST GENERAL OVERHAUL YANMAR ENGINE 6 CXM-GTYE ON THE SHIP MP III 01

Choirul Arifin (6310030002)


Abstrak

ANALISA OPTIMASI WAKTU DAN BIAYA GENERAL OVERHAUL MESIN YANMAR 6 CXM-GTYE PADA KAPAL MP III 01 Nama Mahasiswa : Choirul Arifin NRP : 6310030002 Jurusan : Teknik Permesinan Kapal, PPNS Dosen Pembimbing : Pranowo Sidi, ST., MT. ABSTRAK Kapal merupakan suatu alat yang digunakan sebagai sarana transportasi di laut. Kapal pada waktu beroperasi akan mengalami berbagai macam kondisi yang dapat menyebabkan kerusakan atau penurunan kualitas mesin induk sehingga diperlukan suatu perbaikan dan perawatan. Salah satu kapal yang membutuhkan perbaikan dan perawatan adalah Kapal MP III 01. Dalam perbaikan dan perawatan Kapal MP III 01 ini akan dilakukan kegiatan general overhaul. Dengan adanya kegiatan general overhaul yang semakin banyak pergantian komponennya maka akan timbul berbagai macam kendala antara lain waktu pengerjaan yang tidak sesuai rencana serta biaya yang dikeluarkan akan semakin meningkat sehingga perlu dicari efektifitas kegiatan general overhaul. Untuk mencari efektifitas kegiatan serta biaya yang diperlukan, digunakan metode lintasan kritis (CPM). Dari hasil analisa yang di dapat melalui jalur kritis penyelesaian kegiatan general overhaul mesin Yanmar 6 CXM-GTYE membutuhkan waktu 43,96 jam dengan efisiensi biaya pekerjaan sebesar Rp 399.992,00. Dengan merencanakan jadwal kegiatan dengan menggunakan metode lintasan kritis (CPM) akan didapatkan waktu tercepat penyelesaian kegiatan dengan biaya yang optimal. Kata kunci : general overhaul, lintasan kritis, biaya, waktu


Abstract

OPTIMIZATION ANALYSIS OF TIME AND COST GENERAL OVERHAUL YANMAR ENGINE 6 CXM-GTYE ON THE SHIP MP III 01 Name : Choirul Arifin NRP : 6310030002 Department : Marine Engineering, PPNS Dosen Counsellor : Pranowo Sidi, ST., MT. ABSTRACT Ship is a tool that used as means of transportation on the sea. Ship at the time of operation will experience variety conditions that can cause damage or loss of quality so it need a main engine repair and maintenance. One of the ships in need repair and maintenance is ships MP III 01. Ship repair and maintenance in MP III 01 will take place general overhaul activities. With the general overhaul activities are more and more turn of the components will give rise variety constraints, such as processing time is not according to plan and the cost will be increased so that the effectiveness of the activities necessary to find a general overhaul. To find the effectiveness of activities and costs required, we use the critical path method (CPM). Analysis of the results obtained through the completion of the critical path construction general overhaul Yanmar engine 6-GTYE CXM takes 43.96 hours with cost efficiency Rp 399,992.00. With the planned schedule of activities using the critical path method (CPM) will get the fastest time of the completion of the optimal cost. Keywords: general overhaul, critical path, cost, time


Detil Peneliti

Dosen Pembimbing 1 :Pranowo Sidi
Dosen Pembimbing 2 : Pranowo Sidi

Program Studi : D3 - TEKNIK PERMESINAN KAPAL
Angkatan : 2010