PERENCANAAN LAYOUT GALANGAN PT.INDONESIA MARINA SHIPYARD DENGAN PENAMBAHAN LOKASI BANGUNAN BARU

LAYOUT PLANNING in PT INDONESIA MARINA SHIPYARD WITH ADDITION OF NEW BUILDING LOCATION

Agung Subekti (6212030025)


Abstrak

ABSTRAK Dalam perencanaan sebuah galangan baru, fasilitas merupakan salah satu faktor kunci yang dapat menentukan produktifitas, efektifitas dan efisiensi proses produksi, disamping manajemen proses produksi, sangat ditentukan oleh bentuk tata letak ( layout ) dari fasilitas ini, khususnya layout dari tempat ? tempat bagian proses produksi. Metode penelitian yang digunakan pada pembahasan ini merupakan langkah ? langkah penelitian secara berurutan diawali dengan perencanaan layout, perencanaan galangan, penentuan ukuran utama kapal kapasitas angkat slipway, perencanaan slipway, desaign cradle dan perhitungan daya motor winch. Dari hasil perencanaan dan perhitungan, didapatkan desain layout galangan yang lebih efisien dengan posisi gudang dan infrastruktur fasilitas galangan lebih dekat agar memudahkan perpindahan material. Penentuan pembebanan slipway 4000 TON, didapatkan dari LWT kapal dan cradle peluncur. Beban yang ditahan oleh sebuah roda = 125 TON. Dari beban tersebut berdasarkan dimensi kapal direncanakan slipway yang berupa bidang tercelup air dan bagian yang diatas air. Kata kunci : Layout galangan, slipway, cradle


Abstract

ABSTRACT Before planning a new shipyard, the facility is one of the key factors that can determine the productivity, effectiveness and efficiency of the production process, in addition to management of the production process, is determined by the shape of the layout (layout) of this facility, especially the layout of the place - where part of the process of production , The method used in this final project is a step - step study sequentially begin with the planning of layout, planning of shipyard, the main size of ship lift capacity on slipway, planning of slipway, cradle desaign and power calculation of winch motor. From the planning and calculation, obtained shipyard layout design which more shipyard are efficient with the position of the warehouse and infrastructure facilities closer shipyard in order to facilitate transfer of the material. Determination of loading 4000 TON slipway, obtained from LWT boats and cradle launcher. Load held by a wheel = 125 TON. from the load based on the dimensions of the planned vessel slipway in from the result of the load based on the dimension of the vessel planned slipway in the form of. Keywords: Layout shipyard, slipway, cradle


Detil Peneliti

Dosen Pembimbing 1 :Bambang Teguh Setiawan
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK BANGUNAN KAPAL
Angkatan : 2012


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.