ANALISIS KEBOCORAN PADA INSTALASI SUBSEA HOSE SEBAGAI KOMPONEN PENDUKUNG SINGLE POINT MOORING SEBAGAI FASILITAS LOADING / UNLOADING KAPAL TANKER DI KILANG MINYAK

ANALYSIS OF LEAK IN SUBSEA HOSE INSTALLATION AS SUPPORTED COMPONENT OF SINGLE POINT MOORING AS LOADING / UNLOADING FACILITY OF TANKER SHIP IN REFINERY OIL

Diko Hamdani (6211030007)


Abstrak

Pada proses penggantian subsea hose lama serta instalasi subsea hose baru sampai fix terpasang ternyata dijumpai kebocoran pada sambungan antar flangenya, terdapat di hose yang menyambung ke PLEM. Berdasarkan hal tersebut maka dilakukan analisa apa penyebab kebocoran pada subsea hose serta penanggulangannya. Proses dimulai dengan perakitan subsea hose, lalu penggantian subsea hose lama dengan membuka sambungan pada Single Point Mooring dan Pipe Line End Manifold dan angkat subsea hose dari dasar laut. Setelah subsea hose lama diganti dengan baru, subsea hose diturunkan lalu diinstal sampai yang baru fix terpasang. Setelah menyelesaikan instalasi subsea hose maka dilakukan survey asbuilt untuk mengecek kualitas instalasi, jika terdapat kebocoran maka dilakukan penanganan sesuai dengan standar. Penyebab kebocoran ada dua hal yaitu, gasket yang rusak dan baut yang kurang kencang, saat mengencangkan baut kurang teliti, juga faktor lingkungan laut yang keruh serta arus yang kuat menyebabkan visibility penyelam kurang baik saat mengerjakan pengencangan baut bagian ini. Kata kunci : Subsea Hose, Single Point Mooring, Pipe Line End Manifold


Abstract

In the process of replacing the old subsea hose and installation of a new subsea hose installed till it fix turned out to be found a leak on the connection between its flange, contained in the hose that connects to PLEM. Based on this, analysis is carried out what the cause of the leak on subsea hose and how to handle it. The process begins with the subsea hose assembly, and replacement of old subsea hose by opening a connection to the Single Point Mooring and Pipe Line End Manifold and lift subsea hose from the bottom of the sea. After a old subsea hose replaced with a new, lowered and installed subsea hose until a new fix is attached. After completing the installation of the subsea hose asbuilt survey to check the quality of the installation, if there is a leak then carried out in accordance with the standards treatment. The cause of the leak there are two things, faulty gaskets and bolts are less tight, less careful when tightening bolts, also environmental factors that murky sea and strong currents causing poor visibility when divers working on tightening bolts of this section. Keywords: Subsea Hose, Single Point Mooring, Pipe Line End Manifold


Detil Peneliti

Dosen Pembimbing 1 :Budianto
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK BANGUNAN KAPAL
Angkatan : 2011