PERENCANAAN BENGKEL BLASTING DAN CAT SEBAGAI FASILITAS PENDUKUNG GALANGAN DI PT. DOK PANTAI LAMONGAN

PLANNING BLASTING AND PAINTING WORKSHOP AS FACILITIES SUPPORT OF SHIPYARD IN PT. DOK PANTAI LAMONGAN

Bagus Prambudi (6210030013)


Abstrak

Perencanaan bengkel blasting dan cat diperlukan untuk perusahaan galangan kapal yang bergerak dalam bidang produksi pembangunan kapal baru, terutama pada PT. Dok Pantai Lamongan yang akan mengembangkan bidang usahanya dalam produksi kapal baru. Dimana dalam alur proses produksi sebuah kapal baru, terdapat kegiatan blasting dan painting sebelum dilakukan proses erection (penggabungan block kapal). Selain itu, apabila kegiatan blasting dan cat dilakukan di ruang terbuka sangat berbahaya bagi kesehatan para pekerja dan pemukiman warga sekitar galangan. Metode yang digunakan dalam penulisan final project ini adalah melakukan pengamatan di lapangan dan mengumpulkan data ? data yang diperlukan dalam penulisan final project ini. Selain melakukan pengamatan secara langsung, juga dilakukan perhitungan secara teori dalam menentukan dimensi bengkel blasting dan cat, estimasi jam kerja dan biaya tenaga kerja orang untuk proses kegiatan blasting dan pengecatan. Berdasarkan analisa dan perhitungan yang dilakukan maka didapatkan hasil dari perencanaan bengkel blasting dan cat tersebut adalah dengan dimensi bengkel 40 m x 25 m x 12 m, Fasilitas bengkel yang digunakan : Overhead Travelling Crane, Cyclone Turbin Ventilator, Blast Machine, Nozzle Blasting ,Sand Pump, Wire Brushing Electric , Roll cat, Kuas cat, Bak penampung Sand Blasting, Airless Spray Pump, Selang Airless, dan Coperslag. Adapun estimasi jam orang dan biaya tenaga kerja untuk kegiatan blasting = 15 m2/ jam dengan lamanya pekerjaan 18 jam ( 3 hari ) , biaya = Rp 1.740.000 , dan untuk kegiatan painting = 20 m2/jam dengan lamanya pekerjaan 13,5 jam ( 3 hari ) , biaya = Rp 1.845.000. Kata kunci : PT. Dok Pantai Lamongan , Blasting , Painting


Abstract

Blasting and painting workshop palnning is indispensable for shipbuilding companies engaged in the production of new shipbuilding, especially on PT. Dok Pantai Lamongan which will develop its business in the production of new vessels. Where the flow of the production process above a new ship , there is a blasting and painting activities before erection. Besides, if blasting and painting activities carried out in an open space is very dangerous to the helath of workers and the residential area around the shipyard. Methods used in the final project is to make observations in the field and collect the data ? data that is needed in the final project. In addition to direct observation, also perfomed theoritical calculations in dertemining dimensions blasting and painting workshop, the estimated hours of work and the labor costs for blasting and painting activities. Based on analysis and calculations conducted the result obtained from the planning workshop blasting and painting is dimensions 40 m x 25 m x 12 m, workshop facilities are used : Overhead Travelling Crane with capacity 65 ton, Blast Machine, Nozzle Blasting, Sand Pump, Wire Brushing Electric ,Coating Rol, Coating Brush, Receiving box of sand blasting, Airless Spray Pump, Airless hose, and Coperslag. As for the estimation of man hours and labor costs blasting = 15 m2/ hour and the duration of the job 18 hour ( 3 days ) , costs = Rp 1.740.000 , and for painting activities = 20 m2/hour and the duration of the job 13,5 hour ( 3 days ) , costs = Rp 1.845.000. Keyword : PT. Dock Pantai Lamongan , Blasting , Painting


Detil Peneliti

Dosen Pembimbing 1 :Muhammad Mahfud
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK BANGUNAN KAPAL
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.