ANALISA KETIDAKSESUAIAN WAKTU PENGERJAAN BLOCK 112 , 312 DAN 120 PADA KAPAL PERINTIS SABUK NUSANTARA 57

ANALYSIS MISMATCHES WORKING TIME BLOCK 112, 312 AND 120 ON THE SABUK NUSANTARA 57 SHIP PIONEERS

Nisrina Nur Afifah (6113030062)


Abstrak

ABSTRAK Schedule adalah urutan-urutan kegiatan suatu proyek secara pasti yang direncanakan sebelum proyek tersebut di laksanakan hingga selesai. Perencanaan schedule sangat penting dilakukan agar tidak terjadi keterlambatan dalam proses pelaksanaan proyek pembangunan kapal. . Pada Tugas Akhir ini akan membandingkan data schedule perencanaan dengan di lapangan dalam pembuatan block 112, 312 dan 120. Kegiatan pengerjaan pembangunan block kapal tediri dari proses pengerjaan block yaitu drawing block ,nesting, material block, fabrikasi block, assembly block dan erection block. Hasil dari analisa perbandingan didapatkan perbedaan jumlah estimasi waktu antara perencanaan dengan schedule di lapangan. Keterlambatan pada block 112, 312, dan 120 terdapat pada kegiatan material block. Pada block 112 pemesanan mesin dan perlengkapannya yang jauh dan tidak dalam satu Negara, sedangkan pada block 312 dan block 120 pemesanan material jauh,tidak dalam lingkungan perusahaan galangan. Waktu efektif (te) pada block 112 pada kegiatan material block 19 hari, sedangkan pada block 312 kegiatan material block sebesar 12 hari, dan pada block 120 sebesar 16 hari. Ketidaksesuain pada block 120 dikarenakan ada penambahan waktu pada perencanaan schedule di kegiatan assembly. Perbandingan pada schedule perencanaan dan di lapangan block 112 sebesar 21 diambil data dari standard deviasi pada kegiatan material block, jauh bervariasi. Sedangkan block 312 perbandingan schedule perencanaan dengan di lapangan sebesar 6 maka data semakin sama dengan perencanaan, dan pada block 120 terjadi sedikit keterlambatan dan cukup besar pada kegiatan material block sebesar 11.


Abstract

ABSTRACT Schedule is the sequence of activities a project is definitely planned before the project was carried to completion. Planning schedule is very important in order to avoid delays in the project implementation process of ship building. , In this final project will compare the data with the planning schedule in the field in block manufacture 112.312 and 120. Activity workmanship ship building block consisting of blocks that the process of drawing blocks, nesting, material block, block fabrication, assembly and erection block. Result block of a comparative analysis was no difference in estimated amount of time between planning schedule in the field. Delays in blocks 112, 312, and 120 are on a block of material activities. In the 112 block booking engine and equipment that far and not in one country, while in block 312 and block 120 booking material away, not in a shipyard environment. The effective time (te) in block 112 on the activities of the material block 19 days, while in the 312 block block material activities for 12 days, and at block 120 by 16 days. Non-conformance in block 120 because no additional time on the schedule in the planning of assembly activities. Comparison of the schedule in the field of planning and 112 blocks of 21 data taken from the standard deviation of the block of material activities, infinitely varied. While the 312 block comparison with the planning schedule in the field by 6 then the data more closely with the planning, and in block 120 there was a slight delay and a large proportion of the activities of the material block 11.


Detil Peneliti

Dosen Pembimbing 1 :Fitri Hardiyanti
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERANCANGAN DAN KONSTRUKSI KAPAL
Angkatan : 2013


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.