PENERAPAN MATERIAL REQUIREMENT PLANNING (MRP) DAN MAN HOURS PADA PEMBANGUNAN BLOK 5 ODYSSEY SHIPPING LINE DI PT. DOK DAN PERKAPALAN SURABAYA

APPLICATION OF MATERIAL REQUIREMENT PLANNING (MRP) AND MAN HOURS ON BUILDING BLOCK 5 ODYSSEY SHIPPING LINE IN PT. DOCK AND SHIPPING SURABAYA

Miskli Iska Nanda (6113030056)


Abstrak

ABSTRAK Proses perencanaan pembangunan kapal baru bisa dibilang tidak mudah dan sangat mahal. Bukan hanya material saja, namun juga perlu tenaga kerja yang banyak dalam pembangunannya. Pada Tugas akhir ini akan meminimalisir material yang terbuang, merencanakan kebutuhan material dan kebutuhan jam orang untuk proyek bangunan baru blok 5 kapal Odyssey Shipping Line. Perlu fasilitas dan sarana pendukung untuk manajemen pembangunan kapal. Salah satunya adalah dengan menggambar production drawing berbasis CAD untuk merencanakan material yang harus dibelanjakan, material yang akan digunakan, dan meminimalkan material yang terbuang. Perencanaan material ini dapat dengan menggunakan metode Material Requirement Planning (MRP) untuk mengontrol material tersebut agar sesuai dengan gambar dan target material yang terbuang maksimal sebesar 20 %. Hasil dari perencanaan MRP untuk meminimalisir material yang terbuang adalah 18,60 %, sehingga hasil tersebut telah memenuhi standar perencanaan untuk belanja material. Jumlah kebutuhan plat yang harus dibeli untuk belanja material adalah sebanyak 103 lembar plat yang tebalnya 10 mm, 11 mm, 12 mm, dan 15 mm dalam bervariasi ukuran dengan berat 109393.33 Kg. Sedangkan untuk kebutuhan profil terdapat 4 ukuran bulb plate yaitu BP 220 mm x 12 mm x 8800 mm sebanyak 68 lonjor, BP 240 mm x 12 mm x 8800 mm sebanyak 2 lonjor, BP 180 mm x 10 mm x 8800 mm sebanyak 11 lonjor, BP 160 mm x 9 mm x 8800 mm sebanyak 11 lonjor, serta profil T 100 mm x 10 mm 150 mm x 10 mm FF sebanyak 8 lonjor. Hasil perhitungan yang didapatkan untuk perencanaan jam orang untuk tahap pabrikasi adalah 1176,87 JO, assembly sebesar 5884,33 JO, sedangkan untuk tahap erection adalah 4903,60 JO sehingga total jam orang yang direncanakan mencapai 11964,79 JO. Kata Kunci: material requirement planning, waste, jam orang


Abstract

ABSTRACT The process of the construction of a new ship could arguably not easy and very expensive. Not only material, but also need a lot of manpower in the construction. In this final project will minimize material is wasted, planning of material needs and the needs of man hours in a new building block 5 ship Odyssey Shipping Line. Necessary facilities and means for supporting the management of the construction of the ship. One of them is by drawing a production drawing-based CAD for planning materials that must be spent, materials to be used, and minimizes wasted material. The planning of this material can be by using the method of Material Requirement Planning (MRP) to control the material to fit the image of the target material is wasted and a maximum of 20%. The result of the MRP planning to minimize material wastage was 18.60%, so those results have met the standard of planning to shop for material. Number plate needs to be bought for the material is as much as 103 sheet plate thick 10 mm, 11 mm, 12 mm, and 15 mm in size varies with the weight of 109393.33 Kg while for profile needs. There are 4 bulb plate size is. BP 220 mm x 12 mm x 8800 mm as much as 68 pieces, BP 240 mm x 12 mm x 8800 mm 2 pieces, BP 180 mm x 10 mm x 8800 mm total of 11 pieces, BP 160 mm x 9 mm x 8800 mm total of 11 pieces, as well as the T profile 100 mm x 10 mm 150 mm x 10 mm FF as much as 8 pieces. The calculation result obtained for planning man hours to stage their productions is the 1176.87 assembly of 5884.33 JO, JO, while for stages of erection is 4903.60 JO so that the total hours of people who planned to reach 11964.79 JO. Keywords: material requirement planning, waste, man hours


Detil Peneliti

Dosen Pembimbing 1 :Aang Wahidin
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERANCANGAN DAN KONSTRUKSI KAPAL
Angkatan : 2013


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.