ESTIMASI BIAYA REPLATING LAMBUNG KAPAL LCT. PERKASA PRIMA 5 DITINJAU DARI KEBUTUHAN PELAT, CONSUMABLE PENGELASAN DAN JAM ORANG

ESTIMATED COST REPLATING HULL LCT. PERKASA PRIMA 5 VIEWED FROM PLATE NEEDS, CONSUMABLE WELDING AND MAN HOURS

Muh. Syaifudin Thoha (6113030034)


Abstrak

Perawatan dan reparasi adalah salah satu hal yang penting dilakukan pada suatu kapal, terutama pada bagian lambung. Lambung kapal yang setiap harinya terendam oleh air laut tentunya akan mengalami oksidasi sehingga menyebabkan terjadinya pengurangan ketebalan pelat kapal itu sendiri dan akan mempengaruhi panjang-pendeknya umur kapal. Jika pada pelat lambung kapal pengurangan ketebalan pelatnya sudah sama dengan atau lebih dari 20% ketebalan pelat aslinya maka perlu dilakukan proses replating. Pada tugas akhir ini membahas tentang estimasi biaya replating lambung kapal LCT. Perkasa Prima 5 ditinjau dari kebutuhan pelat, consumable pengelasan dan jam orang di PT. Tambanganraya Permai Surabaya. Dari perhitungan yang dilakukan meliputi kebutuhan pelat sebanyak 38394.21 kg, kebutuhan material pengelasan (Elektroda) sebanyak 842.8959193 kg, Kebutuhan daya mesin las Output sebesar 72.5 KW dan Input sebesar 85.29 KW dan jam orang sebanyak 290.35 Jam atau 37.5 hari. Dari pembahasan diatas dapat diketahui total biaya untuk proses replating lambung kapal LCT. Perkasa Prima 5 sebesar Rp 66.320.599.-, Yang terdiri dari biaya kebutuhan pelat, biaya material pengelasan (Elektroda), biaya penggunaan daya mesin las dan biaya pekerja.


Abstract

Maintenance and repair is one important thing to do on a ship, especially on the hull. Hull daily inundated by seawater certainly will oxidize, causing a reduction in the thickness of the slab itself and the ship will affect the length of life of the ship. If the hull plate thickness reduction platen is already equal to or more than 20% of its original thickness of the slab it is necessary to process replating. In this final project discusses the estimated cost of the ship's hull replating LCT. Prima Perkasa 5 in terms of the needs of the plate, welding consumables and man hours in PT. Tambanganraya Permai Surabaya. From the calculation includes plate needs as much as 38394.21 kg, the material needs welding (electrodes) as 842.8959193 kg, welding machine power requirements of 72.5 KW Output and Input of 290.35 KW and man hours as much as 289.50, or 37.5 days. From the discussion above it can be seen total costs for replating process hull LCT. Prima Perkasa 5 Rp 66.320.599.-, which consists of a plate demand charges, the cost of welding materials (electrodes), the cost of power usage welding machine and labor costs


Detil Peneliti

Dosen Pembimbing 1 :Muhammad Afif Shobach
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERANCANGAN DAN KONSTRUKSI KAPAL
Angkatan : 2013