ini CV.Javanesse Boat Indonesia sedang menyelesaikan proyek pembangunan kapal fiber J S 1330 P aram edi c Bo at 13 m , dimana pembangunan kapal tersebut mengalami ketidaksesuaian kebutuhan material ketika terjadi dilapangan dan ketidak sesuaian biaya material yang dikeluarkan dikarenakan perhitungan kebutuhan material yang direncanakan sendiri sesuai dengan pengalaman yang pernah dilakukan tidak sesuai dengan perhitungan regulasi BKI.Sehingga dalam tugas akhir ini dilakukan analisa perhitungan material kapal fiber JS 1330 paramedic Boats 13 meter berdasarkan regulasi BKI. Dengan melakukan survey pada lapangan dapat diambil data-data dan sistem pembuatan kapal fiber JS 1330 paramedic boats 13 meter dengan perhitungan perencanaan kebutuhan dan total biaya material yang sudah dilakukan pada saat pembangunan kapal tersebut saat dilapangan. Setelah itu melakukan perhitungan konstruksi dan perhitungan material dengan menggunakan regulasi BKI untuk mengetahui kesesuaian jumlah kebutuhan material utama pada saat dilapangan dengan perhitungan regulasi BKI, maka dapat diperoleh prosentase selisih dari perbandingan kebutuhan dan total biaya material dari pembangunan kapal tersebut. Hasil perhitungan berdasarkan perhitungan regulasi BKI material CSM (Chopped Strand Matt)300 gr/m? dengan jumlah volume 326.068 Kg, Woven Roving 600 gr/m? dengan jumlah volume 462.171 Kg, CatalistMepoxedengan jumlah volume 12.703 Kg,Yuccalac157BQTN-EX dengan jumlah volume 1258.798 Kg. Dari hasil perhitungan regulasi BKI didapatkan total biaya sebesar Rp 60.334.082,00. Sedangkan berdasarkan dari lapangan. material CSM (Chopped Strand Matt) 300 gr/m? dengan jumlah volume 411.008 Kg, Woven Roving 600 gr/m? dengan jumlah volume 532.9 Kg, Catalist Mepoxe dengan jumlah volume 16.3 Kg, Yuccalac 157 BQTN-EX dengan jumlah volume 1443.7 Kg. Dari hasil perhitungan lapangan didapatkan total biaya sebesar Rp 69.712.300,00. Perbandingan Kebutuhan total material, berdasarkan perhitungan regulasi BKI lebih rendah dibandingkan dengan jumlah kebutuhan total material dilapangandengan prosentase selisih sebesar 13.4% . Kata Kunci : Kebutuhan Material, Biaya Material, Perbandingan


Abstract

Currently CV. Javanesse Boat Indonesia is finalizing development of fiber JS 1330 Paramedic boats 13 meters, where the construction of the boat experienced a material discrepancy needs when discrepancies occur in the field and material costs incurred due to the calculation of his own material needs are planned in accordance with the experiences that have been done not in accordance with the calculation of BKI regulation, in this final analysis calculation fiber material JS 1330 paramedic boats 13 meters by BKI regulations. By conducting a field survey data can be retrieved and system manufacture fiber JS 1330 Paramedic boats 13 meters with demand planning and calculation of the total cost of the material that has been carried out during the construction of the boat while in the field. After that perform calculations and calculations of construction materials using BKI regulations to determine the suitability of the amount of primary material needs while in the field with the calculation of BKI regulations, it can be obtained from a comparison of the percentage difference between needs and total cost of construction of the boat material. The results of calculations based on the calculation of regulatory material BKI CSM (Chopped Strand Matt) 300 g/m? with a total volume of 326.068 Kg, Woven Roving 600 gr/m? with a total volume of 462.171 Kg, with a total volume Mepoxe Catalist 12.703 Kg, Yuccalac157BQTN-EX with a total volume of 1258.798 Kg. From the calculation results obtained regulatory BKI total cost of Rp 69.334.082,00. While based on the field. CSM (Chopped Strand Matt) material 300 g/m? with a total volume of 411.008 kg, Woven Roving 600 g /m? with a total volume of 532.9 kg, Catalist Mepoxe with a total volume of 16.3 Kg, 157 Yuccalac BQTN-EX with a total volume of 1443.7 Kg. From the calculation results can be obtained through the total cost of Rp69.712.300,00. Comparison of total requirement of material, based on the calculation of regulatory BKI lower than the total required amount of material in the field with a percentage difference of 13.4%. This is because when the construction vessel by workers in the field use of the material without causing material removal calculations. Keywords: Materials Requierment, Materials Cost, Comparison


Detil Peneliti

Dosen Pembimbing 1 :Muhammad Afif Shobach
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERANCANGAN DAN KONSTRUKSI KAPAL
Angkatan : 2012


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.