ANALISA PERHITUNGAN MATERIAL KAPAL FIBER PATROLI 8 METER DI PT.FIBER BOAT INDONESIA

AN ANALYSIS OF MATERIAL CALCULATION ON 8 METRE FIBRE PATROL BOAT IN PT.FIBER BOAT INDONESIA

Vandy Setia Prabowo (6111030051)


Abstrak

Saat ini PT. Fiber Boat Indonesia sedang menyelesaikan proyek pembangunan kapal fiber patroli 8 meter, dimana pembangunan kapal tersebut mengalami ketidaksesuaian kebutuhan material ketika terjadi dilapangan dan ketidak sesuaian biaya material yang dikeluarkan dikarenakan perhitungan kebutuhan material yang direncanakan sendiri sesuai dengan pengalaman yang pernah dilakukan tidak sesuai dengan perhitungan regulasi BKI.Sehingga dalam tugas akhir ini dilakukan analisa perhitungan material kapal fiber patroli 8 meter berdasarkan regulasi BKI. Dengan melakukan survey pada lapangan dapat diambil data-data dan sistem pembuatan kapal fiber patroli 8 meter dengan perhitungan perencanaan kebutuhan dan total biaya material yang sudah dilakukan pada saat pembangunan kapal tersebut saat dilapangan. Setelah itu melakukan perhitungan konstruksi dan perhitungan material dengan menggunakan regulasi BKI untuk mengetahui kesesuaian jumlah kebutuhan material utama pada saat dilapangan dengan perhitungan regulasi BKI, maka dapat diperoleh prosentase selisih dari perbandingan kebutuhan dan total biaya material dari pembangunan kapal tersebut. Hasil perhitungan berdasarkan perhitungan regulasi BKI material CSM (Chopped Strand Matt)300 gr/m? dengan jumlah volume 151,75Kg, Woven Roving 600 gr/m? dengan jumlah volume 210,611 Kg, CatalistMepoxe dengan jumlah volume 5,637 Kg,Yuccalac157BQTN-EX dengan jumlah volume 559,75 Kg. Dari hasil perhitungan regulasi BKI didapatkan total biaya sebesar Rp26.880.167,00. Sedangkan berdasarkan dari lapangan. material CSM (Chopped Strand Matt) 300 gr/m? dengan jumlah volume 202,161 Kg, Woven Roving 600 gr/m? dengan jumlah volume 280,744 Kg, Catalist Mepoxe dengan jumlah volume 7,489 Kg, Yuccalac 157 BQTN-EX dengan jumlah volume 746,161 Kg. Dari hasil perhitungan lapangan didapatkan total biaya sebesar Rp35.826.389,00. Perbandingan Kebutuhan total material, berdasarkan perhitungan regulasi BKI lebih rendah dibandingkan dengan jumlah kebutuhan total material dilapangan dengan prosentase selisih sebesar 25% . Kata Kunci : Kebutuhan Material, Biaya Material, Perbandingan


Abstract

Currently PT. Fiber Boat Indonesia is finalizing development of fiber patrol boats 8 meters, where the construction of the boat experienced a material discrepancy needs when discrepancies occur in the field and material costs incurred due to the calculation of his own material needs are planned in accordance with the experiences that have been done not in accordance with the calculation of BKI regulation, in this final analysis calculation fiber material patrol boats 8 meters by BKI regulations. By conducting a field survey data can be retrieved and system manufacture fiber patrol boats 8 meters with demand planning and calculation of the total cost of the material that has been carried out during the construction of the boat while in the field. After that perform calculations and calculations of construction materials using BKI regulations to determine the suitability of the amount of primary material needs while in the field with the calculation of BKI regulations, it can be obtained from a comparison of the percentage difference between needs and total cost of construction of the boat material. The results of calculations based on the calculation of regulatory material BKI CSM (Chopped Strand Matt) 300 g/m? with a total volume of 151,75 Kg, Woven Roving 600 gr/m? with a total volume of 210,611 Kg, with a total volume Mepoxe Catalist 5,637 Kg, Yuccalac157BQTN-EX with a total volume of 559,75 Kg. From the calculation results obtained regulatory BKI total cost of Rp26.880.167,00. While based on the field. CSM (Chopped Strand Matt) material 300 g/m? with a total volume of 202,161 kg, Woven Roving 600 g /m? with a total volume of 280,744 kg, Catalist Mepoxe with a total volume of 7,489 Kg, 157 Yuccalac BQTN-EX with a total volume of 746,161 Kg. From the calculation results can be obtained through the total cost of Rp35.826.389,00. Comparison of total requirement of material, based on the calculation of regulatory BKI lower than the total required amount of material in the field with a percentage difference of 25%. This is because when the construction vessel by workers in the field use of the material without causing material removal calculations. Keywords: Materials Requierment, Materials Cost, Comparison


Detil Peneliti

Dosen Pembimbing 1 :Ruddianto
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERANCANGAN DAN KONSTRUKSI KAPAL
Angkatan : 2011


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.