ANALISA WAKTU DAN BIAYA PENYELESAIAN PROYEK PONTON DENGAN MEMANFAATKAN BLOCK SISA KAPAL BOX SHAPE BULK CARIER (BSBC) 50.000 DWT SERI M00256 DAN M00257 DI PT. PAL INDONESIA (PERSERO)

THE ANALYSIS OF TIME AND COST A PONTOON COMPLETION PROJECT BY USING THE LEFTOVER SHIP BLOCK FROM BOX SHAPE BULK CARIER (BSBC) 50.000 DWT SERIES M00256 AND M00257 IN PT. PAL INDONESIA (PERSERO)

Alfiatus Sholeha (6110030003)


Abstrak

ANALISA WAKTU DAN BIAYA PENYELESAIAN PROYEK PONTON DENGAN MEMANFAATKAN BLOCK SISA KAPAL BOX SHAPE BULK CARIER (BSBC) 50.000 DWT SERI M000256 DAN M000257 DI PT. PAL INDONESIA (PERSERO) Oleh : Alfiatus Sholeha NRP : 6110030003 ABSTRAK Proyek ?gagal? kapal Box Shape Bulk Carrier (BSBC) 50.000 DWT seri M000256 dan M000257 meninggalkan banyak blok yang tergeletak sia-sia di area side launching Divisi Kapal Niaga PT. PAL. Untuk menanggulangi itu, maka dilakukan langkah pemanfaatan kembali (reuse) dari sisa-sisa blok tersebut untuk dijadikan ponton yang bernilai guna ekonomis bagi perusahaan, yakni untuk operasional reparasi kapal dan block carrier (pengangkut blok). Dalam tugas akhir ini dilakukan analisa mengenai detail biaya proses cutting dan welding serta waktu yang diperlukan untuk modifikasi block DB5 dan DB6 menjadi sebuah ponton. Proses perhitungan dilakukan dengan mengukur setiap block untuk dilakukan proses cutting manual pada block DB5 dan DB6 serta penyambungan block-block yang disesuaikan dengan design dan jenis pengelasannya. Total waktu yang digunakan untuk proses modifikasi dan produksi kontruksi tambahan yang di kerjakan di PT. PAL INDONESIA (Persero) yakni ?45 hari. Adapun total biaya untuk modifikasi ponton sebesar Rp. 358.175.956,- dengan rincian biaya tenaga kerja untuk cutting block lama sebesar Rp. 4.320.000,- biaya consumable Rp. 319.200.000,- , biaya tenaga kerja welding Rp. 2.700.000, biaya consumable Rp. 31.955.956,- dan untuk total biaya kontruksi tambahan sebesar Rp.86.119.929,- dengan rincian consumable sebesar Rp 69.589.753,- dan biaya tenaga kerja sebesar Rp. 14.139.000,- Kata Kunci : Blok, Ponton, Modifikasi, segi ekononomis,waktu


Abstract

THE ANALYSIS OF TIME AND COST A PONTON COMPLETION PROJECT BY USING THE LEFTOVER SHIP BLOCK FROM BOX SHAPE BULK CARIER (BSBC) 50,000 DWT SERIES M00256 AND M00257 IN PT. PAL INDONESIA PERSERO By : Alfiatus Sholeha NRP : 6110030003 Abstract The failed projects of the Box Shape Bulk Carrier (BSBC) 50,000 DWT series M00256 and M00257 have caused a lot of out-of-use blocks in the side launching area of Commersial Ship Division of PT. PAL useless. To make it profitable, an effort of reusing those blocks is taken to build a ponton. By doing this, that no-use stuff will later be economically beneficial for the company, namely for ship repairs and a block carrier. In this final task, the analysis undergone is on details cost cutting and welding processes as well as the time that is required to modify block DB5 and DB6 to become a ponton. Calculation process is done by measuring each block to do the cutting manually of DB5 and DB6 blocks and also to joint the blocks that suit the design and type of welding. The final result of the modifications of the block remnant from M00256 and M00257 is the total time ? 45 days. It reaches the figure Rp. 358.175.956,- which cover the labor cost for cutting old blocks Rp. 4.320.000,- ,consumable cost Rp.319.200.000,- , welding labor cost Rp. 2.700.000,- and consumable cost for an Rp. 31.955.956,- and for the final result off additional it reaches the figures Rp.86.119.929,- which cover consumable Rp.65.589.753,- and the cost labor Rp. 14.139.000,-. Keywords: Block, Ponton, Modification, terms ekononomis, time


Detil Peneliti

Dosen Pembimbing 1 :Fais Hamzah
Dosen Pembimbing 2 :

Program Studi : D3 - TEKNIK PERANCANGAN DAN KONSTRUKSI KAPAL
Angkatan : 2010


Untuk mendapatkan versi full dari dokumen penelitian ini, Anda dapat melihat koleksi Buku Tugas Akhir di Perpustakaan Politeknik Perkapalan Negeri Surabaya pada jam kerja. Atau Anda dapat menghubungi penulis secara personal.